Legal explainer · Injury claims, compensation and settlement
Should I settle before I know how my injury will turn out?
Before you accept a final injury settlement, ask your solicitor to explain the medical uncertainty, the future losses included and any risk the court will expressly reserve. [1] [21] [35] An ordinary full-and-final settlement can prevent another claim for later deterioration, so a worse recovery alone is not a reason to expect more compensation. [40] [47] [48] Provisional damages preserve a defined route back for a specified serious future disease or deterioration, but eligibility, court orders and time limits differ in England and Wales, Scotland and Northern Ireland. [10] [13] [21] [28] [31]
- Updated
- Sources checked
- November 2026
- Reading time
- 17 minutes
- Where it applies
- England and Wales, Scotland, Northern Ireland
- Category
- Injury claims, compensation and settlement
Contents 13 sections
- Who this guide is for
- Before you decide: identify what is still uncertain
- Work out exactly what the settlement closes
- England and Wales: waiting, offers and provisional damages
- Scotland: the statutory conditions and your decree
- Northern Ireland: High Court and County Court routes
- After settlement: worsening symptoms and challenges are different
- Keep the type of payment separate from the risks reserved
- Deadlines
- Your checklist
- Common questions
- Court decisions in this guide
- Sources
Who this guide is for
Who it is for
People considering or already party to a road-injury settlement with an uncertain prognosis.
Ordinary final releases and court awards preserving specified future risks.
Not covered here
Individual medical prognosis, valuation or calculation of a settlement.
Detailed limitation, interim-payment, costs, payment-structure and professional-negligence advice: see linked guides.
Independent claims of relatives after death and asbestos-specific statutory exceptions.
Dates and the rules in force
No single accident-date gateway for the whole topic. The RTA Small Claims Protocol and commenced whiplash restriction have the specific 31 May 2021 date described in the England and Wales section.
Check the accident/cause-of-action date, start of proceedings, capacity at settlement, acceptance date and the actual order and extension dates.
The cited sheriff-court chapter applies to actions lodged on or after 22 September 2015; earlier actions need their applicable version.
Northern Ireland County Court Order 25A became operative on 6 January 2023; the High Court uses separate Order 37 provisions.
Northern Ireland High Court Practice Direction 4/2026 has effect from 13 October 2026; it is not a County Court protocol.
Before you decide: identify what is still uncertain
Applies to: UK-wideAsk your solicitor to explain what the medical evidence can currently say about recovery, future treatment, ability to work and care needs, and which matters need a further report or more time. Ask the medical expert to address the uncertainty rather than treating a prediction as a guarantee. In England and Wales the Personal Injury Protocol allows the loss schedule to remain provisional and requires continuing losses to be identified; in Northern Ireland the High Court practice direction expressly addresses short, medium and long-term prognosis and financial loss. Scotland’s provisional-damages provisions likewise require evidence of the particular future risk. [1] [35] [21]
Keep your solicitor informed about changes, and ask for an updated assessment before authorising settlement if the report no longer describes your position. Check that future earnings, care and other claimed losses have been considered, not just symptoms today. These are practical steps drawn from the evidence and valuation requirements, rather than a medical test for when you are ready to settle. Read how medical reports are used and corrected. [1] [35] [21]
Waiting for recovery is not itself a general extension of the time for bringing proceedings. Ask your solicitor to identify your applicable time limit and how to protect the claim while evidence develops. The starting points and exceptions differ between the systems; use the injury claim time-limit guide, or urgent help when a time limit is close. [7] [8] [9]
If money is needed now, ask whether an interim payment is available without finally settling the claim. [51] [52] [53] If proceedings have begun, a pause needs to fit the court’s procedure: for example, a Scottish sheriff can grant a sist or vary the timetable on cause shown, for a specified period. Do not assume that you and the insurer can ignore the court timetable. [24]
Work out exactly what the settlement closes
Applies to: UK-wideAn ordinary full-and-final injury settlement can cover both existing loss and the future consequences included in the claim. If you accept that risk without an effective reservation, a worse outcome does not by itself create a fresh claim against the same defendant. The exact agreement and any court order matter: English release law permits even unknown claims to be released where the language shows that intention; Scottish and Northern Irish decisions distinguish an ordinary award allowing for future risks from a provisional award. [40] [44] [47] [48]
Ask your solicitor to identify the parties released, the accident and claims covered, whether liability or only an amount is agreed, and each express exclusion or reservation. A settlement of one part does not necessarily settle every other part. In England and Wales, accepting a Part 36 offer stays the claim on the offer’s terms, or the relevant part if the offer covers only part of the claim. Where court approval is required before the settlement can bind you, that stay takes effect only once approval is given. In Northern Ireland, Knipe illustrates that an agreed division of liability can bind the parties in related proceedings. [40] [17] [50]
Do not treat a phrase such as “subject to medical review” as a substitute for an effective provisional-damages order. Ask who must obtain the order, which risk it preserves and when you could return to court. The official English model order assesses damages on a stated assumption, names the disease or deterioration and records the period for applying; it is a model court order, not a signed agreement for you to use unchanged. [13] [20] [21] [28] [31]
Keep the final offer, acceptance, release or settlement agreement, the court order or Scottish decree, the reports and the loss calculations. Ask your solicitor for copies and a written explanation of any reserved right. Read how to respond to a settlement offer before giving authority to accept. [40] [19] [23] [29] [33]
England and Wales: waiting, offers and provisional damages
Applies to: England and WalesIf your claim falls within the RTA Small Claims Protocol used by Official Injury Claim, you can put an offer on hold while waiting to see whether your injuries recover as the medical report predicts. The defendant can withdraw an offer before acceptance, so waiting does not guarantee that the same offer will remain available. That protocol applies only to claims meeting its scope and exclusions, including its accident-date requirement of 31 May 2021 onwards. [2] [4]
Under that protocol, an agreed settlement is final for injury damages and other protocol damages; it prevents a further claim for those damages. Non-protocol vehicle costs are outside that settlement, rather than a general reservation of later injury loss. [3]
For a covered whiplash claim, section 6 of the Civil Liability Act 2018 restricts a regulated person acting as such who knows or has reason to suspect that the claim is being made: they must first see appropriate evidence before inviting, offering, making or accepting a settlement payment, or arranging or advising such an act. The commencement regulations apply to causes of action accruing on or after 31 May 2021. Having a report does not itself establish that a full-and-final settlement deals adequately with every future risk. [5] [6] [1]
Section 32A of the Senior Courts Act 1981 and section 51 of the County Courts Act 1984 provide for provisional damages where a chance of a future serious disease or serious deterioration caused by the wrong is proved or admitted. This is a court power, not a right to reserve every uncertain symptom. In Kotula the court permitted a specified serious future complication to be covered; the court found a real chance of a specified serious complication on the evidence and then considered whether to exercise its discretion. [10] [11] [44]
Your claim must ask for provisional damages. Under CPR 41.1–41.2, the court initially assesses damages on the assumption that the named disease or deterioration will not occur, and the order identifies the risk and the period for a further application. The period can be for life where the order provides for it; it is not automatically lifelong. Agreed terms still require the appropriate consent judgment and a preserved case file. [12] [13] [18] [19]
If a Part 36 offer includes provisional damages, it must say so, identify the assumption and give the limited period for a further claim. If you accept it, you, as claimant, must apply to the court for the provisional award within 7 days of acceptance. Merely accepting the offer is not the whole procedure. [16]
If the named deterioration later occurs, contact your solicitor well before the order’s period expires. CPR 41.3 requires at least 28 days’ written notice to the defendant and also to the insurer if you know that the defendant is insured for the claim and know the insurer’s identity. Within 21 days after that notice period ends, you must apply for directions. You cannot apply for further damages after the order’s period, as extended by the court, and can make only one application for each named disease or deterioration. Causation remains to be decided on the further claim. [14] [18]
CPR day periods are calculated as clear days. For these 7, 21 and 28 day periods, weekends and bank holidays count; an act due at a closed court office can be done on its next open day. Have your solicitor check service and the order’s actual expiry date rather than relying on an informal calendar reminder. [15]
Scotland: the statutory conditions and your decree
Applies to: ScotlandSection 12 of the Administration of Justice Act 1982 allows the court, on your application, to award provisional damages where a risk of a future serious disease or serious physical or mental deterioration caused by the wrong is admitted or proved. At the time of the wrong, the responsible person must have been a public authority or public corporation, or insured or otherwise indemnified for the claim. These conditions are part of the Scottish route. [21]
The initial award assumes that the specified disease or deterioration will not occur. The court can provide for further damages if it does, and may specify a period for applying. Check the decree: there is no universal period to substitute for its terms. In the sheriff court, your claim must expressly seek provisional damages and state the supporting facts about the risk and the defender’s status or cover. The ordinary rules refer to a crave, averments and a plea in law, but the special personal injury procedure modifies those formal requirements: references to pleas in law are ignored while that procedure applies. Your solicitor should use the requirements for the procedure your case follows. Court of Session pleadings must likewise seek and support provisional damages. [21] [22] [57] [25]
In WW, the Court of Session refused wording that would have allowed a further claim for any asbestos-related condition when the evidence justified only the particular disease, mesothelioma. Harris later treated WW as a provisional award when comparing it with an ordinary full-and-final claim. The point for your road-injury claim is to identify the risk the evidence supports, rather than assuming that every later health change is reserved. [46] [47]
If the covered deterioration occurs, ask your solicitor to check the decree and any specified period promptly. In the sheriff court, you apply by minute in the original action, setting out the further damages sought and supporting facts in the form required by the applicable procedure, and seek authority to serve every other party and any known insurer or indemnifier. In the Court of Session, the minute uses the prescribed conclusion and the court authorises service on the other parties and known insurer or indemnifier. The English 28-day notice and 7-day Part 36 procedure do not govern this route. [23] [57] [26]
Northern Ireland: High Court and County Court routes
Applies to: Northern IrelandParagraph 10 of Schedule 6 to the Administration of Justice Act 1982 provides the statutory framework where a chance of future serious disease or serious deterioration caused by the wrong is proved or admitted. In the High Court, Order 37 rules 7–10 govern provisional awards. The County Court has its own Order 25A, inserted with effect from 6 January 2023. Both routes require a court award identifying the disease or deterioration; an ordinary payment or private label is not enough. [27] [28] [31] [34]
In Loney, a child’s road-accident claim, the High Court explained that a chance of deterioration, seriousness and the court’s discretion must each be considered. It declined provisional damages and assessed the future uncertainties in an ordinary award. Uncertainty alone does not secure a provisional award. [48]
The order identifies the period for returning, unless the court determines otherwise. If there is a specified period and you need an extension, the plaintiff must apply within that period; more than one extension application is possible. For a further-damages claim, give the defendant at least 3 months’ written notice and give that notice to the insurer if you know the defendant is insured for the claim. You must also keep within the order’s period, as extended. Only one further application is permitted for each named disease or type of deterioration. [28] [29] [31] [33]
Within 21 days after the notice period expires, you may seek directions: by summons in the High Court, or by application to the judge in the County Court. This directions provision says “may”; do not replace it with the different English mandatory procedure. The 21-day period starts after the expiry day, and weekends and public holidays within it count. The court rules allow the next open day for a court-office filing that falls due when the office is closed. The notice period is measured in calendar months. Ask your solicitor to check the service and filing dates together with the order’s outer limit. [29] [33] [54] [55] [56]
If the defendant uses the specific written offer-to-submit procedure for provisional damages, the offer must identify the risk and the sum assessed on the assumption that it will not occur. You may accept by written notice within 21 days after receiving that offer, and must then apply to the court for the provisional order. This is the special provisional-damages offer route, not a deadline for every Northern Irish settlement offer. [30] [32]
After settlement: worsening symptoms and challenges are different
Applies to: UK-wideFirst establish whether the settlement was ordinary full and final, or backed by an order reserving the particular disease or deterioration you now have. With a provisional award, the question is whether the event covered by the order has occurred, whether it was caused by the original wrong and whether you are within its procedure and time limit. It is not an opportunity to reassess the whole claim because the original amount now seems low. [12] [14] [18] [21] [29] [33]
With an ordinary final settlement, a disappointing recovery or a report that now looks too optimistic is not, by itself, a right to reopen. A challenge to the agreement or court order requires a distinct legal ground and the correct procedure for the legal system concerned. Obtain advice promptly and provide the actual settlement documents, the evidence available when you settled and the new evidence. [40] [43] [45] [48]
England and Wales: Dunhill concerned a claimant who lacked capacity to conduct her actual claim when she settled. The Supreme Court set aside the unapproved settlement and consent order: recording agreement in an order had not supplied the approval required by CPR 21.10. A later loss of capacity or regret about a settlement is a different question. Forsyth later distinguished a claimant with litigation capacity from one requiring that protective procedure. [41] [36] [49]
Hayward shows that proven fraudulent misrepresentation which induced settlement can justify setting it aside even where the insurer had suspicions before settling. It was a fraud case, not a case of an honestly uncertain prognosis becoming worse. The judgment did not decide the due-diligence proposition conceded for that appeal. Brennan also shows why “mistake” is not a general escape: the Court of Appeal upheld a compromise despite a later decision on the law which would have helped the claimant. [42] [43]
Scotland: the court examines the particular contract, decree and alleged defect. In Wills, a commercial settlement case, the court allowed allegations that the other side knowingly took advantage of an error about the legal effect of the settlement to go forward for proof. It did not set aside the settlement at that hearing, and did not establish that every bad bargain or wrong forecast is reducible. Scottish legal capacity also follows its own rules: do not apply the English child/protected-party procedure automatically. For an adult’s ability to instruct or settle, use the guide to representation and capacity. [45] [39]
Northern Ireland: check any required approval as well as the settlement’s scope. Order 80 requires court approval of a settlement relating to a person under disability in High Court proceedings and provides a route to seek approval before proceedings. County Court Order 44 requires approval for a minor’s or patient’s settlement in proceedings. Knipe illustrates that an agreed liability issue can be binding even where the insurer was unaware of the earlier arrangement. These are not general rights to recover extra money when symptoms worsen. [37] [38] [50]
If you believe your representative settled without proper instructions or mishandled the evidence, obtain advice about that issue separately. Use the complaints guide and the professional-negligence guide; do not assume that either route revives the settled injury claim. [50] [43]
Keep the type of payment separate from the risks reserved
Applies to: UK-wideProvisional damages describe the assumption on which damages are assessed and the defined right to return for a serious future risk. They are different from an interim payment while the original claim remains unresolved, and from choosing a lump sum or regular payments. In Kotula the court considered provisional damages alongside an already agreed structure of payments; one did not automatically supply the other. Read lump sums and regular payments for the payment decision. [12] [44] [21] [28] [31]
Before authorising settlement, ask your solicitor to explain the amount, the future risks priced into it, any risks expressly reserved by the court, the procedure if those risks occur, and any approval needed. A clear answer to those questions is more useful than the word “final” or “provisional” on its own. [40] [19] [21] [28] [31] [36]
Deadlines and time limits
- When it starts
- How to count it
- If it is missed
More about this deadline: England and Wales: period for further damages
- Time limit
At least 28 days’ written notice. [14]
- When it starts
The claimant intends to apply for further damages under the provisional award. [14]
- How to count it
- If it is missed
A further claim needs the prescribed notice and a timely directions application. [14]
- Which accidents and dates
CPR 41.3(3)–(5) as at 5 November 2026; only after an award of provisional damages. [14]
More about this deadline: England and Wales: notice of further damages
This notice does not extend the period fixed by the award. [14]
- Time limit
Within 21 days after the 28-day notice period ends. [14]
- When it starts
Expiry of the notice period under CPR 41.3(3) and (4). [14]
- How to count it
- If it is missed
The required next step is a directions application; missing it requires urgent procedural advice and does not itself extend the award. [14]
- Which accidents and dates
CPR 41.3(5) current at 5 November 2026; England and Wales only. [14]
More about this deadline: England and Wales: directions after notice
The order’s return period remains a separate outer limit. [14]
- Time limit
Within 7 days of the date of acceptance. [16]
- When it starts
The offeree accepts a Part 36 offer providing for an award of provisional damages. [16]
- How to count it
- If it is missed
Acceptance is followed by the court application; it is not a substitute for obtaining the provisional award. [16]
- Which accidents and dates
CPR 36.19 current at 5 November 2026; not an ordinary offer-response period and not a Scottish or Northern Irish rule. [16]
More about this deadline: England and Wales: accepted Part 36 provisional offer
The offer must expressly provide for provisional damages, the assumption and the limited return period. [16]
- Time limit
Any period the court specifies in its section 12 order. [21]
- When it starts
The court allows the injured person to apply for further damages if the specified disease or deterioration occurs. [21]
- How to count it
- If it is missed
More about this deadline: Scotland: any period fixed for further damages
Section 12 says the court may specify a period; do not invent a uniform number of years. [21]
- When it starts
- How to count it
Read the order. Apply for an extension within the specified period; the court may extend it if just, and multiple extension applications are permitted. [28] [31] The statutory reference to a month means a calendar month. High Court Order 3 r. 2 starts an after/from period immediately after the trigger date; County Court Order 43 r. 17 starts it at the end of the event day unless expressly inclusive. For a 21-day period, weekends and holidays within it count. Court-office acts due when the office is closed have the next-open-day protection in the relevant rule. [54] [55] [56]
- If it is missed
More about this deadline: Northern Ireland: period for further damages and extension
- How to count it
Give written notice to the defendant and, if the defendant is known to be insured for the claim, the insurer. Months are not the English 28-day period; have service and the calendar end date checked before choosing the application date. [29] [33] The statutory reference to a month means a calendar month. High Court Order 3 r. 2 starts an after/from period immediately after the trigger date; County Court Order 43 r. 17 starts it at the end of the event day unless expressly inclusive. For a 21-day period, weekends and holidays within it count. Court-office acts due when the office is closed have the next-open-day protection in the relevant rule. [54] [55] [56]
- If it is missed
More about this deadline: Northern Ireland: notice of further damages
- How to count it
The plaintiff may seek directions by High Court summons or apply to the County Court judge. Ask the solicitor to calculate the filing date from expiry of the notice and comply with local computation/service rules. [29] [33] The statutory reference to a month means a calendar month. High Court Order 3 r. 2 starts an after/from period immediately after the trigger date; County Court Order 43 r. 17 starts it at the end of the event day unless expressly inclusive. For a 21-day period, weekends and holidays within it count. Court-office acts due when the office is closed have the next-open-day protection in the relevant rule. [54] [55] [56]
- If it is missed
More about this deadline: Northern Ireland: directions after notice
- When it starts
- How to count it
The plaintiff may give the defendant written notice of acceptance in that period and must on acceptance apply for the specified court order. Check the date of receipt and the local computation/service rules. [30] [32] The statutory reference to a month means a calendar month. High Court Order 3 r. 2 starts an after/from period immediately after the trigger date; County Court Order 43 r. 17 starts it at the end of the event day unless expressly inclusive. For a 21-day period, weekends and holidays within it count. Court-office acts due when the office is closed have the next-open-day protection in the relevant rule. [54] [55] [56]
- If it is missed
More about this deadline: Northern Ireland: special provisional-damages offer
Your checklist
Common questions
How should my claim be managed before I know the long-term effects of my injury?Applies to: UK-wide
Ask your solicitor to identify what the medical expert can currently predict, what needs further evidence, and how future earnings, care and other losses are being assessed. Keep the loss assessment up to date and ask whether waiting, an interim payment or a properly supported claim for provisional damages is appropriate. The court’s timetable and the time for starting proceedings still need attention. In England and Wales, the RTA Small Claims Protocol permits a covered offer to be put on hold while you test the predicted recovery, but the defendant may withdraw it before acceptance; Scotland and Northern Ireland use their own court procedures. Do not authorise an ordinary final settlement on the assumption that you can return if recovery is worse. [1] [35] [21] [2] [7] [8] [9]
What would a full-and-final settlement stop me claiming later?Applies to: UK-wide
It can close the injury claim and the future losses within its scope, including consequences that turn out worse than expected. Check the actual release, parties, claims, exceptions and court order with your solicitor. Under English law even unknown claims can be released if the wording shows that intention; Scottish and Northern Irish ordinary awards can assess future risks without leaving a right to return. A partial settlement only closes what it actually covers. For a claim settled under the RTA Small Claims Protocol in England and Wales, injury and other protocol damages are final; the exception for non-protocol vehicle costs does not keep later injury loss open. [40] [47] [48] [17] [50] [3]
Can I reopen my settled injury claim if my symptoms get worse?Applies to: UK-wide
Worsening symptoms alone do not reopen an ordinary final settlement. First have a solicitor check whether there is a provisional-damages order covering this particular disease or deterioration, its causal link to the accident and its time limit. If there is, you may be able to apply for further damages under that order. A challenge to a concluded ordinary settlement is a different route: for example, the English decisions Dunhill and Hayward concerned missing approval for a claimant who lacked litigation capacity, and proven fraud inducing settlement. Mistake is not a general right to undo a bad bargain. Scotland and Northern Ireland require their own rules on the agreement, court order, capacity and procedure to be examined; the English examples do not create a UK-wide reopening application. Get advice promptly with the settlement documents, old reports and new evidence. [14] [18] [21] [29] [33] [41] [42] [43] [45] [37] [38]
How do provisional damages differ from an ordinary full-and-final settlement?Applies to: UK-wide
An ordinary final award settles the claim by allowing for the future within the amount and terms agreed; you bear the risk of a worse outcome within that scope. A provisional award initially values the claim on the assumption that a specified serious disease or deterioration will not happen, and preserves a court route for further damages if that event does happen. You must meet the statutory conditions, obtain the order and comply with its period and procedure. Scotland also requires the responsible person to have been a public authority, public corporation or insured or otherwise indemnified at the time of the wrong. Northern Ireland has separate High Court and County Court rules; English Part 36 time limits do not apply there. Provisional damages are not simply an interim payment or payment by instalments. [40] [47] [48] [12] [10] [13] [21] [28] [31] [44]
Key points
Show the 9 key points of this guide
- Applies to: UK-wide
A final settlement can allocate the risk of future deterioration; the release and order determine what was settled. [40] [47] [48]
- Applies to: UK-wide
Waiting for a prognosis is not a general extension of the time for bringing proceedings. [7] [8] [9]
- Applies to: England and Wales
England and Wales provisional damages require a proved or admitted chance of specified serious disease or deterioration and a court order. [10] [11] [13] [44]
- Applies to: Scotland
Scottish section 12 requires the responsible person to have had the statutory public status or insurance/indemnity at the time of the wrong. [21]
- Applies to: Northern Ireland
Northern Ireland County Court provisional procedure is Order 25A inserted by Schedule 2 to SR 2022/252, operative from 6 January 2023. [31] [34]
- Applies to: England and Wales, Northern Ireland
The English further-claim notice is at least 28 days, followed by a mandatory directions application within 21 days; Northern Ireland uses at least 3 months and a permissive 21-day directions provision. [14] [29] [33]
- Applies to: England and Wales
An English claimant must seek the provisional award within 7 days of acceptance of a Part 36 offer including provisional damages. [16] [15]
- Applies to: UK-wide
A provisional award covers the disease or deterioration specified; it does not generally reopen all damages. [12] [14] [21] [46] [29] [33]
- Applies to: UK-wide
Worsening symptoms alone do not prove a vitiating legal ground; fraud, capacity/approval and mistake depend on the actual legal ground and system. [41] [42] [43] [45] [37] [38]
Check how to respond to your settlement offer
Court decisions in this guide
This guide describes the rules as they stood when it was last updated, on 5 November 2026. If your accident happened before then, some of the rules may have been different.
Sources
- Source 1: Pre-Action Protocol for Personal Injury ClaimsOfficial textOur page on this source
Show the quoted extract
para. 8.1.18.1.1 Where a defendant admits liability which has caused some damage, before proceedings are issued, the claimant should send to that defendant— (a) any medical reports obtained under this Protocol on which the claimant relies; and (b) a schedule of any past and future expenses and losses which are claimed, even if the schedule is necessarily provisional. The schedule should contain as much detail as reasonably practicable and should identify those losses that are ongoing. If the schedule is likely to be updated before the case is concluded, it should say so.
- Source 2: Pre-Action Protocol for Personal Injury Claims below the Small Claims Limit in Road Traffic Accidents (“The RTA Small Claims Protocol”)Official textOur page on this source
Show the 2 quoted extracts
RTA Small Claims Protocol, para. 8.14The claimant’s options on receipt of an offer 8.14 (1) On receipt of an offer to settle, the claimant may select one of the following options from the Portal— (a) accept the offer (see paragraph 10.2); (b) reject the offer (see paragraph 8.19); (c) make a counter offer of their own (see paragraph 8.17); or (d) decide to put the offer “on hold” whilst they wait for developments in their claim. This includes waiting to see if their injuries resolve or improve as predicted in the medical report. (2) Where the claimant decides to put an offer on hold under paragraph (1)(d), the claimant can at any later time accept or reject the offer (unless the offer has been withdrawn under paragraph 8.18) or make a counter offer through the Portal. (3) Each party can make up to 3 offers or counter offers in total through the Portal. All offers and counter offers must be supported by a statement of truth. It is expected that each party should respond to offers or counter offers from the other within a maximum of 10 days. (The parties are encouraged to negotiate rather than start court proceedings.) (3A) Save where paragraph (3B) applies, the claimant is asked in all cases whether they say there is a whiplash injury. This determines whether a tariff amount is then included in the claimant’s counter offer. (3B) Where the parties have agreed in previous offers on whether or not there is a whiplash injury, the parties will not be asked to change that agreement. (4) Where the claimant or the compensator makes an offer in a claim for whiplash injury, that offer must include the appropriate tariff amount, selected from the drop down box provided. (4A) Where the compensator has selected the higher tariff for whiplash injuries and minor psychological injuries, the claimant will not be able to change from that tariff to the lower tariff for whiplash injuries only in any offer. (5) The claimant may also add further documents in support of any counter offer using the Portal. (6) Where the details of an offer are completed by an authorised representative on behalf of the claimant, the statement of truth must be signed by the claimant in accordance with paragraph 1.3(3). The authorised representative must tick the appropriate boxes as confirmation that they have uploaded the Settlement Offer Form including the statement of truth signed by the claimant.
RTA Small Claims Protocol, para. 8.18Withdrawal of offers or counter-offers 8.18 (1) The claimant or the compensator may not withdraw an offer until 10 days have passed since the date on which the offer was made, but may otherwise withdraw an offer at any time. Paragraph (7) below explains when an offer can be withdrawn on the Portal but does not restrict the right to withdraw in this paragraph. (2) An offer once withdrawn is no longer available for acceptance. (3) The effect of withdrawing an offer is to leave the party doing so with no offer on the Portal. (4) Where a party withdraws an offer, they may, subject to paragraph (5), replace that offer with a new offer. If the offer is withdrawn and the new offer made— (a) before the other party has made their next offer under paragraph 8.14, the new offer counts for the purposes of paragraph 8.14(3) as the same number offer as the withdrawn offer; (b) after the other party has made their next offer under paragraph 8.14, the new offer will count for the purposes of paragraph 8.14(3) as their next offer. (5) Where the compensator withdraws their offer after the claimant has made their third and final offer, the compensator may not make a new offer on the Portal. (6) The effect of the compensator withdrawing an offer and not replacing it with a new offer (or not being able to do so) is also to remove any comments made by the compensator on the losses claimed. These comments will not then be available for the court to consider in any proceedings started by the claimant. (7) Either party may withdraw an offer by using the “withdraw offer” facility on the Portal at any time until the Portal creates the Court Valuation Form. The Portal will warn the parties when this point is reached. (8) Any withdrawal after the point identified under paragraph (7) above must be made by giving notice in writing to the other party, including by electronic means whether by using the message facility on the Portal or otherwise. Such notice is effective at the time it is received by the other party. (Paragraphs 11.3 and 11.9 explain when the Portal creates the Court Valuation Form.)
- Source 3: Pre-Action Protocol for Personal Injury Claims below the Small Claims Limit in Road Traffic Accidents (“The RTA Small Claims Protocol”)Official textOur page on this source
Show the quoted extract
RTA Small Claims Protocol, para. 10.9The effect of settling the claim 10.9 Settlement of the claim under paragraph 10.2 or 10.3 represents final settlement of all claims for damages for injury and for other protocol damages but does not prevent the claimant from pursuing any claim for non-protocol vehicle costs arising from the same accident outside this Protocol.
- Source 4: Pre-Action Protocol for Personal Injury Claims below the Small Claims Limit in Road Traffic Accidents (“The RTA Small Claims Protocol”)Official textOur page on this source
Show the quoted extract
RTA Small Claims Protocol, paras 4.2–4.4When to use this Protocol 4.2 This Protocol applies to any claim where all of the following conditions apply— (1) the claim arises from a road traffic accident which occurred in England or Wales on or after31 May 2021; (2) the claim includes a claim for damages for injury; and (3) the claimant values the overall claim at no more than £10,000 and the claim for damages for injury at no more than £5,000, save that the value of any non-protocol vehicle costs is excluded for the purposes of valuing the claim in this Protocol. 4.3 Even if all of the conditions in paragraph 4.2 do apply, this Protocol does not apply to a claim— (a) in respect of a breach of duty owed to a road user by a person who is not a road user; (b) where the injuries which are claimed for were at least partly caused by a breach by the defendant of one or more of the relevant provisions as defined by section 53 of the Health and Safety at Work etc Act 1974; (c) to the MIB pursuant to the Untraced Drivers’ Agreement 2017 or any subsequent or supplementary Untraced Drivers’ Agreements (this agreement applies where a claim involves an accident with a driver who has not been identified – also known as a “hit and run” – this Protocol should not be used when making such a claim); (d) where at the time the accident occurred, the claimant was a vulnerable road user; (e) where the claimant or defendant acts as a personal representative of a deceased person; (f) where on the date the claim is started, the claimant is a child; (g) where the claimant or defendant is a protected party as defined in rule 21.1(2); (h) where the claimant is bankrupt; or (i) where the defendant’s vehicle is registered outside the United Kingdom. 4.4 If the claimant uses this Protocol where any of the circumstances in paragraph 4.3 apply, the claim will not be accepted, and the claimant will be notified of the reason for non-acceptance through the Portal. The claimant should also consider seeking advice in these circumstances.
- Source 5: Civil Liability Act 2018Official textOur page on this source
Show the quoted extract
Civil Liability Act 2018, s. 6(1) A regulated person is in breach of this section if— (a) the regulated person knows or has reason to suspect that a whiplash claim is being made, (b) the regulated person does, or arranges or advises the doing of, an act mentioned in subsection (2), without first seeing appropriate evidence of the whiplash injury or injuries, and (c) the regulated person is acting as such when the regulated person does, or arranges or advises the doing of, that act. (2) The acts referred to in subsection (1) are— (a) inviting a person to offer a payment in settlement of the claim; (b) offering a payment in settlement of the claim; (c) making a payment in settlement of the claim; (d) accepting a payment in settlement of the claim. (3) The Lord Chancellor may by regulations make provision about what constitutes appropriate evidence of an injury for the purposes of this section. (4) The regulations may in particular— (a) specify the form of any evidence of an injury; (b) specify the descriptions of persons who may provide evidence of an injury; (c) require persons to be accredited for the purpose of providing evidence of an injury; (d) make provision about accrediting persons, including provision for a person to be accredited by a body specified in the regulations. (5) A statutory instrument containing regulations under this section is subject to affirmative resolution procedure. (6) In this section “whiplash claim” means a claim that consists only of, or so much of a claim as consists of, a claim for damages for pain, suffering and loss of amenity caused by— (a) one or more whiplash injuries suffered by a person on a particular occasion because of driver negligence and in relation to which section 3 applies, or (b) a whiplash injury or injuries within paragraph (a) suffered by a person on a particular occasion and one or more minor psychological injuries suffered by the person on the same occasion as the whiplash injury or injuries.
- Source 6: The Civil Liability Act 2018 (Commencement No. 1 and Transitional Provision) Regulations 2021Official textOur page on this source
Show the 2 quoted extracts
reg. 44. The provisions which come into force under these Regulations apply only to causes of action which accrue on or after 31st May 2021.
reg. 33. Part 1 (whiplash) of the 2018 Act, in so far as it is not already in force, comes into force on 31st May 2021.
- Source 7: Limitation Act 1980Official textOur page on this source
Show the quoted extract
Limitation Act 1980, s. 11(1) This section applies to any action for damages for negligence, nuisance or breach of duty (whether the duty exists by virtue of a contract or of provision made by or under a statute or independently of any contract or any such provision) where the damages claimed by the plaintiff for the negligence, nuisance or breach of duty consist of or include damages in respect of personal injuries to the plaintiff or any other person. (1A) This section does not apply to any action brought for damages under section 3 of the Protection from Harassment Act 1997. (2) None of the time limits given in the preceding provisions of this Act shall apply to an action to which this section applies. (3) An action to which this section applies shall not be brought after the expiration of the period applicable in accordance with subsection (4) or (5) below. (4) Except where subsection (5) below applies, the period applicable is three years from— (a) the date on which the cause of action accrued; or (b) the date of knowledge (if later) of the person injured. (5) If the person injured dies before the expiration of the period mentioned in subsection (4) above, the period applicable as respects the cause of action surviving for the benefit of his estate by virtue of section 1 of the Law Reform (Miscellaneous Provisions) Act 1934 shall be three years from— (a) the date of death; or (b) the date of the personal representative’s knowledge; whichever is the later. (6) For the purposes of this section “personal representative” includes any person who is or has been a personal representative of the deceased, including an executor who has not proved the will (whether or not he has renounced probate) but not anyone appointed only as a special personal representative in relation to settled land; and regard shall be had to any knowledge acquired by any such person while a personal representative or previously. (7) If there is more than one personal representative, and their dates of knowledge are different, subsection (5)(b) above shall be read as referring to the earliest of those dates.
- Source 8: Prescription and Limitation (Scotland) Act 1973Official textOur page on this source
Show the quoted extract
Prescription and Limitation (Scotland) Act 1973, s. 17(1) This section applies to an action of damages where the damages claimed consist of or include damages in respect of personal injuries, being an action (other than an action to which section 18 of this Act applies) brought by the person who sustained the injuries or any other person. (1A) This section does not apply to an action of damages in respect of personal injuries to which section 18ZA applies. (2) Subject to subsection (3) below and section 19A of this Act, no action to which this section applies shall be brought unless it is commenced within a period of 3 years after— (a) the date on which the injuries were sustained or, where the act or omission to which the injuries were attributable was a continuing one, that date or the date on which the act or omission ceased, whichever is the later; or (b) the date (if later than any date mentioned in paragraph (a) above) on which the pursuer in the action became, or on which, in the opinion of the court, it would have been reasonably practicable for him in all the circumstances to become, aware of all the following facts— (i) that the injuries in question were sufficiently serious to justify his bringing an action of damages on the assumption that the person against whom the action was brought did not dispute liability and was able to satisfy a decree; (ii) that the injuries were attributable in whole or in part to an act or omission; and (iii) that the defender was a person to whose act or omission the injuries were attributable in whole or in part or the employer or principal of such a person. (3) In the computation of the period specified in subsection (2) above there shall be disregarded any time during which the person who sustained the injuries was under legal disability by reason of nonage or unsoundness of mind.
- Source 9: The Limitation (Northern Ireland) Order 1989Official textOur page on this source
Show the quoted extract
art. 7(1)–(4)(1) This Article applies to any action for damages for negligence, nuisance or breach of duty (whether the duty exists by virtue of a contract or of provision made by or under a statute or independently of any contract or any such provision) where the damages claimed by the plaintiff for the negligence, nuisance or breach of duty consist of or include damages in respect of personal injuries to the plaintiff or any other person. (1A) This Article does not apply to any action brought for damages under Article 5 of the Protection from Harassment (Northern Ireland) Order 1997. (2) Articles 4 and 6 do not apply to an action to which this Article applies. (3) Subject to Article 50, an action to which this Article applies may not be brought after the expiration of the period specified in paragraphs (4) and (5). (4) Except where paragraph (5) applies, that period is three years from— (a) the date on which the cause of action accrued, or (b) the date of knowledge (if later) of the person injured.
- Source 10: Senior Courts Act 1981Official textOur page on this source
Show the quoted extract
Senior Courts Act 1981, s. 32A(1) This section applies to an action for damages for personal injuries in which there is proved or admitted to be a chance that at some definite or indefinite time in the future the injured person will, as a result of the act or omission which gave rise to the cause of action, develop some serious disease or suffer some serious deterioration in his physical or mental condition. (2) Subject to subsection (4) below, as regards any action for damages to which this section applies in which a judgment is given in the High Court, provision may be made by rules of court for enabling the court, in such circumstances as may be prescribed, to award the injured person— (a) damages assessed on the assumption that the injured person will not develop the disease or suffer the deterioration in his condition; and (b) further damages at a future date if he develops the disease or suffers the deterioration. (3) Any rules made by virtue of this section may include such incidental, supplementary and consequential provisions as the rule-making authority may consider necessary or expedient. (4) Nothing in this section shall be construed— (a) as affecting the exercise of any power relating to costs, including any power to make rules of court relating to costs; or (b) as prejudicing any duty of the court under any enactment or rule of law to reduce or limit the total damages which would have been recoverable apart from any such duty.
- Source 11: County Courts Act 1984Official textOur page on this source
Show the quoted extract
County Courts Act 1984, s. 51(1) This section applies to an action for damages for personal injuries in which there is proved or admitted to be a chance that at some definite or indefinite time in the future the injured person will, as a result of the act or omission which gave rise to the cause of action, develop some serious disease or suffer some serious deterioration in his physical or mental condition. (2) Subject to subsection (4), as regards any action for damages to which this section applies in which a judgment is given in the county court, provision may be made by rules of court for enabling the court, in such circumstances as may be prescribed, to award the injured person— (a) damages assessed on the assumption that the injured person will not develop the disease or suffer the deterioration in his condition; and (b) further damages at a future date if he develops the disease or suffers the deterioration. (3) Any rules made by virtue of this section may include such incidental, supplementary and consequential provisions as the Civil Procedure Rule Committee may consider necessary or expedient. (4) Nothing in this section shall be construed— (a) as affecting the exercise of any power relating to costs, including any power to make rules of court relating to costs; or (b) as prejudicing any duty of the court under any enactment or rule of law to reduce or limit the total damages which would have been recoverable apart from any such duty. (5) In this section “personal injuries” includes any disease and any impairment of a person’s physical or mental condition.
- Source 12: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 41.1(1) This Section of this Part applies to proceedings to which SCA s.32A or CCA s.51 applies. (2) In this Section— (a) “SCA s.32A” means section 32A of the Supreme Court Act 1981; (b) “CCA s.51” means section 51 of the County Courts Act 1984; and (c) “award of provisional damages” means an award of damages for personal injuries under which— (i) damages are assessed on the assumption referred to in SCA s.32A or CCA s.51 that the injured person will not develop the disease or suffer the deterioration; and (ii) the injured person is entitled to apply for further damages at a future date if he develops the disease or suffers the deterioration.
- Source 13: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 41.2(1) The court may make an order for an award of provisional damages if— (a) the particulars of claim include a claim for provisional damages; and (b) the court is satisfied that SCA s.32A or CCA s.51 applies. (Rule 16.4(1)(d) sets out what must be included in the particulars of claim where the claimant is claiming provisional damages) (2) An order for an award of provisional damages— (a) must specify the disease or type of deterioration in respect of which an application may be made at a future date; (b) must specify the period within which such an application may be made; and (c) may be made in respect of more than one disease or type of deterioration and may, in respect of each disease or type of deterioration, specify a different period within which a subsequent application may be made. (3) The claimant may make more than one application to extend the period specified under paragraph (2)(b) or (2)(c).
- Source 14: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 41.3(1) The claimant may not make an application for further damages after the end of the period specified under rule 41.2(2), or such period as extended by the court. (2) Only one application for further damages may be made in respect of each disease or type of deterioration specified in the award of provisional damages. (3) The claimant must give at least 28 days written notice to the defendant of his intention to apply for further damages. (4) If the claimant knows— (a) that the defendant is insured in respect of the claim; and (b) the identity of the defendant’s insurers, he must also give at least 28 days written notice to the insurers. (5) Within 21 days after the end of the 28 day notice period referred to in paragraphs (3) and (4), the claimant must apply for directions. (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- Source 15: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 2.8(1) This rule shows how to calculate any period of time for doing any act which is specified— (a) by these Rules; (b) by a practice direction; or (c) by a judgment or order of the court. (2) A period of time expressed as a number of days shall be computed as clear days. (3) In this rule “clear days” means that in computing the number of days— (a) the day on which the period begins; and (b) if the end of the period is defined by reference to an event, the day on which that event occurs, are not included. Examples (i) Notice of an application must be served at least 3 days before the hearing. An application is listed to be heard on Friday 20 October. The last date for service is Monday 16 October. (ii) The court is to fix a date for a hearing. The hearing must be at least 28 days after the date of notice. If the court gives notice of the date of the hearing on 1 October, the earliest date for the hearing is 30 October. (iii) Particulars of claim must be served within 14 days of service of the claim form. The claim form is served on 2 October. The last day for service of the particulars of claim is 16 October. (4) Where the specified period— (a) is 5 days or less; and (b) includes— (i) a Saturday or Sunday; or (ii) a Bank Holiday, Christmas Day or Good Friday, that day does not count. Example Notice of an application must be served at least 3 days before the hearing. An application is to be heard on Monday 20 October. The last date for service is Tuesday 14 October. (5) When the period specified— (a) by these Rules or a practice direction; or (b) by any judgment or court order, for doing any act at the court office ends on a day on which the office is closed, that act shall be in time under these rules if done on the next day on which the court office is open.
- Source 16: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 36.19(1) An offeror may make a Part 36 offer in respect of a claim which includes a claim for provisional damages. (2) Where the offeror does so, the Part 36 offer must specify whether or not the offeror is proposing that the settlement shall include an award of provisional damages. (3) Where the offeror is offering to agree to the making of an award of provisional damages, the Part 36 offer must also state— (a) that the sum offered is in satisfaction of the claim for damages on the assumption that the injured person will not develop the disease or suffer the type of deterioration specified in the offer; (b) that the offer is subject to the condition that the claimant must make any claim for further damages within a limited period; and (c) what that period is. (4) Rule 36.6 applies to the extent that a Part 36 offer by a defendant includes an offer to agree to the making of an award of provisional damages. (5) If the offeree accepts the Part 36 offer, the claimant must, within 7 days of the date of acceptance, apply to the court for an award of provisional damages under rule 41.2.
- Source 17: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 36.14(1) If a Part 36 offer is accepted, the claim will be stayed. (2) In the case of acceptance of a Part 36 offer which relates to the whole claim, the stay will be upon the terms of the offer. (3) If a Part 36 offer which relates to part only of the claim is accepted, the claim will be stayed as to that part upon the terms of the offer. (4) If the approval of the court is required before a settlement can be binding, any stay which would otherwise arise on the acceptance of a Part 36 offer will take effect only when that approval has been given. (5) Any stay arising under this rule will not affect the power of the court— (a) to enforce the terms of a Part 36 offer; or (b) to deal with any question of costs (including interest on costs) relating to the proceedings. (6) Unless the parties agree otherwise in writing, where a Part 36 offer that is or includes an offer to pay or accept a single sum of money is accepted, that sum must be paid to the claimant within 14 days of the date of— (a) acceptance; or (b) the order when the court makes an order under rule 41.2 (order for an award of provisional damages) or rule 41.8 (order for an award of periodical payments), unless the court orders otherwise. (7) If such sum is not paid within 14 days of acceptance of the offer, or such other period as has been agreed, the claimant may enter judgment for the unpaid sum. (8) Where— (a) a Part 36 offer (or part of a Part 36 offer) which is not an offer to which paragraph (6) applies is accepted; and (b) a party alleges that the other party has not honoured the terms of the offer, that party may apply to enforce the terms of the offer without the need for a new claim.
- Source 18: PRACTICE DIRECTION 41A – PROVISIONAL DAMAGESOfficial textOur page on this source
Show the quoted extract
PD 41A para. 22.1 When giving judgment at trial the judge will: (1) specify the disease or type of deterioration, or diseases or types of deterioration, which (a) for the purpose of the award of immediate damages it has been assumed will not occur, and (b) will entitle the claimant to further damages if it or they do occur at a future date, (2) give an award of immediate damages, (3) specify the period or periods within which an application for further damages may be made in respect of each disease or type of deterioration, and (4) direct what documents are to be filed and preserved as the case file in support of any application for further damages. 2.2 The claimant may make an application or applications to extend the periods referred to in paragraph 2.1(3) above. 2.3 A period specified under paragraph 2.1(3) may be expressed as being for the duration of the life of the claimant. 2.4 The documents to be preserved as the case file (‘the case file documents’) referred to in paragraph 2.1(4) will be set out in a schedule to the judgment as entered. 2.5 Causation of any further damages within the scope of the order shall be determined when any application for further damages is made. 2.6 A form for a provisional damages judgment is set out in the Annex to this practice direction.
- Source 19: PRACTICE DIRECTION 41A – PROVISIONAL DAMAGESOfficial textOur page on this source
Show the quoted extract
PD 41A para. 44.1 An application to give effect to a consent order for provisional damages should be made in accordance with CPR Part 23. If the claimant is a child or protected party the approval of the court must also be sought and the application for approval will normally be dealt with at a hearing. 4.2 The order should be in the form of a consent judgment and should contain: (1) the matters set out in paragraph 2.1(1) to (3) above, and (2) a direction as to the documents to be preserved as the case file documents, which will normally be (a) the consent judgment, (b) any statements of case, (c) an agreed statement of facts, and (d) any agreed medical report(s). 4.3 The claimant or his legal representative must lodge the case file documents in the court office where the proceedings are taking place for inclusion in the court file. The court file should be endorsed as in paragraph 3.3(2) above, and the case file documents preserved as in paragraph 3.3(3) above.
- Source 20: PRACTICE DIRECTION 41A – PROVISIONAL DAMAGESOfficial textOur page on this source
Show the quoted extract
PD 41A Annex(Title of proceedings) THIS CLAIM having been tried before [title and name of judge] without a jury at [the Royal Courts of Justice or as may be] and [title and name of judge] having ordered that judgment as set out below be entered for the claimant IT IS ORDERED – (1) that the defendant pay the claimant by way of immediate damages the sum of £…………… (being (i) £………….. for special damages and £…………. [agreed interest][interest at the rate of …… from………..to…………] (ii) £………….. for general damages and £………….. [agreed interest][interest at the rate of 2% from……… to………..] and (iii) £…………… for loss of future earnings and/or earning capacity) on the assumption that the claimant would not at a future date as a result of the act or omission giving rise to the claim develop the following disease/type of deterioration namely [set out disease or type of deterioration] (2) that if the claimant at a further date does develop that [disease][type of deterioration] he should be entitled to apply for further damages provided that the application is made on or before [set out period] (3) that the documents set out in the schedule to this order be filed on the court file and preserved as the case file until the expiry of the period set out in paragraph (2) above or of any extension of that period which has been ordered (4) (costs) SCHEDULE (list documents referred to in paragraph (3))
- Source 21: Administration of Justice Act 1982Official textOur page on this source
Show the quoted extract
Administration of Justice Act 1982, s. 12(1) This section applies to an action for damages for personal injuries in which— (a) there is proved or admitted to be a risk that at some definite or indefinite time in the future the injured person will, as a result of the act or omission which gave rise to the cause of the action, develop some serious disease or suffer some serious deterioration in his physical or mental condition; and (b) the responsible person was, at the time of the act or omission giving rise to the cause of the action, (i) a public authority or public corporation; or (ii) insured or otherwise indemnified in respect of the claim. (2) In any case to which this section applies, the court may, on the application of the injured person, order— (a) that the damages referred to in subsection (4)(a) below be awarded to the injured person; and (b) that the injured person may apply for the further award of damages referred to in subsection (4)(b) below, and the court may, if it considers it appropriate, order that an application under paragraph (b) above may be made only within a specified period. (3) Where an injured person in respect of whom an award has been made under subsection (2)(a) above applies to the court for an award under subsection (2)(b) above, the court may award to the injured person the further damages referred to in subsection (4)(b) below. (4) The damages referred to in subsections (2) and (3) above are— (a) damages assessed on the assumption that the injured person will not develop the disease or suffer the deterioration in his condition; and (b) further damages if he develops the disease or suffers the deterioration. (5) Nothing in this section shall be construed— (a) as affecting the exercise of any power relating to expenses including a power to make rules of court relating to expenses; or (b) as prejudicing any duty of the court under any enactment or rule of law to reduce or limit the total damages which would have been recoverable apart from any such duty. (6) The Secretary of State may, by order, provide that categories of defenders shall, for the purposes of paragraph (b) of subsection (1) above, become or cease to be responsible persons, and may make such modifications of that paragraph as appear to him to be necessary for the purpose. And an order under this subsection shall be made by statutory instrument subject to annulment in pursuance of a resolution of either House of Parliament.
- Source 22: Act of Sederunt (Sheriff Court Ordinary Cause Rules) 1993 — Schedule 1 (Ordinary Cause Rules 1993) — Chapter 36: ACTIONS OF DAMAGESOfficial textOur page on this source
Show the quoted extract
Ordinary Cause Rules r. 36.1236.12. An application under section 12(2)(a) of the Act of 1982 for provisional damages for personal injuries shall be made by including in the initial writ-- (a) a crave for provisional damages; (b) averments in the condescendence supporting the crave, including averments-- (i) that there is a risk that, at some definite or indefinite time in the future, the pursuer will, as a result of the act or omission which gave rise to the cause of action, develop some serious disease or suffer some serious deterioration of his physical or mental condition; and (ii) that the defender was, at the time of the act or omission which gave rise to the cause of action, a public authority, public corporation or insured or otherwise indemnified in respect of the claim; and (c) an appropriate plea-in-law.
- Source 23: Act of Sederunt (Sheriff Court Ordinary Cause Rules) 1993 — Schedule 1 (Ordinary Cause Rules 1993) — Chapter 36: ACTIONS OF DAMAGESOfficial textOur page on this source
Show the quoted extract
Ordinary Cause Rules r. 36.1336.13. (1) An application for further damages by a pursuer in respect of whom an order under section 12(2)(b) of the Act of 1982 has been made shall be made by minute in the process of the action to which it relates and shall include-- (a) a crave for further damages; (b) averments in the statement of facts supporting that crave; and (c) appropriate pleas-in-law. (2) On lodging such a minute in process, the pursuer shall apply by motion for warrant to serve the minute on- (a) every other party; and (b) where such other party is insured or otherwise indemnified, his insurer or indemnifier, if known to the pursuer. (3) Any such party, insurer or indemnifier may lodge answers to such a minute in process within 28 days after the date of service on him. (4) Where answers have been lodged under paragraph (3), the sheriff may, on the motion of any party, make such further order as to procedure as he thinks fit.
- Source 24: Act of Sederunt (Sheriff Court Ordinary Cause Rules) 1993 — Schedule 1 (Ordinary Cause Rules 1993) — Chapter 36: ACTIONS OF DAMAGESOfficial textOur page on this source
Show the quoted extract
Ordinary Cause Rules r. 36.H136.H1 (1) The action may be sisted or the timetable varied by the sheriff on an application by any party to the action by motion. (2) An application under paragraph (1)— (a) shall be placed before the sheriff; and (b) shall be granted only on cause shown. (3) Any sist of an action in terms of this rule shall be for a specific period. (4) Where the timetable issued under rule 36.G1 is varied under this rule, the sheriff clerk shall issue a revised timetable in Form PI5. (5) A revised timetable issued under paragraph (4) shall have effect as if it were a timetable issued under rule 36.G1 and any reference in this Part to any action being taken in accordance with the timetable shall be construed as a reference to its being taken in accordance with the timetable as varied under this rule.
- Source 25: Act of Sederunt (Rules of the Court of Session 1994) 1994 — Rules of the Court of Session 1994, Chapter 43: ACTIONS OF DAMAGES FOR, OR ARISING FROM, PERSONAL INJURIESOfficial textOur page on this source
Show the quoted extract
RCS r. 43.2; PDF pp. 2, 3 (unpaginated)43.2.(1) The summons shall be in Form 43.2-A and there shall be annexed to it a brief statement containing- (a) averments in numbered paragraphs relating only to those facts necessary to establish the claim; and (b) the names of every medical practitioner from whom, and every hospital or other institution in which, the pursuer or, in an action in respect of the death of a person, the deceased received treatment for the personal injuries. (2) An application for an order under section 12(2)(a) of the Administration of Justice Act 1982 (provisional damages for personal injuries) shall be made by including in the summons a conclusion for provisional damages; and, where such an application is made, averments as to the matters referred to in paragraphs (a) and (b) of section 12(1) of that Act shall be included in the statement made under paragraph (1)(a). (3) In paragraph (2) above “provisional damages” means the damages referred to in section 12(4)(a) of the Administration of Justice Act 1982. (4) A summons may include- (a) warrants for intimation insofar as permitted under these Rules; and (b) a specification of documents in Form 43.2-B. (5) In relation to an action to which this Chapter applies, any references to the condescendence of a summons and to articles of the condescendence shall be construed as a reference to the statement required under paragraph (1) above and numbered paragraphs of that statement.
- Source 26: Act of Sederunt (Rules of the Court of Session 1994) 1994 — Rules of the Court of Session 1994, Chapter 43: ACTIONS OF DAMAGES FOR, OR ARISING FROM, PERSONAL INJURIESOfficial textOur page on this source
Show the quoted extract
RCS r. 43.13; PDF p. 8 (unpaginated)43.13.-(1) An application for further damages by a pursuer in respect of whom an order under section 12(2)(b) of the Administration of Justice Act 1982 has been made shall be made by minute and shall include - (a) a conclusion in Form 43.13-A; and (b) averments in the statement of facts supporting that conclusion. (2) On lodging such a minute in process, the pursuer shall apply by motion for warrant to serve the minute on - (a) every other party; and (b) where such other party is insured or otherwise indemnified, his insurer or indemnifier, if known to the pursuer. (3) A notice of intimation in Form 43.13-B shall be attached to the copy of the minute served on a warrant granted on a motion under paragraph (2). (4) Any such party, insurer or indemnifier may lodge answers to such a minute in process within 28 days after the date of service on him.
- Source 27: Administration of Justice Act 1982Official textOur page on this source
Show the quoted extract
Administration of Justice Act 1982, Sch. 6 para. 10(1) This paragraph applies to an action under the law of Northern Ireland for damages for personal injuries in which there is proved or admitted to be a chance that at some definite or indefinite time in the future the injured person will, as a result of the act or omission which gave rise to the cause of action, develop some serious disease or suffer some serious deterioration in his physical or mental condition. (2) Subject to sub-paragraph (4) below, as regards any action for damages to which this paragraph applies in which a judgment is given in the High Court, provision may be made by rules of court for enabling the court, in such circumstances as may be prescribed, to award the injured person— (a) damages assessed on the assumption that the injured person will not develop the disease or suffer deterioration in his condition; and (b) further damages at a furure date if he develops the disease or suffers the deterioration. (3) Any rules made by virtue of this paragraph may include such incidental, supplementary and consequential provisions as the rule-making authority may consider necessary or expedient. (4) Nothing in this paragraph shall be construed— (a) as affecting the exercise of any power relating to costs, including any power to make rules of court relating to costs; or (b) as prejudicing any duty of the court under any enactment or rule of law to reduce or limit the total damages which would have been recoverable apart from any such duty. (5) This paragraph shall have effect in relation to county courts in Northern Ireland as it has effect in relation to the High Court as if references in it to rules of court included references to county court rules. (6) In this paragraph “personal injuries” includes any disease and any impairment of a person’s physical or mental condition.
- Source 28: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the 2 quoted extracts
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 37 r. 7(1) This Part of this Order applies to actions to which paragraph 10 of Schedule 6 to the Administration of Justice Act 1982 (in this Part of this Order referred to as “paragraph 10”) applies. (2) In this Part of this Order “award of provisional damages” means an award of damages for personal injuries under which— (a) damages are assessed on the assumption that the injured person will not develop the disease or suffer the deterioration referred to in paragraph 10; and (b) the injured person is entitled to apply for further damages at a future date if he develops the disease or suffers the deterioration. [E.r. 7]
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 37 r. 8(1) The Court may on such terms as it thinks just and subject to the provisions of this rule make an award of provisional damages if— (a) the plaintiff has pleaded a claim for provisional damages, and (b) the Court is satisfied that the action is one to which paragraph 10 applies. (2) An order for an award of provisional damages shall specify the disease or type of deterioration in respect of which an application may be made at a future date, and shall also, unless the Court otherwise determines, specify the period within which such application may be made. (3) The Court may, on the application of the plaintiff made within the period, if any, specified in paragraph (2), by order extend that period if it thinks it just to do so, and the plaintiff may make more than one such application. (4) An order for an award of provisional damages may be made in respect of more than one disease or type of deterioration and may in respect of each disease or deterioration specify a different period within which an application may be made at a future date. (5) Orders 13 and 19 shall not apply in relation to an action in which the plaintiff claims provisional damages. [E.r. 8]
- Source 29: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the quoted extract
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 37 r. 10(1) This rule applies where the plaintiff, pursuant to an award of provisional damages, claims further damages. (2) No application for further damages may be made after the expiration of the period, if any, specified under rule 8(2), or of such period as extended under rule 8(3). (3) The plaintiff shall give not less than three months’ written notice to the defendant of his intention to apply for further damages and, if the defendant is to the plaintiffs knowledge insured in respect of the plaintiffs claim, to the insurers. (4) The plaintiff may take out a summons for directions as to the future conduct of the action within 21 days after the expiry of the period of notice referred to in paragraph (3). (5) On the bearing of the summons for directions the Court shall give such directions as may be appropriate for the future conduct of the action, including, but not limited to, the disclosure of medical reports and the place, mode and date of the bearing of the application for further damages. (6) Only one application for further damages may be made in respect of each disease or type of deterioration specified in the order for the award of provisional damages. (7) The provisions of Order 29 with regard to the making of interim payments shall, with the necessary modifications, apply where an application is made under this rule. (8) The Court may include in an award of further damages simple interest at such rate as it thinks fit on all or any part thereof for all or any part of the period between the date of notification of the plaintiffs intention to apply for further damages and the date of the award.] [E.r. 10]
- Source 30: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the quoted extract
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 37 r. 9(1) Where an application is made for an award of provisional damages, any defendant may at any time (whether or not he makes a payment into court) make a written offer to the plaintiff— (a) to tender a sum of money (which may include an amount, to be specified in respect of interest) in satisfaction of the plaintiffs claim for damages assessed on the assumption that the injured person will not develop the disease or suffer the deterioration referred to in paragraph 10 and identifying the disease or deterioration in question; and (b) to agree to the making of an award of provisional damages. (2) Any offer made under paragraph (1) shall not be brought to the attention of the Court until after the Court has determined the claim for an award of provisional damages. (3) Where an offer is made under paragraph (1) the plaintiff may, within 21 days after receipt of the offer, give written notice to the defendant of his acceptance of the offer and shall on such acceptance make an application to the Court for an order in accordance with the provisions of rule 8(2). [E.r. 9]
- Source 31: The County Court (Amendment No. 2) Rules (Northern Ireland) 2022Official textOur page on this source
Show the quoted extract
Made Schedule 2, inserted Order 25A, headings and full rr. 1–2Application and interpretation 1.—(1) This Order applies to actions to which paragraph 10 of Schedule 6 to the Administration of Justice Act 1982(1) (referred to as “paragraph 10” in this Order) applies. (2) In this Order— “award of provisional damages” means an award of damages for personal injuries under which— (a) damages are assessed on the assumption that the injured person will not develop the disease or suffer the deterioration referred to in paragraph 10; and (b) the injured person is entitled to apply for further damages at a future date if he develops the disease or suffers the deterioration; “judge” means judge or, in relation to proceedings within the jurisdiction of the district judge, the district judge. Order for provisional damages 2.—(1) The court may, on such terms as it thinks just and subject to the provisions of this rule, make an award of provisional damages if— (a)the plaintiff has claimed provisional damages; and (b)the court is satisfied that the action is one to which paragraph 10 applies. (2) An order for an award of provisional damages shall specify the disease or type of deterioration in respect of which an application may be made at a future date and shall also, unless the court otherwise determines, shall specify the period within which such application may be made. (3) The judge may, on the application of the plaintiff made within the period, if any, specified in paragraph (2), by order extend that period if it thinks it just to do so and the plaintiff may make more than one such application. (4) An order for an award of provisional damages may be made in respect of more than one disease or type of deterioration and may in respect of each disease or deterioration specify a different period within which an application may be made at a future date. (5) Order 12 shall not apply in relation to an action in which the plaintiff claims provisional damages.
- Source 32: The County Court (Amendment No. 2) Rules (Northern Ireland) 2022Official textOur page on this source
Show the quoted extract
Made Schedule 2, inserted Order 25A, r. 3(1)–(3)Offer to submit to an award 3.—(1) Where an application is made for an award of provisional damages any defendant may at any time (whether or not he makes a payment into court) make a written offer to the plaintiff— (a)to tender a sum of money (which may include) an amount, to be specified, in respect of interest) in satisfaction of the plaintiff’s claim for damages assessed on the assumption that the injured person will not develop the disease or suffer the deterioration referred to in paragraph 10 and identifying the disease or deterioration in question; and (b)to agree to the making of an award of provisional damages. (2) Any offer made under paragraph (1) shall not be brought to the attention of the court until after the court has determined the claim for an award of provisional damages. (3) Where an offer is made under paragraph (1) the plaintiff, may within 21 days after receipt of the offer, give written notice to the defendant of his acceptance of the offer and shall on such acceptance make an application to the judge for an order in accordance with the provisions of rule 2(2).
- Source 33: The County Court (Amendment No. 2) Rules (Northern Ireland) 2022Official textOur page on this source
Show the quoted extract
Made Schedule 2, inserted Order 25A, r. 4(1)–(7)Application for award of further damages 4.—(1) This rule applies where the plaintiff, pursuant to an award of provisional damages, claims further damages. (2) No application for further damages may be made after the expiration of the period, if any, specified under rule 2(2), or of such period as extended under rule 2(3). (3) The plaintiff shall give not less than 3 months’ written notice to the defendant of his intention to apply for further damages and, if the defendant is to the plaintiff’s knowledge insured in respect of the plaintiff’s claim, to the insurers. (4) The plaintiff may apply to the judge for directions as to the future conduct of the action within 21 days after the expiry of the period of notice referred to in paragraph (3). (5) On the hearing of the application for directions the judge shall give such directions as may be appropriate for the future conduct of the action including, but not limited to, the disclosure of medical reports and the place, mode and date of the hearing of the application for further damages. (6) Only one application for further damages may be made in respect of each disease or type of deterioration specified in the order for the award of provisional damages. (7) The court may include in an award of further damages simple interest at such rate as it thinks fit on all or any part thereof for all or any part of the period between the date of notification of the plaintiff’s intention to apply for further damages and the date of the award.”
- Source 34: The County Court (Amendment No. 2) Rules (Northern Ireland) 2022Official textOur page on this source
Show the 2 quoted extracts
Original PDF p. 1 (unpaginated), complete r. 11. These Rules may be cited as the County Court (Amendment No. 2) Rules (Northern Ireland) 2022 and shall come into operation on 6th January 2023.
Original PDF p. 1 (unpaginated), full r. 2(a)–(b) with lead-in2. The County Court Rules (Northern Ireland) 1981(c) are amended as follows— (a) After Order 12, insert the new Order 12A set out in Schedule 1 to these Rules; and (b) after Order 25, insert the new Order 25A set out in Schedule 2 to these Rules.
- Source 35: Practice Direction No. 4 of 2026 - Practice Direction for Personal Injury and Damage Only Civil Litigation Actions (High Court of Justice in Northern Ireland, King’s Bench Division)Official textOur page on this source
Show the quoted extract
NI High Court Practice Direction 4 of 2026 (PI and damage only actions), para. 8.1; PDF p. 10 (printed p. 10)8.1 In personal injury cases reports from expert witnesses may be required in relation to: (a) the issue of causation; (b) the plaintiff’s prior incident condition, post incident condition and short, medium and long-term condition and prognosis; (c) identification and quantification of the financial loss elements of the claim including: care, aids and equipment, the construction, purchase and adaptation of premises, travel and transportation costs, therapy cost, loss of earnings, profits and prospect of employment etc.
- Source 36: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
r. 21.10(1)–(2)(1) Where a claim is made— (a) by or on behalf of a child or protected party; or (b) against a child or protected party, no settlement, compromise or payment (including any voluntary interim payment) and no acceptance of money paid into court shall be valid, so far as it relates to the claim by, on behalf of or against the child or protected party, without the approval of the court. (2) Where— (a) before proceedings in which a claim is made by or on behalf of, or against, a child or protected party (whether alone or with any other person) are begun, an agreement is reached for a settlement or compromise or a payment (including any voluntary interim payment) which relates to the claim; and (b) the sole purpose of proceedings is to obtain the approval of the court to a settlement or compromise or a payment (including any voluntary interim payment) which relates to the claim, the claim must— (i) be made using the procedure set out in Part 8 (alternative procedure for claims); and (ii) include a request to the court for approval of the settlement or compromise or payment (including any voluntary interim payment).
- Source 37: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the 2 quoted extracts
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 80 r. 8Where in any proceedings money is claimed by or on behalf of a person under disability, no settlement, compromise or payment and no acceptance of money paid into court, whenever entered into or made, shall so far as it relates to that person’s claim be valid without the approval of the Court. [E.r. 10]
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 80 r. 9(1) Where, before proceedings in which a claim for money is made by or on behalf of a person under disability (whether alone or in conjunction with any other person) are begun, an agreement is reached for the settlement of the claim, and it is desired to obtain the Court’s approval to the settlement, then, notwithstanding anything in Order 5, rule 2, the claim may be made in proceedings begun by originating summons, and in the summons an application may also be made for— (a) the approval of the Court to the settlement and such orders or directions as may be necessary to give effect to it or as may be necessary or expedient under Article 21 of the County Courts (Northern Ireland) Order 1980, or rule 10, or (b) alternatively, directions as to the further prosecution of the claim. (2) Where in proceedings under this rule a claim is made under the Fatal Accidents Order (Northern Ireland) 1977, the originating summons must include the particulars mentioned in Article 4 of the Order. (3) No appearance need be entered to an originating summons under this rule. (4) In this rule “settlement” includes a compromise. [E.r. 11]
- Source 38: County Court Rules (Northern Ireland) 1981Official textOur page on this source
Show the quoted extract
County Court Rules (Northern Ireland) 1981, Order 44 r. 1(1) In any proceedings in which money or damages is or are claimed by or on behalf of or for the benefit of a minor or [ patient] suing either alone or in conjunction with other parties— (a) no settlement or compromise or acceptance of money paid into court, whether before, at or after the hearing, shall be valid without the approval of [ the judge or district judge as the case may be]; (b) no money or damages recovered or awarded in any such proceeding whether by settlement, compromise, payment into court or otherwise before, at or after the hearing shall be paid to any party or to the next friend, guardian ad litem or [ controller] of any party or to any party’s solicitor unless [ the judge or district judge as the case may be] so directs. (2) All money so recovered or adjudged or ordered or awarded or agreed to be paid shall be dealt with as [ the judge or district judge as the case may be] shall direct and the said money or any part thereof may be so directed— (a) to be paid into court and to be invested or otherwise dealt with there; or (b) to be otherwise dealt with. (3) The directions referred to in paragraph (2) may include any general or special directions that [ the judge or district judge as the case may be] may think fit to give, including (without prejudice to the generality of the foregoing provisions) directions as to how the money is to be applied or dealt with and as to any payment to be made either directly or out of the amount paid into court to the plaintiff, to the next friend or to the solicitor for the plaintiff in respect of moneys paid or expenses incurred or for maintenance or otherwise for or on, behalf of or for the benefit of the minor or [ patient] or otherwise, or to the solicitor for the plaintiff in respect of costs. (4) Where, under paragraph (2), money is directed to be paid into court on behalf of a minor, the next friend or solicitor of the minor shall lodge in the Office a copy of the minor’s certificate of birth.
- Source 39: Age of Legal Capacity (Scotland) Act 1991Official textOur page on this source
Show the 2 quoted extracts
s. 1(1)(1) As from the commencement of this Act— (a) a person under the age of 16 years shall, subject to section 2 below, have no legal capacity to enter into any transaction; (b) a person of or over the age of 16 years shall have legal capacity to enter into any transaction.
s. 1(3)(a)–(b)(3) Nothing in this Act shall— (a) apply to any transaction entered into before the commencement of this Act; (b) confer any legal capacity on any person who is under legal disability or incapacity other than by reason of nonage;
- Source 40: Bank of Credit and Commerce International SA v AliRead the judgmentOur page on this source
Show the 3 quoted extracts
Lord Bingham [8]8. I consider first the proper construction of this release. In construing this provision, as any other contractual provision, the object of the court is to give effect to what the contracting parties intended. To ascertain the intention of the parties the court reads the terms of the contract as a whole, giving the words used their natural and ordinary meaning in the context of the agreement, the parties' relationship and all the relevant facts surrounding the transaction so far as known to the parties. To ascertain the parties' intentions the court does not of course inquire into the parties' subjective states of mind but makes an objective judgment based on the materials already identified. The general principles summarised by Lord Hoffmann in Investors Compensation Scheme Ltd v West Bromwich Building Society [1998] 1 WLR 896, at 912-913 apply in a case such as this.
Lord Bingham [9], first sentenceA party may, at any rate in a compromise agreement supported by valuable consideration, agree to release claims or rights of which he is unaware and of which he could not be aware, even claims which could not on the facts known to the parties have been imagined, if appropriate language is used to make plain that that is his intention.
Lord Bingham [10], first sentenceBut a long and in my view salutary line of authority shows that, in the absence of clear language, the court will be very slow to infer that a party intended to surrender rights and claims of which he was unaware and could not have been aware.
- Source 41: Dunhill v BurginRead the judgmentOur page on this source
Show the 3 quoted extracts
Dunhill v Burgin [2014] UKSC 18, [18]I would hold, therefore, that the test of capacity to conduct proceedings for the purpose of CPR Part 21 is the capacity to conduct the claim or cause of action which the claimant in fact has, rather than to conduct the claim as formulated by her lawyers. Judged by that test, it is common ground that Mrs Dunhill did not have the capacity to conduct this claim.
Dunhill v Burgin [2014] UKSC 18, [20]I would not think it just to do so. While every other step in the proceedings might be capable of cure, the settlement finally disposing of the claim is not. For obvious reasons, we have not been asked retrospectively to validate the settlement and consent order made on 7 January 2003. CPR 21.10(1) relevantly provides: “Where a claim is made – (a) by or on behalf of a child or patient [now protected party] (b) against a child or . . . patient [now protected party], no settlement, compromise or payment and no acceptance of money paid into court shall be valid, so far as it relates to the claim, by, on behalf of or against the child or patient [now protected party], without the approval of the court.” The embodiment of this settlement in a consent order did not constitute the approval of the court for the purpose of this rule. The purpose of the rule is to impose an external check on the propriety of the settlement and the accompanying practice direction sets out the evidence which must be placed before the court when approval is sought (see now 21PD.6). Given the finding that Mrs Dunhill was a patient at the time, does this automatically mean that the settlement and court order are of no effect?
Dunhill v Burgin [2014] UKSC 18, [34]I would therefore dismiss both appeals and uphold the order made by Bean J. On the test properly to be applied, Ms Dunhill lacked the capacity to commence and to conduct proceedings arising out of her claim against Mr Burgin. She should have had a litigation friend from the outset and any settlement should have been approved by the court under CPR 21.10(1). We have not been invited to cure these defects nor would it be just to do so. The consent order must be set aside and the case go for trial.
- Source 42: Hayward v Zurich Insurance Company plcRead the judgmentOur page on this source
Show the 9 quoted extracts
[3], quoted Tomlin order, stay and liberty to applyAll further proceedings in this action be stayed, except for the purpose of carrying such terms into effect. Liberty to apply as to carrying such terms into effect.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [18]Subject to one point, the ingredients of a claim for deceit based upon an alleged fraudulent misrepresentation are not in dispute. It must be shown that the defendant made a materially false representation which was intended to, and did, induce the representee to act to its detriment. To my mind it is not necessary, as a matter of law, to prove that the representee believed that the representation was true. In my opinion there is no clear authority to the contrary. However, that is not to say that the representee’s state of mind may not be relevant to the issue of inducement. Indeed, it may be very relevant. For example, if the representee does not believe that the representation is true, he may have serious difficulty in establishing that he was induced to enter into the contract or that he has suffered loss as a result. The judge makes this point clearly and accurately in the third sentence of para 2.5 of his admirable judgment.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [40]As explained above, the questions whether Zurich was induced to enter into the settlement agreement and whether doing so caused it loss are questions of fact, which were correctly decided in its favour by the judge. I accept the submission that the fact that the representee (Zurich) does not wholly credit the fraudster (Mr Hayward) and carries out its own investigations does not preclude it from having been induced by those representations. Qualified belief or disbelief does not rule out inducement, particularly where those investigations were never going to find out the evidence that subsequently came to light. That depended only on the fact that Mr and Mrs Cox subsequently came forward. Only then did Zurich find out the true position. As Mr Hayward knew, Zurich was settling on a false basis.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [48]The second issue (also set out in para 17 above) is in these terms: “Under what circumstances, if any, does the suspicion by the defendant of exaggeration for financial gain on the part of the claimant preclude unravelling the settlement of that disputed claim when fraud is subsequently established?” The answer seems to me to follow from the answer to the first question. As I see it, it is difficult to envisage any circumstances in which mere suspicion that a claim was fraudulent would preclude unravelling a settlement when fraud is subsequently established.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [49]For these reasons I would allow the appeal.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [53]The Court of Appeal rightly rejected Mr Hayward’s application to strike out the action on the ground that the issue was res judicata or that the action was an abuse of the process of the court: [2011] EWCA 641. The claim had been compromised by an agreement but, as Lord Bingham emphasised in HIH Casualty and General Insurance Ltd v Chase[2003] UKHL 6, [2003] 2 Lloyd’s Rep 61, paras 15 and 16, “fraud is a thing apart” and “unravels all”. Once proved, “it vitiates judgments, contracts and all transactions whatsoever” (per Denning LJ in Lazarus Estates Ltd v Beasley [1956] 1 QB 702, 712, cited by Lord Bingham). I refer to this matter because in his judgment now under review Underhill LJ called into question the correctness of the Court of Appeal’s earlier judgment, and Mr Hayward’s arguments on this appeal were similarly flavoured with criticism of it, although it was not open to him to attack it directly.
Hayward v Zurich Insurance Company plc [2016] UKSC 48, [73]It was expressly conceded on behalf of the insurers for the purposes of the present appeal that whenever and however a legal claim is settled, a party seeking to set aside the settlement for fraud must prove the fraud by evidence which it could not have obtained by due diligence at the time of the settlement. It makes no difference to the outcome of the present case and the court heard no argument about whether the concession was correct. Any opinion on the subject would therefore be obiter, and since the court has not considered the relevant authorities (including Commonwealth authorities such as Toubia v Schwenke[2002] NSWCA 34) or academic writing, it is better to say nothing about it.
[3], quoted schedule, settlement sumThe claimant accepts in settlement of his cause of action herein the sum of £134,973.11.
[3], quoted schedule term 4Upon payment by the defendant of the several sums and costs before mentioned, they be discharged from any further liability to the claimant in relation to the claim herein.”
- Source 43: Brennan v Bolt Burdon and othersRead the judgmentOur page on this source
Show the 6 quoted extracts
[1]1. Miss Margaret Brennan is the tenant of a flat of which the London Borough of Islington (Islington) is the landlord. She complains that she has suffered personal injuries from carbon monoxide exposure as a result of gas escaping from a faulty boiler. The exposure is said to have occurred during two periods of time, one between 1988 and November 1995, the other between August 1996 and October 1998. Islington has an obligation to maintain and repair the boiler. On 7 June 2001 the present proceedings were issued. Islington is named as second defendant. The first and third defendants, Bolt Burdon and Leigh Day & Co., are firms of solicitors alleged to have acted negligently when representing Miss Brennan between 1993 and 1996.
[6]6. At some stage the action was transferred to the High Court. On 4 November 2002 an application was made on behalf of Islington to stay the first action until Miss Brennan had performed the agreement to discontinue on the basis that each party would bear its own costs or, alternatively, that the action be struck out on the basis that it had been compromised. On 11 June 2003 Deputy Master Eastman refused Islington’s application but granted permission to appeal. The appeal came before Morland J who, on 30 October 2003, dismissed it.
[17]17. It is apparent from my somewhat meandering survey of the authorities that principles have been developed which may impact on the present appeal but that different principles have been articulated in different types of case, sometimes without cross-reference to each other. For example, KleinwortBenson, a seminal case on mistake of law, was not cited or referred to in Ali, which was decided on construction but perhaps also had the potential for consideration on the basis of a mistake of fact and law. Huddersfield Banking is helpful on the subject of the vitiation of compromises and consent orders but predates the step change in relation to mistake of law. What principles relevant to the resolution of the present appeal can be extracted from these rather diverse authorities? In my judgment, the following propositions emerge: (1) As with any other contracts, compromises or consent orders may be vitiated by a common mistake of law. (2) It is initially a question of construction as to whether the alleged mistake has that consequence. (3) Whilst a general release executed in a prospective or nascent dispute requires clear language to justify an influence of an intention to surrender rights of which the releasor was unaware and could not have been aware (Ali), different considerations arise in relation to the compromise of litigation which the parties have agreed to settle on a give-and-take basis (Huddersfield Banking) (4) For a common mistake of fact or law to vitiate a contract of any kind, it must render the performance of the contract impossible (The Great Peace).
[22] (court’s reasoning, first point)In my judgment, this passage resonates in the present case for a number of reasons. First, this is quite simply not a case of impossibility of performance. The compromise has at all times remained performable, albeit to the disadvantage of Miss Brennan. It seems to me that, in the light of The GreatPeace, that is in itself sufficient to put it beyond the reach of common mistake of law.
[23]23. It follows from what I have said that I would allow Islington’s appeal on the grounds that the evidence does not establish a true mistake of law at all, more a state of doubt; that Miss Brennan’s solicitor was at fault in not inquiring about any appeal in Anderton; that the compromise was a matter of give-and-take which ought not lightly to be set aside; that it is not impossible to perform; and that, as a matter of construction, the risk of a future judicial decision affecting matters to Miss Brennan’s advantage was impliedly accepted and bargained away by her solicitor. In deciding the appeal on these grounds I have remained within the parameters of the submissions of counsel, Mr. Norman having disavowed a simple submission to the effect that a compromise in the course of litigation, entered into on professional advice, should never be vitiated by a subsequent judicial decision in a case to which the instant litigants are not parties, unless the compromise contains a suitable express provision. For my part I suspect that there is scope for a substantive exception to the ambit of mistake of law as a matter of policy in such circumstances and that it could live with what was said in Kleinwort Benson but, as we have heard no submissions about such an approach, this is not the case in which to say anything further about it.
[65]65. On this footing, and without satisfaction, I agree that the appeal must be allowed.
- Source 44: Kotula v EDF Energy Networks (EPN) plc and othersRead the judgmentOur page on this source
Show the 8 quoted extracts
[1]1. The Claimant is a T6 paraplegic having sustained spinal cord injury in a road traffic accident on the 28th September 2006. The accident occurred whilst the Claimant was wheeling his bicycle through road works in the village of Park Street near St Albans. The road works had been left in a dangerous condition, he alleged, and in consequence he attempted to negotiate them but was struck by a heavy goods vehicle travelling past the works. As a result he sustained spinal injuries, internal injuries including a left haemopneumothorax, and a ruptured spleen. He also sustained a brachial plexus injury affecting the left arm. His spinal cord injury is complete at the T6 level.
[2]2. The Claimant was in hospital for seven months and has been left with permanent paralysis affecting both legs and a degree of compromise to his left arm. He is dependent on a wheelchair for mobility and is unlikely ever to be able to walk.
[32] (quotation from Scott Baker J, Willson v Ministry of Defence)The general rule in English law is that damages are assessed on a once-and-for-all basis. Section 32A of the Supreme Court Act 1981 creates a valuable statutory exception. In my judgment, the section envisages a clear and severable risk rather than a continuing deterioration, as is the typical osteoarthritic picture. In my judgment, many disabilities follow a developing pattern in which the precise results cannot be foreseen. Within a general band this or that may or may not occur. Such are not the cases for provisional damages. The courts have to do their best to make an award in the light of a broad medical prognosis. In my judgment, there should be some clear-cut event which, if it occurs, triggers an entitlement to further compensation.
[33]33. The approach of Scott Baker J was approved by the Court of Appeal in Curi v Colina, The Times 14 October 1998, a transcript of which was available to me. The court agreed with the conclusion that the chance concerned “must be more than fanciful.” As Scott Baker J had said “in my view, to qualify as a chance it must be measurable rather than fanciful.” See Curi v Colina at page 13.
[34]34. The Court of Appeal went on to consider the question of seriousness: “The next question is whether the disease or the deterioration which may occur in the future can be described as serious….the disease or deterioration must be such that an award of damages which included a sum for the “chance” will be wholly inadequate to compensate the plaintiff for the position in which he would find himself once the chance had materialised.” Pages 13 to 14.
[35]35. The court considered that causation should not be a bar to the exercise of the power: “The fact that if the serious disease occurs or the serious deterioration materialises there may be an issue on causation should not prevent the court from exercising its power under Section 51, provided that it has been proved on the balance of probabilities that there is a measurable chance of the disease or deterioration materialising.” Page 14
[42]42. I approach this case on the basis that the three stage test formulated by Scott Baker J in Willson v MOD and approved by the Court of Appeal in Curi v Colina is the best approach.
[49]49. For all these reasons, this Claimant will be permitted to treat his lump sum award as being provisional, and will have the right to seek to vary his otherwise agreed periodical payments, if in due course he comes to develop serious consequences as a result of acquired syringomyelia.
- Source 45: Phil Wills v Strategic Procurement (UK) LimitedRead the judgmentOur page on this source
Show the 8 quoted extracts
[3]; PDF pp. 1, 2 (unpaginated)[3] Mr Wills made a claim in Aberdeen sheriff court against the defender for damages for an alleged failure to provide him with share options worth, he says, in excess of £3.5m. Discussions took place between the respective solicitors about ending the Scottish proceedings. Mr Wills decided to pursue the matter in the High Court in London. Pre‑action letters were sent by English agents, and in due course a writ was served. The Scottish claim was resolved by way of a joint minute, signed on behalf of both parties, which stated that decree of absolvitor should be pronounced. Subsequently the sheriff pronounced such an order. The pursuer claims that the defender's agent knew that his solicitor was in error in agreeing to a form of settlement which would prevent the damages claim being prosecuted in London. He knew that the pursuer intended to pursue the matter south of the border. The English action has been met with a plea to the effect of res judicata. A motion to strike out has been made, but stayed meantime pending the outcome of the current proceedings, in which the pursuer asks the court to set aside both the decree of the sheriff and the preceding joint minute.
[4]; PDF p. 2 (unpaginated)[4] Mr Wills offers to prove that, through its agent, the defender "took advantage" of a known mistake on the part of Mr Wills' solicitor when he agreed to a form of settlement which, unlike dismissal, would involve a total abandonment of the claim. (Counsel for Mr Wills made no express concession that this was the effect of the sheriff court decree, but the debate before me proceeded upon that basis.)
[12]; PDF p. 4 (unpaginated)[12] It is well established that bad, yet fully valid bargains can be made and enforced, and this despite the fact that one or both of the parties misunderstood the true state of affairs. The expert who spots a rare first edition for sale in a bookshop at a low price is an often quoted example. In such a case the seller's error has no impact on the validity of the contract. It relates to a collateral matter, namely the value of the item, not to the subject‑matter, meaning or effect of the bargain. If both were ignorant as to the true value of the book, again that shared error has no effect. Professor McBryde has pointed out that often both parties will have, or must be deemed to have, understood the risks inherent in their transaction; see his contribution on the law of error in "A History of Private Law in Scotland", edited by Reid and Zimmerman, at pages 95/6. (He contrasts a case such as the purchase of a cabinet, which, unknown to the seller, contains a valuable jewel in a secret drawer.) In some respects, commerce thrives on uncertainties. It is no part of our law to undermine the validity of commercial agreements because risks taken have turned out badly for one party. It may well be possible to analyse some of the cases in terms of implied conditions, for example, as to acceptance of risk, warranties, etc.
[14]; PDF p. 4 (unpaginated)[14] For present purposes I require to proceed upon the basis that it will be proved that, at the time of the settlement of the Scottish proceedings, Mr Wills' solicitor did not appreciate that a decree of absolvitor would prevent pursuit of the shares claim in England - as opposed to clearing the way for such proceedings - and that it was understood by all involved that an action was to be raised in London. The debate also proceeded upon the assumption that the defender's solicitor laboured under no such error, but was aware of his counterpart's mistake, kept quiet about it, and completed the agreement, thereafter obtaining a court decree consistent with its terms. This is a different type of case from Anderson v Lambie 1954 SC(HL) 43, where both parties were under the same error as to the extent of the heritable subjects being disponed. It is also important to appreciate that there is no suggestion that the error was caused or induced by the defender or its agents: but nor is it a case of pure uninduced unilateral error - it is "error plus", in that the allegation is that the defender's agent knew and took advantage of the other's mistake.
[22]; PDF pp. 6, 7 (unpaginated)[22] For the above reasons, I reject the primary proposition presented by Mr Lake, namely that the ratio of Steuart's Trustees has been overruled. It may be that Gloag's concerns about Steuart's Trustees (pages 437/8) arose from an anxiety that the Inner House judgments might open the way for a known, though uninduced error, on a collateral, but highly influential matter, to disturb the enforceability of a bargain, perhaps by analogy with the law on contracts induced by a misrepresentation of one party. Unfortunately, this area of the law is bedevilled by the frequent use of inexact terminology. Hence, in this opinion I have tried to avoid the phrase "essential error", which can be interpreted in a variety of senses, for example, as a mistaken understanding which causes a party to make a contract, or as one which goes to "the essentials" of the proposed bargain. Nothing in this opinion will prevent discussion at the proof as to whether an uninduced error of the former type, if known to the other side, can prevent enforcement of an agreement, though my provisional conclusion is that the current state of the authorities does not support that proposition (albeit something may depend on the specific context of the transaction).
[23]; PDF p. 7 (unpaginated)[23] Mr Lake's secondary submission was that the pursuer's case is nonetheless irrelevant, in that the solicitor's mistaken belief does not fall into the category of the kind of error which, if known, will allow reduction. Assuming that Steuart's Trustees is good law, it is not every error which, even if appreciated by the other party, will justify a challenge to a contract. In general terms, I regard that proposition as sound. The difficulty is in identifying on which side of the line any particular case falls. The point is discussed in Professor Thompson's article, again at page 219: "The doctrine of uninduced unilateral error - even if known to the other party - does not enable an offeror to escape from a bad bargain." The author discriminates between errors "going to the root of the contract" and errors "in intention or motive", the latter being operative only if material to the bargain and induced by the other party. Much could be said upon this topic, but I am of the view that, in the present case, this issue should be resolved after proof, when the full facts and circumstances have been explored in evidence. Then, to use the language of Stair (I.10, 13), the court will be better placed to judge whether Mr Wills' agent erred "in the substantials of what (was) done." There are plenty of decisions in the books where a judge or a jury has upheld a case based on a mistake as to the meaning or effect of an agreement, but much can depend on the full circumstances.
[24]; PDF p. 7 (unpaginated)[24] In response to Mr Dunlop's submissions, Mr Lake submitted that the only issue properly arising in this case concerns the interpretation of what was agreed. He observed that Mr Dunlop had not suggested that the background circumstances indicate that the agreement on "absolvitor" should be construed as meaning that the English proceedings will be allowed to continue. According to Mr Lake, much would be required to rebut the well understood meaning of the term "absolvitor". At least at this stage, I am not persuaded that the only relevant issue in the case concerns the construction of a valid contract. However, again I consider it unnecessary and inappropriate to dwell on this submission until after proof and the full circumstances have been established.
[25]; PDF p. 7 (unpaginated)[25] Mr Lake made various criticisms as to the detail of the pursuer's pleadings, but none of them has persuaded me that the pursuer should be refused a proof before answer. In response to one of Mr Lake's submissions in this regard, Mr Dunlop invited the court, if not dismissing the claim, to put the case out by order. This would allow him to give consideration to an amendment addressing the possibility that the parties reached a concluded agreement before the completion of the joint minute, in which event an additional conclusion for reduction might be required, though the factual averments would stand unrevised. I shall grant that request and also refuse Mr Lake's motion for dismissal of the action. My intention is that after the by order hearing, I will allow a proof before answer, with all pleas outstanding.
- Source 46: WW v The Advocate General for ScotlandRead the judgmentOur page on this source
Show the 2 quoted extracts
[1]; PDF p. 1 (unpaginated)[1] In this personal injuries action the pursuer seeks provisional damages for pleural plaques. The case came before me for proof on quantum alone, the defender having admitted liability, for the purposes of the action, in his defences. At the outset of the proof senior counsel for the defender confirmed that he accepted that the pursuer was entitled to an award of provisional damages. I heard all the evidence in the case and most of parties’ closing submissions at that diet of proof. It emerged in the course of the defender’s final submissions that there was an appeal pending in the Court of Appeal in Northern Ireland in the case of McCauley v Harland and Wolff. Since that case was agreed to be of importance (for reasons which will become clear later in this judgment), I adjourned the proof to await the outcome of the appeal and to hear further submissions in the light of it; the decision in the appeal was expected to be known within a few weeks. Events then took an unexpected turn. Shortly before the proof was due to resume, the defender enrolled a motion seeking leave to have a minute of amendment received and for his pleadings to be amended in terms thereof. The proposed amendment sought to delete the admission of liability and to add an entirely new defence based on Crown immunity under section 10(2) of the Crown Proceedings Act 1947 (“the 1947 Act”). Having heard submissions on whether the amendment should be allowed to be received, I refused the defender’s motion; I shall explain my reasons for doing so later in this opinion. Parties then completed their closing submissions, in which they each referred to the judgment of the Court of Appeal in McCauley.
[49]; PDF pp. 9, 10 (unpaginated)[49] Counsel for the pursuer submitted that the pursuer should be entitled to apply for a further award of damages in the event that he develops any asbestos related condition in the future. In view of the terms of section 12(1)(a) of the Administration of Justice Act 1982, I do not consider that this would be the appropriate form of order in the circumstances of the present case. That provision makes clear that an award of provisional damages may be made where there is proved or admitted to be a risk that in the future the injured person will develop some serious disease or suffer some serious deterioration in his physical or mental condition. The uncontested medical evidence in the present case showed that the pursuer was at risk of developing mesothelioma, but not any other condition. Mesothelioma being the only proven risk, it seems to me that the pursuer is entitled to seek further damages only in the event that he develops that particular condition. My interlocutor will make that clear.
- Source 47: Roger Harris v The Advocate General as representing the Ministry of DefenceRead the judgmentOur page on this source
Show the 4 quoted extracts
[1]; PDF p. 1 (unpaginated)[1] This is an action of reparation. The pursuer was employed by the Ministry of Defence as a boiler maker from 1961 to 1977. During the period of his employment with the defender he was exposed to asbestos dust and fibres as a result of which he has developed bilateral calcified pleural plaques. The defenders admit liability. The matter came before me for a proof on quantum. However the evidence was agreed and set out in a joint minute. Accordingly I heard no evidence but submissions on the quantum of damages.
[16]; PDF p. 9 (unpaginated)[16] In the Court of Appeal in the Rothwell and related cases Smith LJ examined the methodology for the assessment of general damages in cases where the claimant sought a full and final settlement taking account of future risks. She rejected the approach taken by the judge at first instance and concluded that the appropriate method was what she termed the principled approach. That involved taking the full value figure and applying the appropriate percentage risk and then adding it to the figure that would be awarded for provisional damages.
[22]; PDF p. 10 (unpaginated)[22] I start with the assessment of the appropriate award for provisional damages in this case. In W Lord Pentland conducted a review of the cases in England and Wales and compared these with the recent Northern Irish cases. He assessed the range for provisional damages in cases such as this as being between £5,500 and £9,000. I agree that that appears to be the appropriate range. The pursuer in W was of a similar age to the pursuer in this case with a similar history and with no reduction in life expectancy. However he had an above normal anxiety about the prospect of developing further lung disease. It was not a serious psychiatric illness or psychological disability but Lord Pentland accepted that he had a significant anxiety which would persist for some time into the future. He awarded £8,500. The pursuer’s valuation is £7,500. Mr Primrose suggested that that was on the high side and referred me to the case of Hooper. I did not find the brief digest report to be of much assistance. Comparing this case with the pursuer in W it appears that the only difference is the significant anxiety which the pursuer in W experienced. Accordingly I consider that an appropriate award from provisional damages in this case would have been £7,500 as suggested by Mr Di Rollo with interest at the rate of 4% per annum on half that sum from 8 January 2013 to the date of decree. Onto that sum assessed for provisional damages should be added 5.2% of £66,000 ie £3,432.
[26]; PDF p. 11 (unpaginated)[26] The interest figure on the calculated sum of provisional damages will need to be updated and I will put the case out by order to agree final calculations and to deal with expenses.
- Source 48: Loney (a minor) v McDonald and Motor Insurers BureauRead the judgmentOur page on this source
Show the 5 quoted extracts
[1]; PDF p. 1 (printed p. 1)[1] The plaintiff, Amy-Lee Loney, now 7 years and 11 months, then 4 years and 9 months, sustained injuries in a road traffic collision which occurred at 12.17 pm on Saturday 4 May 2013. The plaintiff was on a public footpath playing with friends in the street at her grandparents’ house, when she was hit by the first defendant’s scrambler motorcycle. The second defendant the MIB has admitted that the first defendant was negligent. The only issue is the assessment of damages.
[8]; PDF pp. 2, 3 (printed pp. 2, 3)[8] The assessment of damages in this case involves consideration of potential future events including whether there is a chance of deterioration in the plaintiff’s right Stenson’s duct or a chance of improvement in the cosmetic appearance of the plaintiff’s scar by plastic surgery or by the application of cosmetics. In Mallett v McMonagle [1970] AC 166 it was stated at page 176 that: “… the court must make an estimate as to what are the chances that a particular thing will … happen … and reflect those chances, whether they are more or less than even, in the amount of damages it awards.” So once it has been established that the chance of deterioration or improvement is not too small to be ignored, damages are to be assessed in proportion to that chance.
[9]; PDF p. 3 (printed p. 3)[9] In relation to a claim that the injury caused by negligence may cause further injury the court may make an award of provisional damages see Section 68 and Schedule 6 of the Administration of Justice Act 1982 together with Order 37, Rules 7-10 of the Rules of the Court of Judicature (Northern Ireland) 1980. If “there is proved … to be a chance that at some definite or indefinite time in the future the injured person will, as a result of the act or omission which gave rise to the cause of action, … suffer some serious deterioration in his physical … condition” then the court may “award the injured person (a) damages assessed on the assumption that the injured person will not … suffer deterioration in his condition; and (b) further damages at a further date if he suffers the deterioration.” There are three questions which required to be addressed before a court makes an award of provisional damages see Wilson v MOD [1991] ICR 595, Davies v Bradshaw [2008] EWHC 740 and Bittles v Harland & Wolff plc and another [2000] NIJB 209 namely:- (a) Whether it is proved that there is a chance. (b) Second whether it is proved that the chance is of some serious deterioration in the plaintiff’s physical condition. (c) If the plaintiff succeeds in satisfying both of these whether the court should exercise its discretion in the plaintiff’s favour in the circumstances of the case by making an award of provisional damages.
[10]; PDF p. 3 (printed p. 3)[10] The plaintiff has not claimed an award of provisional damages. Ordinarily this would prevent the court from making such an award, see Cowan v Kitson Insulations Limited [1992] PIQR Q19. However the plaintiff is a child and I consider that the court could in such circumstances make an award by amending the pleadings and giving the parties an opportunity to make submissions. However, it is not necessary to do so in this case, as I consider that in the exercise of discretion the future uncertainties can all properly be taken into account in making a once and for all assessment of damages.
[30]; PDF p. 9 (printed p. 9)[30] I assess overall damages at the figure of £90,000 and enter judgment for that amount.
- Source 49: David Forsyth v Craig Howson and anotherRead the judgmentOur page on this source
Show the 5 quoted extracts
[1]1. This is an unusual application in which the Defendants seek, against the wishes of the Claimant, the approval of the Court pursuant to its inherent jurisdiction of a settlement reached between the Claimant and the Defendants. The Claimant proceeds and has always proceeded without a litigation friend. Whilst there are a number of reported cases where the parties have jointly requested approval of a settlement where there is a doubt as to the claimant’s capacity to conduct proceedings and both parties seek finality and the security of knowing that should it later transpire that the claimant lacked capacity, the settlement will nonetheless be binding, neither Mr Clarke who appears for the Defendants nor Mr Smith who appears for the Claimant were able to identify any case where the court has been asked to invoke the inherent jurisdiction against the Claimant’s wishes.
[16]16. No settlement of a claim made by a protected party will be valid unless it has the court’s approval (CPR 21.10(1)). If a party believed to have litigation capacity enters into a settlement and is subsequently found not to have had capacity, that settlement will be set aside (Dunhill v Burgin [2014] UKSC 18).
[42]42. First, this is not a case where a trial of litigation capacity might be directed on the contemporaneous, detailed, unanimous medical evidence. In practical terms, given that evidence, the parties have already secured finality by the acceptance of the Part 36 offer. Even if there remains some lingering doubt as to capacity, there is a clear contrast with Dunhill where there had been no investigation of capacity before the settlement. If there is a risk here of the settlement unravelling it can only be very small.
[43]43. Secondly, the Claimant opposes an inherent jurisdiction approval. It is not appropriate in my view to foist upon a claimant (whom all the experts agree has litigation capacity) a process designed to protect him when he does not need or want that protection.
[46]46. All of those factors strongly indicate to me that this is not a case where the inherent jurisdiction should be invoked. The application is dismissed.
- Source 50: Knipe v Bamford and othersRead the judgmentOur page on this source
Show the 4 quoted extracts
[9]; PDF p. 3 (printed p. 3)[9] In light of the effectively unchallenged averments of Counsel for the Defendants and the contemporaneous Court records I am quite satisfied that the Ordinary Civil Bill was settled on an apportionment of liability as set out above.
[12]; PDF p. 3 (printed p. 3)[12] The circumstance that, for whatever reason, Mr Whyte’s insurance company was unaware of and unrepresented during the civil bill proceedings does not affect, in my view, the legally binding nature of the agreement that was entered into. It may potentially give rise to issues between Mr Whyte and his insurance company but it cannot affect the binding nature of the agreement. See, for example, paras 30.03 and 30.11 et seq of “The Law and Practice of Compromise” (6th edition) by David Foskett QC (“Foskett”).
[13]; PDF p. 4 (printed p. 4)[13] It is well established that the solicitor retained in an action has ostensible authority as between himself and the opposing litigant to compromise the suit provided that the compromise did not involve matters collateral to the action; that matter was not collateral to the action unless it involved extraneous subject matter, and that a compromise did not involve collateral matter merely because it contained terms which the court could not have ordered by way of judgment in the action. See Waugh v. H B Clifford and Sons Limited [1982] Ch 374 at 375 and page 386 H to page 387 to C. Of course in the present case the compromise involved terms which the court could (and on consent did) order.
[14]; PDF p. 4 (printed p. 4)[14] An apportionment of liability having been agreed the court will not permit the same to be litigated again. See Foskett at para 6.01 and Plumley v. Horrell [1869] 20 LT 473 and Knowles v. Roberts [1888] 38 Ch D 263.
- Source 51: The Civil Procedure Rules 1998Official textOur page on this source
Show the quoted extract
Civil Procedure Rules 1998, r. 25.20(1) The court must not order an interim payment of more than a reasonable proportion of the likely amount of the final judgment. (2) The court must take into account contributory negligence and any relevant set-off or counterclaim. (3) The court may order an interim payment by instalments. If so, the order must set out— (a) the total amount of the payment; (b) the amount of each instalment; (c) the number of instalments and the date on which each is to be paid; and (d) to whom payment should be made. (4) Where a party seeks an interim payment and the court has ordered an account to be taken, if on the evidence the account is bound to result in a payment to the applicant, the court must, before making an order for interim payment, order that the liable party pay to the applicant the amount shown by the account to be due. (5) The permission of the court must be obtained before making a voluntary interim payment in respect of a claim by a child or protected party. ‘Child’ and ‘protected party’ have the same meanings as in rule 21.1(2). (6) The court may adjust any interim payment whether or not any payment has yet been made (voluntarily or under a previously made order). The court may in particular— (a) order all or part of the interim payment to be repaid; (b) vary or discharge the order for the interim payment; (c) order a defendant to reimburse, either wholly or partly, another defendant who has made an interim payment. (7) The court may make an order under paragraph (6)(c) only if— (a) the defendant to be reimbursed has claimed against the other defendant for a contribution, indemnity or other remedy; and (b) where the claim to which the interim payment relates has not been discontinued or disposed of, the circumstances are such that the court could make an interim payment order under this Section. (8) Where a defendant has made an interim payment, and the amount of the payment is more than their total liability under the final judgment or order, the court may award them interest on the overpaid amount from the date when they made the interim payment. (Practice Direction 40B, paragraphs 6.1 to 6.4 provide further information concerning adjustment of the final judgment sum.)
- Source 52: Act of Sederunt (Sheriff Court Ordinary Cause Rules) 1993 — Schedule 1 (Ordinary Cause Rules 1993) — Chapter 36: ACTIONS OF DAMAGESOfficial textOur page on this source
Show the quoted extract
Ordinary Cause Rules r. 36.936.9. (1) In an action to which this Part applies, a pursuer may, at any time after defences have been lodged, apply by motion for an order for interim payment of damages to him by the defender or, where there are two or more of them, by any one or more of them. (2) The pursuer shall intimate a motion under paragraph (1) to every other party on a period of notice of 14 days. (3) On a motion under paragraph (1), the sheriff may, if satisfied that-- (a) the defender has admitted liability to the pursuer in the action, or (b) if the action proceeded to proof, the pursuer would succeed in the action on the question of liability without any substantial finding of contributory negligence on his part, or on the part of any person in respect of whose injury or death the claim of the pursuer arises, and would obtain decree for damages against any defender, ordain that defender to make an interim payment to the pursuer of such amount as the sheriff thinks fit, not exceeding a reasonable proportion of the damages which, in the opinion of the sheriff, are likely to be recovered by the pursuer. (4) Any such payment may be ordered to be made in one lump sum or otherwise as the sheriff thinks fit. (5) No order shall be made against a defender under this rule unless it appears to the sheriff that the defender is-- (a) a person who is insured in respect of the claim of the pursuer; (b) a public authority; (c) a person whose means and resources are such as to enable him to make the interim payment; or (d) the person's liability will be met by- (i) an insurer under section 151 of the Road Traffic Act 1988; or (ii) an insurer acting under the Motor Insurers Bureau Agreement, or the Motor Insurers Bureau where it is acting itself (6) Notwithstanding the grant or refusal of a motion for an interim payment, a subsequent motion may be made where there has been a change of circumstances. (7) Subject to Part IV (management of damages payable to persons under legal disability), an interim payment shall be made to the pursuer unless the sheriff otherwise directs. (8) This rule shall, with the necessary modifications, apply to a counterclaim for damages for personal injuries made by a defender as it applies to an action in which the pursuer may apply for an order for interim payment of damages.
- Source 53: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the quoted extract
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 29 r. 13(1) If, on the hearing of an application under rule 12 in an action for damages, the Court is satisfied— (a) that the defendant against whom the order is sought (in this paragraph referred to as “the respondent”) has admitted liability for the plaintiff’s damages; or (b) that the plaintiff has obtained judgment against the respondent for damages to be assessed; or (c) that, if the action proceeded to trial, the plaintiff would obtain judgment for substantial damages against the respondent; or (d) that, in an action in which there are two or more defendants and the order is sought against any one or more of them, if the action proceeded to trial, the plaintiff would obtain judgment for substantial damages against at least one of the defendants (but the Court cannot determine which), the Court may if it thinks fit, subject to paragraphs (2) and (3), order the respondent, or any one or more of the respondents as the case may be, to make an interim payment of such amount as it thinks just, not exceeding a reasonable proportion of the damages which in the opinion of the Court are likely to be recovered by the plaintiff after taking into account any relevant contributory negligence and any set-off, cross-claim or counterclaim on which the respondent may be entitled to rely.] (2) [(b) Where an application falls within paragraphs (1)(a)–(c)] no order shall be made under paragraph (1) in an action for personal injuries if it appears to the Court that the defendant is not a person falling within one of the following categories, namely— (a) a person who is insured in respect of the plaintiffs claim; (b) a public authority; or (c) a person whose means and resources are such as to enable him to make the interim payment. (3) Where an application falls within paragraph 1(d), no order shall be made under paragraph (1) unless the Court is satisfied that each of the defendants is a person falling within one of the following categories, namely— (a) a person who is insured in respect of the plaintiff’s claim or whose liability will be met by an insurer under Article 98 of the Road Traffic (Northern Ireland) Order 1981; (b) a person whose liability will be met by the Motor Insurers’ Bureau, a company limited by guarantee and incorporated under the Companies Act 1929, or an insurer acting on its behalf; or (c) a public authority.] [E.r. 11]
- Source 54: The Rules of the Court of Judicature (Northern Ireland) (Revision) 1980Official textOur page on this source
Show the 2 quoted extracts
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 3 r. 2(1) Any period of time fixed by these Rules or by any judgment, order or direction for doing any act shall be reckoned in accordance with the following provisions of this rule. (2) Where the act is required to be done within a specified period after or from a specified date, the period begins immediately after that date. (3) Where the act is required to be done within or not less than a specified period before a specified date, the period ends immediately before that date. (4) Where the act is required to be done a specified number of clear days before or after a specified date, at least that number of days must intervene between the day on which the act is done and that date. (5) Where, apart from this pargraph, the period in question, being a period of 7 days or less, would include a Saturday, Sunday or bank holiday, Christmas Day or Good Friday, that day shall be excluded. (6) In paragraph (5) “bank holiday” means a day which is, or is to be observed as, a bank holiday in Northern Ireland under the Banking and Financial Dealings Act 1971. [E.r. 2]
Rules of the Court of Judicature (Northern Ireland) (Revision) 1980, Order 3 r. 4Where the time prescribed by these Rules, or by any judgment, order or direction, for doing any act at an office of the Supreme Court expires on a day on which that office is closed, and by reason thereof that act cannot be done on that day, the act shall be in time if done on the next day on which that office is open. [E.r. 4]
- Source 55: County Court Rules (Northern Ireland) 1981Official textOur page on this source
Show the quoted extract
County Court Rules (Northern Ireland) 1981, Order 43 r. 17Without prejudice to section 39 of the Interpretation Act (Northern Ireland) 1954— (a) where anything is required by these Orders to be done within a specified period of or after the happening of a particular event, the period shall be computed from the end of the day on which the event happens unless the period is expressed to be inclusive of such day; (b) where anything is required by these Orders to be done within a period not exceeding three days or where a period not exceeding three days is required by these Orders to elapse between the doing of an act and the happening of a particular event, no Saturday or Sunday nor any day on which the Office is closed shall be included in the computation of that period; (c) where the time prescribed for doing any act expired on a Saturday or a Sunday or any day on which the Office is closed, the act shall be in time if done on the next day on which the Office is open.
- Source 56: Interpretation Act (Northern Ireland) 1954Official textOur page on this source
Show the 2 quoted extracts
s. 39(2)–(6)(2)Where in an enactment a period of time is expressed to begin on, or to be reckoned from, a particular day, that day shall not be included in the period. (3)Where in an enactment a period of time is expressed to end on, or to be reckoned to, a particular day, that day shall be included in the period. (4)Where the time limited by an enactment for the doing of anything expires or falls upon a Sunday or a public holiday, the time so limited shall extend to and the thing may be done on the first following day that is not a Sunday or a public holiday. (5)Sub-sections (2), (3) and (4) shall apply whether or not the number of days concerned is expressed to be clear days. (6)In an enactment— (a)a reference to midnight, in relation to any particular day, shall be construed as a reference to the point of time at which that day ends; (b)a reference to a week-day shall be construed as a reference to a day which is not a Sunday; (c)a reference to a month shall be construed as a reference to a calendar month; (d)a reference, without qualification, to a year shall be construed as a reference to a period of twelve months; and (e)a reference to a financial year or to a local financial year shall be construed as a reference to a period of twelve months ending at midnight on the thirty-first day of March.
s. 39(8)(8)In an enactment the expression “public holiday” shall include Christmas Day, Good Friday, any bank holiday appointed by or under any statutory provision and any day appointed for public thanksgiving or mourning.
- Source 57: Act of Sederunt (Sheriff Court Ordinary Cause Rules) 1993 — Schedule 1 (Ordinary Cause Rules 1993) — Chapter 36: ACTIONS OF DAMAGESOfficial textOur page on this source
Show the 2 quoted extracts
Ordinary Cause Rules r. 36.E1(3)(3) Paragraphs (4) to (17) apply to a personal injuries action proceeding in accordance with personal injuries procedure but cease to apply when an action is appointed to the procedure in Chapter 36A.
Ordinary Cause Rules r. 36.E1(15)–(16)(15) References elsewhere in these Rules to the condescendence of an initial writ or to the articles of the condescendence are to be construed as references to the statement required under rule 36.B1(1) and the numbered paragraphs of that statement. (16) References elsewhere in these Rules to pleas-in-law, an open record, a closed record or a record for an Options Hearing are to be ignored.
Spotted a mistake? Report a mistake in this guide.