Trunk Road Information Manual — Requirements & Additional Information

PUBLISHED BY · Transport Scotland, released by the Scottish GovernmentNATIONS · ScotlandCHECKED · 6 November 2026

This document is cited in one guide on this site. Below you will find the official text, the version we read, the guides that cite it and the exact passages they quote.

OFFICIAL TEXT · PRIMARY SOURCE

Read the official version

The full document is published at the source below. Check its date before relying on it.

VERSION AND DATES

The version the guides were researched from.

VersionStatusSource
UndatedVersion 1.2, February 2024 (month stated; exact issue day not published)—gov.scot

GUIDES THAT CITE IT

QUOTED PASSAGES

Passages quoted in the guides 2 PASSAGES

The exact words the guides rely on, with where each passage sits in the document and the version it comes from.

  1. §3.2.4.1, item 1(a)–(c), printed p. 51

    The Operating Company's inspection team shall rectify the category 1 defect when identified. This shall be through undertaking immediate temporary or permanent repairs, removing the hazard or by taking any other measures to protect trunk road users. This should be undertaken in accordance with the following timescales: a. The timescale stated for the defect/asset (see Appendix D), or; b. 06:00 the following day for Category 1 defects on the carriageway, or; c. within 24 hours of identification for all other Category 1 defects.
  2. §3.2.4.1, item 2(a)–(b), printed p. 51

    If a temporary repair has been carried out, the deferred permanent repair period shall be: a. 56 days for Bridge Parapets. b. 28 days for all other defects.

General information, not legal advice. Always check the official text.

Install on iPhone or iPad

  1. Tap the Share button in Safari (the square with an upward arrow).
  2. Choose Add to Home Screen.
  3. Tap Add. The app appears next to your other apps.

The first steps after a collision, the checklists and the glossary stay available without signal.