Guide · Roads, animals, hazards and property
Who is responsible for a crash caused by roadworks or utility works?
Responsibility may lie with the utility or other organisation legally carrying out the works, a contractor responsible for the unsafe work or traffic arrangements, the apparatus holder, or the road authority, depending on each party’s duties and what caused your loss. [4] [5] [6] [67] Identify those roles and preserve evidence of the site at the time of the collision; a company name, permit or referral of your claim is a starting point, not a finding of liability. [22] [23] [24] [43] [67] England and Wales, Scotland and Northern Ireland have different legal frameworks and authority routes, and a statutory works offence does not automatically give every injured road user a right to damages. [13] [14] [15] [39] [41] [40] [42]
- Updated
- Sources checked
- November 2026
- Reading time
- 26 minutes
- Where it applies
- England and Wales, Scotland, Northern Ireland
- Category
- Roads, animals, hazards and property
Contents 20 sections
- Who this guide is for
- Make the site safe to leave and report the danger
- Identify each organisation’s actual role
- Separate an unsafe site from a proved civil claim
- England and Wales: distinguish works duties from highway maintenance
- Scotland: use the Scottish works rules and civil-law basis
- Northern Ireland: check the Department’s specific defence and the works actors
- Match the safety standard to the road, country and work date
- Consider your conduct and whether more than one party contributed
- Preserve evidence of the condition before and at the collision
- Find the authority for the exact road
- Trace the works through the board and register
- Request the records that explain responsibility and safety
- Ask for a reasoned answer if your claim is passed between bodies
- Protect the claim’s time limit while you investigate
- Your checklist
- Common questions
- Court decisions in this guide
- Organisations
- Sources
Who this guide is for
Who it is for
Not covered here
The detailed procedure for a general pothole claim is covered in the linked country guides; private-road ownership, workplace claims and construction-contract disputes may require additional analysis. [67]
Make the site safe to leave and report the danger
Applies to: UK-wideIf the collision is happening now, put safety before collecting evidence. Get uninjured people away from traffic if it is safe to do so, call the emergency services when needed, and give a precise location and details of casualties. Follow the emergency guidance applicable where you are; do not enter a closed lane, excavation or traffic stream to obtain a photograph. The immediate steps after a collision explain the wider priorities. [25] [26]
Report an ongoing hazard to the responsible road body using its official reporting route and keep the reference. For a works site, also record the emergency number on its information board if you can read it safely. Reporting a hazard and making a compensation claim are separate tasks: ask whether your report has also opened a claim and what information the claims handler needs. Northern Ireland’s official guidance expressly asks you to report the problem and retain its reference. [48] [42] [67]
When immediate safety has been addressed, write down the road, direction, lane or path, nearest junction or property, date and time, and the works or asset reference. Keep original photographs and video, witness details and the first account you gave. The guide to preserving collision evidence covers general evidence handling; the checks below concentrate on evidence that identifies the works and the responsible organisations. [67] [42]
Identify each organisation’s actual role
Applies to: UK-wideStart with a list of possible duty holders, then ask what each actually did. The organisation promoting a scheme, the holder of the legal right to open the road, the main contractor, a subcontractor and the team managing signs may be different. In street-works law, an undertaker is generally the person holding the relevant statutory right, licence or permission; it does not simply mean the individual operating a digger. The definitions and permission arrangements differ between the three systems. [1] [2] [3]
Reinstatement means putting the street or road back after the works; the legislation and specifications set the applicable requirements. [7] [8] [9]
| Possible party | What to establish | Useful identifying evidence |
|---|---|---|
| Utility or other works undertaker | Who held the right or permission for these works, and which safety or reinstatement duties applied? | Works notice, permit or licence, promoter reference and the authority’s register entry. [1] [2] [3] [22] [23] [24] |
| Main contractor, subcontractor or traffic-management contractor | Who excavated, installed the cover or plates, reinstated the surface, positioned the plant, designed the layout, and checked or operated the signs and signals? | Site board, work order, contractor chain, traffic-management plan and dated inspection or shift records. Request the records for the precise activity and time. [67] |
| Apparatus holder | Who was responsible for the cover, chamber, grate or other apparatus, including maintenance after the works? | Asset plans, apparatus references, ownership confirmation and maintenance records. A visible name is a lead to verify. [10] [11] [12] [67] |
| Highway or roads authority, or its operating company | Was this its own work, work on its behalf, or a separate utility project; and what road or maintenance function did it have? | Road-status confirmation, scheme and operating-contract details, works permissions and inspection records. The claims administrator may be different from the party legally responsible. [19] [20] [21] [39] [40] [41] [67] |
This enquiry can matter whether you were driving, cycling, walking or riding a horse, or your vehicle or other property was damaged. The safety provisions concern people using the road, with express attention to disabled people; they are not confined to motor vehicles. Identify the affected route, including a temporary pedestrian or cycle route, and the person whose injury or property loss is being claimed. [4] [5] [6] [42]
Separate an unsafe site from a proved civil claim
Applies to: UK-wideFor each proposed claim, identify the legal duty, the failure said to breach it, and the link between that failure and your injury or loss. A safety rule can help identify what should have happened, but its enforcement mechanism and any private right to compensation are separate questions. The statutory compensation provisions for works damage identify particular authorities and apparatus holders; they are not a general compensation promise to everyone passing the site. [13] [14] [15]
Work through the causal sequence. Was there an uncovered opening, an unstable cover, a poorly reinstated surface, inadequate advance warning, a misleading temporary layout or plant in a dangerous position? What happened when you encountered it, and which loss followed? Record the point where you braked, swerved, fell or struck something; do not assume that every visible defect caused the collision. This is a practical way to organise the evidence, not a substitute for establishing the applicable legal claim. [67]
In England and Wales, Mega Trucking v Highways England concerned a claim for a share of compensation pleaded under the highway maintenance duty. It failed: the alleged road-level difference did not cause that accident. The court did not decide a separate civil claim about signage, the maintenance defence or the division of responsibility. [60]
The difference between a temporary arrangement and a permanent repair matters, but neither label answers whether it was safe or legally compliant. Obtain the status of the work at the collision date, the applicable performance requirements and any subsequent remedial history. An inspection, completion notice or later repair must be assessed with the rest of the evidence. [7] [8] [9] [67]
England and Wales: distinguish works duties from highway maintenance
Applies to: England and WalesFor utility street works, section 65 of the New Roads and Street Works Act 1991 requires the undertaker to guard and light openings or obstructions and provide the traffic signs reasonably required for people using the street. It gives compliance with the relevant code a specified evidential effect and provides for enforcement. Sections 70 and 71 address reinstatement and its materials, workmanship and performance; section 81 addresses apparatus maintenance. A dangerous cover may therefore require enquiries about the apparatus holder as well as the contractor who last worked around it. [4] [7] [10]
Other works in streets, including an authority’s own roadworks, may engage section 174 of the Highways Act 1980. Its precautions include signing, guarding and lighting; it excludes street works governed by Part III of the 1991 Act. Establish which category of work was being done before choosing the provision. [16] [1]
Project-specific development consent orders can confer street-works rights and modify permit rules. For works under such an order, identify its applicable provisions as well. Recent examples in England are the Green Hill and Steeple orders, whose street-works provisions apply to their authorised developments. [69] [70]
For a highway maintainable at public expense, section 41 imposes a maintenance duty and section 58 supplies a reasonable-care defence to a claim for failure to maintain. Employing a competent contractor is insufficient for that defence unless the authority also proves proper maintenance instructions and that they were carried out. That is a specific maintenance rule, not a rule that every contractor’s error is automatically the authority’s civil liability. The guide to challenging a rejected defect claim in England or Wales addresses that maintenance route in detail. [19]
Negligence concerns a failure to take reasonable care where that care is legally owed. Where the allegation is that an organisation created a danger through its operations, distinguish it from an allegation that a public body failed to prevent someone else’s danger. In Tindall, the Supreme Court explained that distinction and its exceptions, including some cases of assumed responsibility, control or interference with another person’s protective action. Statutory powers alone do not establish a private duty to protect everyone. Tindall was a claim against the police, not a decision absolving a road authority or works contractor. [44]
Section 82 of the 1991 Act compensates specified authorities and apparatus holders, while preserving other liabilities. Its reference to contractors operates within that section. It should not be turned into a universal rule making a utility or authority liable to every injured road user for every subcontractor. [13]
Two further decisions illustrate the distinctions. In Foggoa, a trench-related injury claim failed: departure from the safety code did not itself establish negligence, and the court did not allocate fault between the contractors. In BT v Crown Court at Carlisle, the court dealt with the undertaker’s strict criminal offence and sentence, not a road user’s damages claim. [58] [61]
Scotland: use the Scottish works rules and civil-law basis
Applies to: ScotlandPart IV of the New Roads and Street Works Act 1991 governs utility road works in Scotland. Section 124 addresses guarding, lighting and signs; sections 129 and 130 address reinstatement and performance; section 140 addresses apparatus maintenance. The relevant duties attach to the statutory undertaker and other identified actors under the applicable provisions. Do not substitute the corresponding English section numbers or assume that an English permit system applies. [2] [5] [8] [11]
The Roads (Scotland) Act 1984 separately governs roads authorities and public roads. Its current section 60 includes subsection (3A), covering a roads authority carrying out its own works, and section 60A deals with the safety code’s effect. These provisions took effect in 2022; use the amended law when assessing current authorities’ own works. Section 60 excludes road works governed by Part IV of the 1991 Act. [20] [17]
A statutory duty and a civil damages remedy remain distinct. Section 141 of the 1991 Act identifies particular recipients of compensation and preserves other liabilities. In Morrison Sports, the Supreme Court rejected a private remedy under the electricity regulations at issue while leaving the common-law negligence case to proceed. Campbell v Gordon likewise makes the particular statutory scheme central; neither decision determines a roadworks claim. [14] [59] [64]
For a direct works example, Mackenzie v Perth & Kinross Council found that missing advance warning caused the motorcycle accident and that the position of a road roller caused serious injury. Other alleged defects were not established as causes. The decision was a Scottish first-instance negligence case on its particular evidence. [62]
Identify the roads authority and any operating company for the exact road and date. A Scottish claim uses the terms pursuer for the person bringing it and defender for the person defending it. The Scottish road-defect guide covers the broader authority, property-damage and personal-injury routes. [20] [40] [62]
Northern Ireland: check the Department’s specific defence and the works actors
Applies to: Northern IrelandThe Street Works (Northern Ireland) Order 1995 is the starting point for utility street works. Article 25 addresses safety precautions; articles 30 and 31 address reinstatement and performance; article 41 addresses apparatus maintenance. Identify the undertaker under the NI definitions and the contractor responsible for the particular operation. For other works on or near a road, article 31 of the Road Traffic Regulation (Northern Ireland) Order 1997 assigns signing responsibilities to the person undertaking or contracting for the work and the person in charge. That article expressly excludes street works governed by the 1995 Order. [3] [6] [9] [12] [18]
Article 8 of the Roads (Northern Ireland) Order 1993 imposes the Department’s maintenance duty and supplies specific defences. Besides reasonable care, article 8(2)(b) concerns damage resulting from works other than works by or on behalf of the Department, where the event occurred before the required reinstatement or making of that part of the road was complete. Both conditions matter. It is not enough simply to say that a utility had once worked there, or that the surface was described as temporary. [21]
Article 8 also addresses what the court considers when assessing the defence. Proof that a competent contractor was appointed is not enough without proper maintenance instructions and proof that they were carried out. Ask for the factual and legal basis of a refusal and the records said to establish the work’s status at the relevant date. The Northern Ireland road-defect guide explains the wider DfI claims route. [21] [67]
Article 42 of the 1995 Order compensates specified authorities and apparatus holders and preserves other liabilities; it is not a general road-user damages scheme. In Boyd, the NI High Court allowed third-party proceedings over alleged utility damage to road drainage, leaving liability for trial and requiring deletion of the statutory-duty allegation in that pleading. It did not decide that the utilities or contractor were negligent. [15] [63]
DfI’s published procedure says a claim may be passed to a contractor or utility for investigation. Northern Ireland Water has its own claims procedure. Such a referral identifies a route to investigate; it does not itself establish that the recipient is liable or that every possible claim against DfI has failed. [43] [21] [67]
Match the safety standard to the road, country and work date
Applies to: UK-wideThe 2013 Safety at Street Works and Road Works code covers signing, lighting and guarding within its stated scope. It excludes motorways and dual carriageways with speed limits of 50 mph or more. Those exclusions are not permission to leave such roads unsafe: identify the applicable legal requirements, traffic-management arrangements and Chapter 8 guidance. A standard drawing must be considered with the actual road, traffic and site conditions. [48] [49] [4] [5] [6]
A new edition of Traffic Signs Manual Chapter 8 was published on 4 November 2026. It explains that its statutory and contractual effect varies across the UK and that it cannot override mandatory law. For an earlier collision, obtain the edition, specification and approved plan applicable when the work was designed, installed and operated; do not apply the new publication retrospectively merely because it is now available. Wales also has supplementary guidance on provision for pedestrians and cyclists on local and trunk roads. [65] [49] [54]
For an uneven or failed repair, identify the country’s reinstatement specification and its applicable version:
| Country | Official specification identified | Important version boundary |
|---|---|---|
| England | Specification for the Reinstatement of Openings in Highways, fourth edition | Statutory guidance from 10 May 2021; check the subsequent official updates and the date of the work. [50] |
| Wales | Specification for the Reinstatement of Openings in Highways, second edition 2006 | The Welsh approval took effect on 24 January 2007; the English fourth edition is a separate publication. [51] |
| Scotland | Specification for the Reinstatement of Openings in Roads, fifth edition | Operative from 1 October 2023, with provisions distinguishing earlier work; Notes for Guidance are outside the statutory code. [52] |
| Northern Ireland | Specification for the Reinstatement of Openings in Roads, second edition | Operative from 1 October 2006 under the separate NI framework. [53] |
Ask which requirements, permitted alternatives and remedial obligations applied to this opening or repair. The undertaker’s reinstatement guarantee is a works obligation; it is not the time limit for your compensation claim. A guarantee’s existence or expiry does not, by itself, decide civil liability. [50] [51] [52] [53] [45] [46] [47]
Consider your conduct and whether more than one party contributed
Applies to: UK-wideAt roadworks, the Great Britain and Northern Ireland Highway Codes require compliance with temporary speed limits and advise care with signs, following distances and cyclists. The Code can be used as evidence in civil proceedings under the relevant legislation; a departure does not by itself decide the whole liability question. Record what signs were actually visible and the speed, visibility and traffic conditions, including the position of other vehicles. [27] [28] [29] [30] [67]
Contributory negligence means that your own fault contributed to the damage. The legislation in Great Britain and Northern Ireland allows damages to be reduced to a just and equitable extent reflecting your responsibility; it does not automatically defeat the claim. There is no fixed roadworks percentage. For the general approach, see being partly to blame. [31] [32]
More than one organisation may bear responsibility, but that must be established for each. Rules about contribution, or sharing the compensation between people liable for the same damage, differ between Scotland and England, Wales and Northern Ireland. An indemnity, an obligation to reimburse another party, concerns those parties’ allocation of liability and does not by itself prove your own claim against either company. Ask for advice before assuming that every named organisation should be sued, or that one referral eliminates the others. [33] [34] [60] [67]
Preserve evidence of the condition before and at the collision
Applies to: UK-wideRecord the scene only from a safe place. Useful images show the approach in your direction of travel, the position of signs and barriers, the opening or cover, the repair boundary, lighting, visibility, traffic lanes and the position of plant. Wide views and close views answer different questions. Do not lift a cover, move signs, enter works or stand in traffic to obtain measurements. Where measurements or technical inspection are needed, ask how they can be obtained safely by an appropriate person. [25] [26] [67]
Create a short chronology distinguishing what you saw before the collision, immediately afterwards and on a later visit. Preserve original files and their dates, and label later photographs accurately. A broken edge, displaced cover or rut photographed afterwards may need investigation to establish whether it preceded the impact. Ask witnesses what they personally saw, rather than suggesting an explanation. [67]
The most useful works-specific questions include:
- Was the cover missing, loose, raised, sunken or temporarily replaced, and who controlled it at that time? [10] [11] [12]
- Was an excavation or temporary surface guarded, lit and signed on the approach actually used? Were the arrangements suitable for a pedestrian, cyclist, rider or disabled road user using that route? [4] [5] [6]
- Had signs, barriers, signals or the traffic-management layout changed between shifts or phases? Request the revision and inspection records covering that period, rather than only the original design. [67]
- Was the repair interim, permanent, awaiting remedial work, or disturbed by later works? Obtain actual completion, notification, inspection and handover dates. [7] [8] [9] [67]
- Were there earlier reports, recorded defects or adverse conditions? Request the records that could establish knowledge and the response, without assuming that no recorded complaint means the site was safe. [19] [21] [67]
Keep repair estimates and invoices, relevant inspection reports, receipts, and evidence of who owned or paid for the damaged property. Ask about inspection of damaged parts before disposal, while avoiding unsafe storage or delay to necessary repairs. Record any urgent repair and why it was needed. Official claims procedures require evidence of the incident and loss; submitting an estimate does not establish that every claimed item is recoverable. The general road-defect evidence guide covers ownership, damaged parts and the wider choice of claim route. [39] [42] [67]
Find the authority for the exact road
Applies to: UK-wideUse the road’s status and the collision location, not just the nearest council name. Ask the recipient to confirm whether it maintains that section and whether the works were its own, undertaken on its behalf, or promoted by a separate utility. A trunk-road operating company or claims agent may handle enquiries without being the only possible legal defendant. [19] [20] [21] [39] [40] [41] [67]
| Place | Route for a trunk road or motorway | What to verify for other roads |
|---|---|---|
| England | Use National Highways’ claims route for its network. | Ask the local authority to identify the highway authority for the exact section and its public-maintenance status; do not assume all roads belong to National Highways. [39] [19] |
| Wales | Traffic Wales’ claims page explains claims involving the Welsh Ministers’ trunk-road and motorway network and the regional agents. | Ask the local authority to confirm the responsible highway authority and the relevant works register. An agent administering a claim is not automatically the party whose liability is alleged. [41] [22] [67] |
| Scotland | Use Transport Scotland’s trunk-road information to identify the operating company or contractor under a design, build, finance and operate arrangement. | Ask the council about the public-road list and the responsible roads authority. Confirm the operator for the accident date, not only the current arrangement. [40] [20] [67] |
| Northern Ireland | Start with DfI’s road or street compensation procedure. | Ask DfI to identify the relevant road, works undertaker and apparatus holder; follow any explained contractor or utility referral. [42] [43] [21] |
If the location is private, unadopted or an estate road, say so at the outset and obtain confirmation of ownership and management. Public-expense maintenance duties are not automatically available merely because the public can drive there. Some works legislation can still extend beyond publicly maintained roads, so road status and works status need separate checks. [1] [19] [20] [3] [67]
Trace the works through the board and register
Applies to: UK-wideIf safe, record the site information board, works reference and any clearly visible organisation or asset identifiers. The safety code normally requires an information board naming the organisation undertaking the works, any principal contractor and an emergency contact number. It contains exceptions for mobile works, short-duration works and minor works without excavation. Absence of a board is therefore not enough on its own to establish a breach. [48]
Then search or request the entry for the exact location and actual work dates, including the date and time of the collision:
- England and Wales: section 53 requires a street-works register, with non-restricted information available for inspection free of charge. Ask the street authority for the relevant historic entry and associated works references. England’s Street Manager service records works information, but operational accounts are for the works sector; use the authority’s public information or ask it for the entry. Do not assume Street Manager is the Welsh or UK-wide system. [22] [55]
- England: the co-ordination code describes public data about the work, location, type, promoter and planned duration, with actual start and stop data. A public entry is useful for identification, but it is not the complete safety or claims file and does not prove who performed each operation. [56] [67]
- Scotland: the Scottish Road Works Register explanation links to the public Roadworks Scotland service. Section 112A covers public timing, location, duration and purpose information and other access arrangements. Ask for the historic works reference and responsible undertaker where the public view is insufficient. [23] [57]
- Northern Ireland: article 13 provides for the street-works register and inspection of information that is not restricted. Ask DfI for the entry and relevant notices rather than assuming that an English service contains the work. [24]
Cross-check the entry against the scene: several schemes may be close together, dates may describe planned rather than actual work, and reinstatement or a later repair may have a different reference. Ask the named promoter to identify the actual contractor and subcontractors for excavation, reinstatement and traffic management. Neither the register nor the board alone proves breach or causation. [22] [23] [24] [67]
Request the records that explain responsibility and safety
Applies to: UK-wideGive the location, collision date and time, direction of travel, works reference and hazard description. Ask each organisation to preserve and identify the records it holds for the relevant period. Tailor the request to the alleged failure; the following are useful categories to consider, not a promise that every record exists or is held by every recipient. [67]
| Records to request | What they can help establish |
|---|---|
| Works notices, permits or licences, conditions and actual start/stop records | The undertaker, precise site, work type, restrictions and chronology. [22] [23] [24] [67] |
| Work orders, organisation names, relevant contractual responsibilities and subcontractor details | Who carried out and controlled the particular task; who supervised or checked it; who handled traffic management. [67] |
| Traffic-management plan and revisions, site-specific risk assessment and sign, barrier or signal records | The intended arrangements and the evidence of what was actually installed, operated and checked at the material time. [4] [5] [6] [67] |
| Inspections, defect reports, complaints, site diaries, photographs and remedial instructions | The condition before the collision, notice of a problem and the response. [19] [21] [67] |
| Reinstatement specification, interim/permanent status, completion notices, inspection/testing results and handover records | The work’s standard and stage, responsibility for defects, and the sequence of later repairs. [7] [8] [9] [67] |
| Apparatus plans and ownership or maintenance confirmation | The party responsible for the cover or chamber, as distinct from adjacent surfacing or a separate scheme. [10] [11] [12] [67] |
Start with an ordinary factual request to the claims handler, works promoter and relevant authority. Public-authority information requests are another route: the Freedom of Information Act 2000 applies to the relevant authorities in England, Wales and Northern Ireland; Scottish public authorities have the Freedom of Information (Scotland) Act 2002. Where records are environmental information, the applicable Environmental Information Regulations may govern access; Scottish public authorities have their separate 2004 Regulations. The definition depends on the information and body concerned, not simply whether a request is labelled “FOI”. [35] [36] [37] [38]
These rights concern information held by the relevant body, including some information held on its behalf, and are subject to statutory qualifications and exceptions. They do not give an automatic right to every private contractor’s entire file or require an authority to create evidence it does not hold. Ask what is held, what is withheld, the basis for withholding and who may hold missing records. If proceedings are contemplated, ask a solicitor about the appropriate evidence and disclosure route as well as these public-information options. [35] [36] [37] [38] [67]
Ask for a reasoned answer if your claim is passed between bodies
Applies to: UK-wideAsk the referring body to give you the recipient’s full legal name, the works or asset reference, its explanation of that party’s role, and confirmation of what information has been forwarded. Request the reason for any denial of its own responsibility and the provision or factual evidence relied on. Keep the original claim, referral, acknowledgements and all dates. These requests help clarify a disputed responsibility chain; they do not make the recipient liable merely because another body named it. [39] [43] [67]
In England, National Highways’ guidance says it is not responsible for problems caused by independent contractors or statutory undertakers. Read that administrative statement alongside the actual allegation and the section 58 conditions where the claim concerns maintenance. In Northern Ireland, examine whether DfI is relying on reasonable care, the specific other-works defence, or some other reason. In Scotland and Wales, establish whether an operating company or agent is administering a claim on another body’s behalf. [39] [19] [21] [40] [41]
If the evidence points to more than one possible party, explain the relevant facts to each and obtain advice on the proper defendants and protective steps. Preserve uncertainty honestly: a permit holder may identify the scheme, while site records establish who carried out the allegedly negligent act. A dispute over an indemnity between organisations does not itself answer your right to compensation. [67] [33] [34]
Protect the claim’s time limit while you investigate
Applies to: UK-wideRecord the accident date, when injury or loss became apparent, when you learned the relevant identity or facts, and the dates of any claim correspondence and proceedings. Also record when the works began, changed phase, were reinstated and were handed over, because those dates can identify the responsible party and applicable standard. Do not delay obtaining advice while an authority and a contractor exchange responsibility. [45] [46] [47] [67]
Personal-injury and property-damage claims can have different time rules, and Scottish prescription can extinguish an obligation. Exceptions, knowledge rules, the proposed parties and the step needed to protect a claim require individual checking. An ordinary report, complaint, referral or ongoing discussion should not be assumed to preserve time. The guide to time limits for starting a claim explains the separate systems and why early action matters. [45] [46] [47] [68]
Prepare a concise chronology, the works references, your safe evidence, the organisations and their stated roles, and the written reasons for any refusal. Ask a suitably qualified adviser to assess the legal basis, causal evidence, correct parties and any urgent procedural step before the deadline. This guide identifies the investigation; it cannot allocate responsibility for an unidentified site without that evidence. [67] [68]
Your checklist
- Applies to: UK-wide
Record the exact road, direction, lane or path, date, time and works or asset reference. [67]
- Applies to: UK-wide
Preserve approach photographs, original video, witness accounts and the condition at different times without moving covers, signs or barriers. [67]
- Applies to: England and Wales
Examine the section 58 defence and its contractor-instructions condition if an English or Welsh authority rejects a maintenance claim. [19]
- Applies to: Northern Ireland
Check both limbs of DfI’s other-works defence, including whether the works were by or on its behalf and whether required reinstatement was complete. [21]
Common questions
Who may be responsible if roadworks, temporary signs, an exposed utility cover or an uneven repair caused my collision?Applies to: UK-wide
Investigate the utility or other legally authorised works undertaker, the contractor responsible for the relevant operation or traffic management, the apparatus holder, and the responsible road authority. Establish each role from the works and asset records; do not assume the body named on a board is the only possible party, or that the authority is responsible for every independent contractor. [1] [2] [3] [10] [11] [12] [67]
England and Wales use Part III of the New Roads and Street Works Act 1991, Scotland uses Part IV, and Northern Ireland uses the Street Works (Northern Ireland) Order 1995. These impose safety and reinstatement obligations, but the statutory compensation provisions have particular beneficiaries rather than covering every road user. Identify the civil cause of action and how the alleged failure caused your loss. [4] [5] [6] [7] [8] [9] [13] [14] [15]
For an authority maintenance claim, examine the applicable defence: England and Wales have section 58; Northern Ireland has article 8, including its distinct defence for others’ works before the required reinstatement was complete. In Scotland, distinguish the authority’s own works duties from the undertaker’s duties; negligence requires a failure causally linked to the loss. Your own fault may reduce damages under the relevant contributory-negligence legislation. Preserve evidence and seek advice if responsibility or the time limit is disputed. [19] [21] [20] [17] [62] [31] [32] [68]
How can I identify the contractor, utility company and highway authority involved?Applies to: UK-wide
Record the exact location, collision date and time, direction of travel, works reference and any site board or apparatus identifiers that you can see safely. The safety code normally requires a board naming the works organisation and any principal contractor, subject to specified exceptions. Treat those names as leads to verify. [25] [26] [48] [67]
Ask the responsible authority for the relevant works register entry and actual dates. England and Wales have section 53 registers; England also uses Street Manager. Scotland has the Scottish Road Works Register and its public Roadworks Scotland service; in Northern Ireland ask DfI for the article 13 entry. Confirm the network owner or operator through National Highways, Traffic Wales, Transport Scotland or DfI as appropriate, and ask the local authority about other public roads. [22] [55] [23] [57] [24] [39] [41] [40] [42]
Ask the named promoter to identify the full contractor chain for excavation, reinstatement and traffic management, and ask who owned or maintained the cover or other apparatus. Request the relevant permits or permissions, plans, inspection records, completion and handover records. Public-information rights concern records held by the relevant authority and have qualifications; they do not automatically open a private contractor’s entire file. If a claim is referred, obtain the recipient’s legal name and the reason in writing, while protecting the court time limit. [10] [11] [12] [67] [35] [36] [37] [38] [43] [68]
Key points
Show the 17 key points of this guide
- Applies to: UK-wide
Identify the undertaker, actual works and traffic-management contractors, apparatus holder and authority separately; their names alone do not establish liability. [1] [2] [3] [67]
- Applies to: England and Wales
England and Wales utility safety duties are in section 65; reinstatement and apparatus duties are separately addressed by sections 70–71 and 81. [4] [7] [10]
- Applies to: Scotland
Scottish utility works use sections 124, 129–130 and 140, while sections 60 and 60A of the Roads (Scotland) Act separately address other works, including current authority own-works duties. [5] [8] [11] [17]
- Applies to: Northern Ireland
NI utility safety, reinstatement and apparatus obligations are governed by articles 25, 30–31 and 41 of the 1995 Order. [6] [9] [12]
- Applies to: UK-wide
The works compensation provisions identify authorities and apparatus holders; they do not create a general compensation scheme for every road user. [13] [14] [15]
- Applies to: England and Wales
The English and Welsh maintenance defence does not treat appointing a competent contractor as sufficient without proper instructions and compliance with them. [19]
- Applies to: Northern Ireland
DfI’s other-works defence requires the statutory conditions concerning who carried out the works and the stage of required reinstatement. [21]
- Applies to: England and Wales
Public-authority powers do not alone create a private negligence duty; creating a danger and failing to protect from an independent danger require different analysis in English law. [44]
- Applies to: UK-wide
Code compliance, the civil standard of care and proof that a particular failure caused loss require separate consideration. [4] [5] [6] [67]
- Applies to: UK-wide
The four countries have distinct reinstatement specifications; an applicable works guarantee is not the claimant’s litigation time limit. [50] [51] [52] [53] [45] [46] [47]
- Applies to: UK-wide
The 2026 Chapter 8 was published on 4 November 2026; it must not be assumed to govern earlier events merely because it is the current edition. [65] [49]
- Applies to: UK-wide
Works registers identify the scheme and relevant dates but do not, by themselves, determine breach or causation. [22] [23] [24] [67]
- Applies to: UK-wide
Street Manager is an England service; Scotland’s statutory register and NI’s article 13 register are separate routes. [55] [23] [24]
- Applies to: UK-wide
FOI and environmental-information rights concern information held by bodies within the applicable regime, subject to its qualifications. [35] [36] [37] [38]
- Applies to: UK-wide
A contractor or utility referral is an investigative and administrative step, not a liability determination. [43] [39] [67]
- Applies to: UK-wide
Contributory negligence may reduce damages under the applicable GB or NI legislation; no fixed roadworks deduction follows. [31] [32]
- Applies to: UK-wide
The statutory time rules differ by system and claim type; protect the claim while responsibility is investigated. [45] [46] [47] [68]
Prepare the works and responsibility evidence checklist
Court decisions in this guide
Organisations
This guide describes the rules as they stood when it was last updated, on 13 November 2026. If your accident happened before then, some of the rules may have been different.
Sources
- Source 1: New Roads and Street Works Act 1991Official textOur page on this source
Show the 3 quoted extracts
New Roads and Street Works Act 1991, s. 48, contiguous excerpt 1(1) In this Part a “street” means the whole or any part of any of the following, irrespective of whether it is a thoroughfare— (a) any highway, road, lane, footway, alley or passage, (b) any square or court, and (c) any land laid out as a way whether it is for the time being formed as a way or not. Where a street passes over a bridge or through a tunnel, references in this Part to the street include that bridge or tunnel. (2) The provisions of this Part apply to a street which is not a maintainable highway subject to such exceptions and adaptations as may be prescribed. (3) In this Part “street works” means works of any of the following kinds (other than works for road purposes) executed in a street in pursuance of a statutory right or a street works licence— (a) placing apparatus, or (b) inspecting, maintaining, adjusting, repairing, altering or renewing apparatus, changing the position of apparatus or removing it, or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street). (3ZA) In this Part “street works” also includes works of any of the following kinds executed in a street in England in pursuance of a street works permit— (a) placing apparatus that is a public charge point, or (b) inspecting, maintaining, adjusting, repairing, altering, renewing, changing the position of or removing apparatus that is a public charge point, or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street). (3A) For the purposes of subsection (3) or (3ZA), the works that are street works by virtue of being works required for or incidental to street works of any particular kind include— (a) reinstatement of the street, and (b) where an undertaker has failed to comply with his duties under this Part with respect to reinstatement of the street, any remedial works. (4) In this Part “undertaker” — (a) in relation to street works mentioned in subsection (3), means the person by whom the relevant statutory right is exercisable (in the capacity in which it is exercisable by him) or the licensee under the relevant
New Roads and Street Works Act 1991, s. 48, contiguous excerpt 2street works licence, as the case may be; (b) in relation to street works described in subsection (3ZA), means the person who in accordance with the street works permit is permitted to carry out the works. (5) References in this Part to the undertaker in relation to apparatus in a street (including public charge points) are to the person entitled, by virtue of— (a) a statutory right, (b) a street works licence, or (c) where the apparatus is a public charge point installed in England in pursuance of a street works permit, the permit, to carry out in relation to the apparatus such works as are mentioned in subsection (3) or (3ZA); and references to an undertaker having apparatus in the street, or to the undertaker to whom apparatus belongs, shall be construed accordingly.
New Roads and Street Works Act 1991, s. 105“apparatus” includes any structure for the lodging therein of apparatus or for gaining access to apparatus;
- Source 2: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 107(1) In this Part a “road” means any way (other than a substitute road made under section 74(1) of the Roads (Scotland) Act 1984 or a waterway) whether or not there is over it a public right of passage and whether or not it is for the time being formed as a way; and the expression includes a square or court, and any part of a road. (2) Where a road passes over a bridge or through a tunnel, references in this Part to the road include that bridge or tunnel. (3) In this Part “road works” means works for any purposes other than roads purposes, being works of any of the following kinds executed in a road in pursuance of a statutory right or with permission granted under section 109— (a) placing apparatus, or (b) inspecting, maintaining, adjusting, repairing, altering or renewing apparatus, changing the position of apparatus or removing it, or works required for or incidental to any such works (including, in particular, breaking up or opening the road, or any sewer, drain or tunnel under it, or tunnelling or boring under the road). (4) In this Part “undertaker” in relation to road works means the person by whom the relevant statutory right is exercisable (in the capacity in which it is exercisable by him) or a person having permission under section 109 to execute road works, as the case may be. (5) References in this Part to the undertaker in relation to apparatus in a road are to the person entitled, by virtue of a statutory right or a permission granted under section 109, to carry out in relation to the apparatus such works as are mentioned in subsection (3); and references to an undertaker having apparatus in the road, or to the undertaker to whom apparatus belongs, shall be construed accordingly.
- Source 3: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the 2 quoted extracts
Street Works (Northern Ireland) Order 1995, art. 3(1) In this Order a “street” means the whole or any part of any of the following, irrespective of whether it is a thoroughfare— (a) any road, highway, lane, footway, alley or passage, (b) any square or court, and (c) any land laid out as a way whether it is for the time being formed as a way or not. Where a street passes over a bridge or through a tunnel, references in this Order to the street include that bridge or tunnel. (2) The provisions of this Order apply to a street which is not a road subject to such exceptions and adaptations as may be prescribed. (3) In this Order “street works” means works of any of the following kinds (other than works for road purposes) executed in a street in pursuance of a statutory right or a street works licence— (a) placing apparatus, or (b) inspecting, maintaining, adjusting, repairing, altering or renewing apparatus, changing the position of apparatus or removing it, or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street).
Street Works (Northern Ireland) Order 1995, art. 4(1) In this Order “undertaker” in relation to street works means the person by whom the relevant statutory right is exercisable (in the capacity in which it is exercisable by him) or the licensee under the relevant street works licence, as the case may be. (2) References in this Order to the undertaker in relation to apparatus in a street are to the person entitled, by virtue of a statutory right or a street works licence, to carry out in relation to the apparatus such works as are mentioned in Article 3(3); and references to an undertaker having apparatus in the street, or to the undertaker to whom apparatus belongs, shall be construed accordingly. (3) This Article is subject to Article 9(3).
- Source 4: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 65(1) An undertaker executing street works shall secure— (a) that any part of the street which is broken up or open, or is obstructed by plant or materials used or deposited in connection with the works, is adequately guarded and lit, and (b) that such traffic signs are placed and maintained, and where necessary operated, as are reasonably required for the guidance or direction of persons using the street, having regard, in particular, to the needs of people with a disability. (2) In discharging in relation to a highway his duty with respect to the placing, maintenance or operation of traffic signs, an undertaker shall comply with any directions given by the traffic authority. The power of the traffic authority to give directions under this subsection is exercisable subject to any directions given by the Secretary of State under section 65 of the Road Traffic Regulation Act 1984. (3) The Secretary of State may issue or approve for the purposes of this section codes of practice giving practical guidance as to the matters mentioned in subsection (1); and— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with that subsection; and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with that subsection. (4) An undertaker who fails to comply with subsection (1) or (2) commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale. (5) If it appears to the street authority that an undertaker has failed to comply with subsection (1) or (2), they may take such steps as appear to them necessary and may recover from the undertaker the costs reasonably incurred by them in doing so. (6) If a person without lawful authority or excuse— (a) takes down, alters or removes any fence, barrier, traffic sign or light erected or placed in pursuance of subsection (1) or (2) above, or (b) extinguishes a light so placed, he commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 5: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 124(1) An undertaker executing road works shall secure— (a) that any part of the road which is broken up or open, or is obstructed by plant or materials used or deposited in connection with the works, is adequately guarded and lit, and (b) that such traffic signs are placed and maintained, and where necessary operated, as are reasonably required for the guidance or direction of persons using the road, and in accordance with section 120 of the Roads (Scotland) Act 1984 (duty to have regard to the needs of people with a disability). (2) In discharging in relation to a road his duty with respect to the placing, maintenance or operation of traffic signs, an undertaker shall comply with any directions given by the traffic authority. The power of the traffic authority to give directions under this subsection is exercisable subject to any directions given by the Secretary of State under section 65 of the Road Traffic Regulation Act 1984. (3) The Secretary of State may issue or approve for the purposes of this section codes of practice giving practical guidance as to the matters mentioned in subsection (1); and— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with that subsection; and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with that subsection. (4) An undertaker who fails to comply with subsection (1) or (2) commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale. (5) If it appears to the road works authority that an undertaker has failed to comply with subsection (1) or (2), they may take such steps as appear to them necessary and may recover from the undertaker the costs reasonably incurred by them in doing so. (6) If a person without lawful authority or excuse— (a) takes down, alters or removes any fence, barrier, traffic sign or light erected or placed in pursuance of subsection (1) or (2) above, or (b) extinguishes a light so placed, he commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 6: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the quoted extract
Street Works (Northern Ireland) Order 1995, art. 25(1) An undertaker executing street works shall secure— (a) that any part of the street which is broken up or open, or is obstructed by plant or materials used or deposited in connection with the works, is adequately guarded and lit, and (b) that such traffic signs are placed and maintained, and where necessary operated, as are reasonably required for the guidance or direction of persons using the street, having regard, in particular, to the needs of people with a disability. (2) In discharging in relation to a road his duty with respect to the placing, maintenance or operation of traffic signs, an undertaker shall comply, with any directions given by the Department. (3) The Department may issue or approve for the purposes of this Article codes of practice giving practical guidance as to the matters mentioned in paragraph (1); and— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with that paragraph; and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with that paragraph. (4) An undertaker who fails to comply with paragraph (1) or (2) commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale. (5) If it appears to the street authority that an undertaker has failed to comply with paragraph (1) or (2), the street authority may take such steps as appear to it necessary and may recover from the undertaker the costs reasonably incurred by it in doing so. (6) If a person without lawful authority or excuse— (a) takes down, alters or removes any fence, barrier, traffic sign or light erected or placed in pursuance of paragraph (1) or (2), or (b) extinguishes a light so placed, he commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 7: New Roads and Street Works Act 1991Official textOur page on this source
Show the 2 quoted extracts
New Roads and Street Works Act 1991, s. 70(1) It is the duty of the undertaker by whom street works are executed to reinstate the street. (1A) The reinstatement required by subsection (1) may be permanent or interim. (2) He shall begin the reinstatement as soon after the completion of any part of the street works as is reasonably practicable and shall carry on and complete the reinstatement with all such dispatch as is reasonably practicable. (3) He shall within 10 working days from the date on which the reinstatement is completed give notice to the street authority of that completion— (a) stating whether the reinstatement is permanent or interim; and (b) giving such other information about the reinstatement as may be prescribed. (4) If the reinstatement is interim, he shall complete the permanent reinstatement of the street as soon as reasonably practicable, and in any event within 6 months from the date on which the interim reinstatement was completed. (4A) He shall, within 10 working days from the date on which the permanent reinstatement required by subsection (4) is completed, give notice to the street authority of that completion, giving such other information about the reinstatement as may be prescribed. (4B) The Secretary of State may by regulations modify the period specified in subsection (3), (4) or (4A). (5) The permanent reinstatement of the street shall include, in particular, the reinstatement of features designed to assist people with a disability. (6) An undertaker who fails to comply with any provision of this section commits an offence and is liable on summary conviction— (a) in the case of an offence consisting of a failure to comply with subsection (3) or (4A), to a fine not exceeding level 4 on the standard scale; and (b) in any other case, to a fine not exceeding level 5 on that scale. (7) In proceedings against a person for an offence of failing to comply with subsection (2) it is a defence for him to show that any delay in reinstating the street was in order to avoid hindering the execution of other works, or other parts of the same works, to be undertaken immediately or shortly thereafter.
New Roads and Street Works Act 1991, s. 71(1) An undertaker executing street works shall in reinstating the street comply with such requirements as may be prescribed as to the specification of materials to be used and the standards of workmanship to be observed. (2) He shall also ensure that the reinstatement conforms to such performance standards as may be prescribed— (a) in the case of interim reinstatement, until permanent reinstatement is effected, and (b) in the case of permanent reinstatement, for the prescribed period after the completion of the reinstatement. This obligation is extended in certain cases and restricted in others by the provisions of section 73 as to cases where a reinstatement is affected by subsequent works. (3) Regulations made for the purposes of this section may make different provision in relation to different classes of excavation and different descriptions of street, and in relation to interim and permanent reinstatement. (4) The Secretary of State may issue or approve for the purposes of this section codes of practice giving practical guidance as to the matters mentioned in subsections (1) and (2); and regulations made for the purposes of this section may provide that— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with his duties under this section; and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with those duties. (5) An undertaker who fails to comply with his duties under this section commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 8: New Roads and Street Works Act 1991Official textOur page on this source
Show the 2 quoted extracts
New Roads and Street Works Act 1991, s. 129(1) It is the duty of the undertaker by whom road works are executed to reinstate the road. (2) He shall begin the reinstatement as soon after the completion of any part of the road works as is reasonably practicable and shall carry on and complete the reinstatement with all such dispatch as is reasonably practicable. (3) He shall before the end of the next working day after the day on which the reinstatement is completed give the required notice that he has completed the reinstatement of the road, stating whether the reinstatement is permanent or interim. (4) If it is interim, he shall complete the permanent reinstatement of the road as soon as reasonably practicable and in any event within six months (or such other period as may be prescribed) from the date on which the interim reinstatement was completed; and he shall give the required notice when he has done so. (5) The permanent reinstatement of the road shall include, in particular, the reinstatement of features designed to assist people with a disability. (5A) For the purposes of subsection (3) or (4) an undertaker gives the required notice by— (a) giving to the Commissioner a notice containing such information as may be prescribed, and (b) entering in the SRWR a copy of that notice. (6) An undertaker who fails to comply with any provision of this section commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale. (7) In proceedings against a person for an offence of failing to comply with subsection (2) it is a defence for him to show that any delay in reinstating the road was in order to avoid hindering the execution of other works, or other parts of the same works, to be undertaken immediately or shortly thereafter.
New Roads and Street Works Act 1991, s. 130(1) An undertaker executing road works shall in reinstating the road comply with such requirements as may be prescribed as to the specification of materials to be used and the standards of workmanship to be observed. (2) He shall also ensure that the reinstatement conforms to such performance standards as may be prescribed— (a) in the case of interim reinstatement, until permanent reinstatement is effected, and (b) in the case of permanent reinstatement, for the prescribed period after the completion of the reinstatement. This obligation is extended in certain cases and restricted in others by the provisions of section 132 as to cases where a reinstatement is affected by subsequent works. (3) Regulations made for the purposes of this section may make different provision in relation to different classes of excavation and different descriptions of road, and in relation to interim and permanent reinstatement. (4) The Secretary of State may issue or approve for the purposes of this section codes of practice giving practical guidance as to the matters mentioned in subsections (1) and (2); and regulations made for the purposes of this section may provide that— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with his duties under this section; and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with those duties. (5) An undertaker who fails to comply with his duties under this section commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 9: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the 2 quoted extracts
Street Works (Northern Ireland) Order 1995, art. 30(1) It is the duty of the undertaker by whom street works are executed to reinstate the street. (2) He shall begin the reinstatement as soon after the completion of any part of the street works as is reasonably practicable and shall carry on and complete the reinstatement with all such dispatch as is reasonably practicable. (3) He shall before the end of the next working day after the day on which the reinstatement is completed inform the street authority that he has completed the reinstatement of the street, stating whether the reinstatement is permanent or interim. (4) If it is interim, he shall complete the permanent reinstatement of the street as soon as reasonably practicable and in any event within 6 months (or such other period as may be prescribed) from the date on which the interim reinstatement was completed; and he shall notify the street authority when he has done so. (5) The permanent reinstatement of the street shall include, in particular, the reinstatement of features designed to assist people with a disability. (6) An undertaker who fails to comply with any provision of this Article commits an offence and is liable on summary conviction (a) in the case of an offence consisting of a failure to comply with paragraph (3) or (4A), to a fine not exceeding level 4 on the standard scale; and (b) in any other case, to a fine not exceeding level 5 on that scale. (7) In proceedings against a person for an offence of failing to comply with paragraph (2) it is a defence for him to show that any delay in reinstating the street was in order to avoid hindering the execution of other works, or other parts of the same works, to be undertaker immediately or shortly thereafter.
Street Works (Northern Ireland) Order 1995, art. 31(1) An undertaker executing street works shall in reinstating the street comply with such requirements as may be prescribed as to the specification of materials to be used and the standards of workmanship to be observed. (2) He shall also ensure that the reinstatement conforms to such performance standards as may be prescribed— (a) in the case of interim reinstatement, until permanent reinstatement is effected, and (b) in the case of permanent reinstatement, for the prescribed period after the completion of the reinstatement. This obligation is extended in certain cases and restricted in others by the provisions of Article 33 as to cases where a reinstatement is affected by subsequent works. (3) The Department may issue or approve for the purposes of this Article codes of practice giving practical guidance as to the matters mentioned in paragraphs (1) and (2); and regulations made for the purposes of this Article may provide that— (a) so far as an undertaker complies with such a code of practice he shall be taken to comply with his duties under this Article, and (b) a failure in any respect to comply with any such code is evidence of failure in that respect to comply with those duties. (4) An undertaker who fails to comply with his duties under this Article commits an offence and is liable on summary conviction to a fine not exceeding level 5 on the standard scale.
- Source 10: New Roads and Street Works Act 1991Official textOur page on this source
Show the 2 quoted extracts
New Roads and Street Works Act 1991, s. 81, contiguous excerpt 1(1) An undertaker having apparatus in the street shall secure that the apparatus is maintained to the reasonable satisfaction of— (a) the street authority, as regards the safety and convenience of persons using the street (having regard, in particular, to the needs of people with a disability), the structure of the street and the integrity of apparatus of the authority in the street, and (b) any other relevant authority, as regards any land, structure or apparatus of theirs; and he shall afford reasonable facilities to each such authority for ascertaining whether it is so maintained. (2) For this purpose maintenance means the carrying out of such works as are necessary to keep the apparatus in efficient working condition (including periodic renewal where appropriate); and includes works rendered necessary by other works in the street, other than major highway, bridge or transport works (as to which, see sections 84 and 85 below). (3) If an undertaker fails to give a relevant authority the facilities required by this section— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute such works as are needed to enable them to inspect the apparatus in question, including any necessary breaking up or opening of the street. (4) If an undertaker fails to secure that apparatus is maintained to the reasonable satisfaction of a relevant authority in accordance with this section— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute any emergency works needed in consequence of the failure. (5) The provisions of this Part apply in relation to works executed by a relevant authority under subsection (3) or (4) as if they were executed by the undertaker; and the undertaker shall indemnify the authority in respect of the costs reasonably incurred by them in executing the works. (6) A relevant authority who execute or propose to execute any works under subsection (3) or (4) shall give notice to any other relevant authority as soon as reasonably practicable stating the general nature of the works. (7) Nothing in subsection (3) or (4) shall be construed as excluding any other means of securing compliance with the duties imposed by
New Roads and Street Works Act 1991, s. 81, contiguous excerpt 2(1) An undertaker having apparatus in the street shall secure that the apparatus is maintained to the reasonable satisfaction of— (a) the street authority, as regards the safety and convenience of persons using the street (having regard, in particular, to the needs of people with a disability), the structure of the street and the integrity of apparatus of the authority in the street, and (b) any other relevant authority, as regards any land, structure or apparatus of theirs; and he shall afford reasonable facilities to each such authority for ascertaining whether it is so maintained. (2) For this purpose maintenance means the carrying out of such works as are necessary to keep the apparatus in efficient working condition (including periodic renewal where appropriate); and includes works rendered necessary by other works in the street, other than major highway, bridge or transport works (as to which, see sections 84 and 85 below). (3) If an undertaker fails to give a relevant authority the facilities required by this section— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute such works as are needed to enable them to inspect the apparatus in question, including any necessary breaking up or opening of the street. (4) If an undertaker fails to secure that apparatus is maintained to the reasonable satisfaction of a relevant authority in accordance with this section— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute any emergency works needed in consequence of the failure. (5) The provisions of this Part apply in relation to works executed by a relevant authority under subsection (3) or (4) as if they were executed by the undertaker; and the undertaker shall indemnify the authority in respect of the costs reasonably incurred by them in executing the works. (6) A relevant authority who execute or propose to execute any works under subsection (3) or (4) shall give notice to any other relevant authority as soon as reasonably practicable stating the general nature of the works. (7) Nothing in subsection (3) or (4) shall be construed as excluding any other means of securing compliance with the duties imposed by subsection (1).
- Source 11: New Roads and Street Works Act 1991Official textOur page on this source
Show the 2 quoted extracts
New Roads and Street Works Act 1991, s. 140, contiguous excerpt 1(1) An undertaker having apparatus in the road shall secure that the apparatus is maintained to the reasonable satisfaction of— (a) the road works authority, as regards the safety and convenience of persons using the road (having regard, in particular, to the needs of people with a disability), the structure of the road and the integrity of apparatus of the authority in the road, and (b) any other relevant authority, as regards any land, structure or apparatus of theirs; and he shall afford reasonable facilities to each such authority for ascertaining whether it is so maintained. (2) For this purpose maintenance means the carrying out of such works as are necessary to keep the apparatus in efficient working condition (including periodic renewal where appropriate); and includes works rendered necessary by other works in the road, other than major works for road purposes, major bridge works or major transport works (as to which, see sections 143 and 144 below). (3) If an undertaker fails to give a relevant authority the facilities required by this section— (a) the road works authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute such works as are needed to enable them to inspect the apparatus in question, including any necessary breaking up or opening of the road. (4) If an undertaker fails to secure that apparatus is maintained to the reasonable satisfaction of a relevant authority in accordance with this section— (a) the road works authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute any emergency works needed in consequence of the failure. (5) The provisions of this Part apply in relation to works executed by a relevant authority under subsection (3) or (4) as if they were executed by the undertaker; and the undertaker shall indemnify the authority in respect of the costs reasonably incurred by them in executing the works. (6) A relevant authority who execute or propose to execute any works under subsection (3) or (4) shall give notice to any other relevant authority as soon as reasonably practicable stating the general nature of the works. (7) Nothing in subsection (3) or (4) shall be construed as excluding any other means of securing
New Roads and Street Works Act 1991, s. 140, contiguous excerpt 2compliance with the duties imposed by subsection (1).
- Source 12: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the quoted extract
Street Works (Northern Ireland) Order 1995, art. 41(1) An undertaker having apparatus in the street shall secure that the apparatus is maintained to the reasonable satisfaction of— (a) the street authority, as regards the safety and convenience of persons using the street (having regard, in particular, to the needs of people with a disability), the structure of the street and the integrity of apparatus of the authority in the street, and (b) any other relevant authority, as regards any land, structure or apparatus belonging to it; and he shall afford reasonable facilities to each such authority for ascertaining whether it is so maintained. (2) For this purpose maintenance means the carrying out of such works as are necessary to keep the apparatus in efficient working condition(including periodic renewal where appropriate); and includes works rendered necessary by other works in the street, other than major road, bridge or transport works (as to which, see Articles 44 and 45). (3) If an undertaker fails to give a relevant authority the facilities required by this Article— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute such works as are needed to enable it to inspect the apparatus in question, including any necessary breaking up or opening of the street. (4) If an undertaker fails to secure that apparatus is maintained to the reasonable satisfaction of a relevant authority in accordance with this Article— (a) the street authority may in such cases as may be prescribed, and (b) any other relevant authority may in any case, execute any emergency works needed in consequence of the failure. (5) The provisions of this Order apply in relation to works executed by a relevant authority under paragraph (3) or (4) as if they were executed by the undertaker; and the undertaker shall indemnify the authority in executing the works. (6) A relevant authority which executes or proposes to execute any works under paragraph (3) or (4) shall give notice to any other relevant authority as soon as reasonably practicable stating the general nature of the works. (7) Nothing in paragraph (3) or (4) shall be construed as excluding any other means of securing compliance with the duties imposed by paragraph (1).
- Source 13: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 82(1) An undertaker shall compensate— (a) the street authority or any other relevant authority in respect of any damage or loss suffered by the authority in their capacity as such, and (b) any other person having apparatus in the street in respect of any expense reasonably incurred in making good damage to that apparatus, as a result of the execution by the undertaker of street works or any event of a kind mentioned in subsection (2). (2) The events referred to in subsection (1) are any explosion, ignition, discharge or other event occurring to gas, electricity, water or any other thing required for the purposes of a supply or service afforded by an undertaker which— (a) at the time of or immediately before the event in question was in apparatus of the undertaker in the street, or (b) had been in such apparatus before that event and had escaped therefrom in circumstances which contributed to its occurrence. (3) The liability of an undertaker under this section arises— (a) whether or not the damage or loss is attributable to negligence on his part or on the part of any person for whom he is responsible, and (b) notwithstanding that he is acting in pursuance of a statutory duty. (4) However, his liability under this section does not extend to damage or loss which is attributable to misconduct or negligence on the part of— (a) the person suffering the damage or loss, or any person for whom he is responsible, or (b) a third party, that is, a person for whom neither the undertaker nor the person suffering the damage or loss is responsible. (5) For the purposes of this section the persons for whom a person is responsible are his contractors and any person in his employ or that of his contractors. (6) Nothing in this section shall be taken as exonerating an undertaker from any liability to which he would otherwise be subject.
- Source 14: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 141(1) An undertaker shall compensate— (a) the road works authority or any other relevant authority in respect of any damage or loss suffered by the authority in their capacity as such, and (b) any other person having apparatus in the road in respect of any expense reasonably incurred in making good damage to that apparatus, as a result of the execution by the undertaker of road works or any event of a kind mentioned in subsection (2) below. (2) The events referred to in subsection (1) are any explosion, ignition, discharge or other event occurring to gas, electricity, water or other thing required for the purposes of a supply or service afforded by an undertaker which— (a) at the time of or immediately before the event in question was in apparatus of the undertaker in the road, or (b) had been in such apparatus before that event and had escaped therefrom in circumstances which contributed to its occurrence. (3) The liability of an undertaker under this section arises— (a) whether or not the damage or loss is attributable to negligence on his part or on the part of any person for whom he is responsible, and (b) notwithstanding that he is acting in pursuance of a statutory duty. (4) However, his liability under this section does not extend to damage or loss which is attributable to misconduct or negligence on the part of— (a) the person suffering the damage or loss, or any person for whom he is responsible, or (b) a third party, that is, a person for whom neither the undertaker nor the person suffering the damage or loss is responsible. (5) For the purposes of this section the persons for whom a person is responsible are his contractors and any person in his employ or that of his contractors. (6) Nothing in this section shall be taken as exonerating an undertaker from any liability to which he would otherwise be subject.
- Source 15: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the quoted extract
Street Works (Northern Ireland) Order 1995, art. 42(1) An undertaker shall compensate— (a) the street authority or any other relevant authority in respect of any damage or loss suffered by the authority in its capacity as such, and (b) any other person having apparatus in the street in respect of any expense reasonably incurred in making good damage to that apparatus, as a result of the execution by the undertaker of street works or any event of a kind mentioned in paragraph (2). (2) The events referred to in paragraph (1) are any explosion, ignition, discharge or other event occurring to gas, electricity, water or any other thing required for the purposes of a supply or service afforded by an undertaker which— (a) at the time of or immediately before the event in question was in apparatus of the undertaker in the street, or (b) had been in such apparatus before that event and had escaped therefrom in circumstances which contributed to its occurrence. (3) The liability of an undertaker under this Article arises— (a) whether or not the damage or loss is attributable to negligence on his part or on the part of any person for whom he is responsible, and (b) notwithstanding that he is acting in pursuance of a statutory duty. (4) However, his liability under this Article does not extend to damage or loss which is attributable to misconduct or negligence on the part of— (a) the person suffering the damage or loss, or any person for whom he is responsible, or (b) a third party, that is, a person for whom neither the undertaker nor the person suffering the damage or loss is responsible. (5) For the purposes of this Article the persons for whom a person is responsible are his contractors and any person in his employ or that of his contractors. (6) Nothing in this Article shall be taken as exonerating an undertaker from any liability to which he would otherwise be subject.
- Source 16: Highways Act 1980Official textOur page on this source
Show the 2 quoted extracts
Highways Act 1980, s. 174, contiguous excerpt 1(1) Where a person is executing works of any description in a street (other than street works within the meaning of Part III of the New Roads and Street Works Act 1991), he— (a) shall erect such barriers and traffic signs for preventing danger to traffic, for regulating traffic, and for warning traffic of danger, as may be necessary and remove them as soon as they cease to be needed for any of those purposes; (b) shall cause the works to be properly guarded and lighted during the hours of darkness; and (c) where the nature of the works so requires, shall cause any building adjoining the street to be shored up or otherwise protected. (1A) The Secretary of State may give guidance to ... highway authorities as to the discharge by them of their obligations under subsection (1)(a) and (b) where they are executing works for road purposes. (1B) A ... highway authority must in executing any works for road purposes have regard to any guidance given under subsection (1A). (1C) In subsections (1A) and (1B) “ works for road purposes ” has the same meaning as in Part 3 of the New Roads and Street Works Act 1991. (2) Subject to subsection (3) below, if any person fails to satisfy an obligation to which he is subject by virtue of subsection (1) above he is guilty of an offence and, without prejudice to any other liability to which he may be subject apart from this subsection, is liable to a fine not exceeding £10 in respect of each day of such failure. (3) Where a person is subject to the same obligation by virtue of subsection (1) above and by virtue of some other enactment, then, without prejudice to section 18 of the Interpretation Act 1978 (offences under two or more laws), if a failure by him to satisfy that obligation is an offence under an enactment other than subsection (2) above, subsection (2) above does not apply in relation to a failure by him to satisfy that obligation. (4) If a person, without lawful authority or excuse,— (a) takes down, alters or removes any barrier, traffic sign, support or light erected or placed in pursuance of subsection (1) above or any fence, barrier, traffic sign or light erected or placed on or near a street in pursuance of any other enactment for the purpose of warning users of the street of any obstruction, whether caused by the
Highways Act 1980, s. 174, contiguous excerpt 2execution of works in or near the street or otherwise, or of protecting them from danger arising out of such an obstruction, or (b) extinguishes any light so placed, he is guilty of an offence and liable to a fine not exceeding level 3 on the standard scale. (5) For the purposes of section 312 below in its application to an offence under this section statutory undertakers and any universal service provider concerned in connection with the provision of a universal postal service are each to be deemed to be a person aggrieved.
- Source 17: Roads (Scotland) Act 1984Official textOur page on this source
Show the 3 quoted extracts
Roads (Scotland) Act 1984, s. 60, contiguous excerpt 1(1) Without prejudice to . . . sections 57 to 59 or section 85 of this Act, where any person (other than a roads authority) places or deposits anything on a road so as to cause an obstruction, or executes works in a road, he shall, whether or not the obstruction is, or works are, on or in the road with the consent of the roads authority— (a) cause the obstruction or works to be marked in such manner and with such materials as may, for the purpose of making it or them immediately visible to oncoming traffic, be specified; (b) provide such lighting of the obstruction or works during the hours of darkness as is necessary for preventing danger to traffic and for warning traffic of danger; (c) erect such fences, barriers and traffic signs for preventing danger to traffic, for regulating traffic, and for warning traffic of danger, as may be necessary and remove them as soon as they cease to be necessary therefor; and (d) in the case of an obstruction or works whose nature so requires, cause any building adjoining the road to be shored up or otherwise protected. (2) If the person referred to in subsection (1) above fails to fulfil a requirement imposed on him by that subsection, the roads authority may fulfil the requirement and recover the expenses reasonably incurred by them in so doing from that person. (3) A person who fails to fulfil a requirement imposed on him by subsection (1) above commits an offence. (3A) Where the roads authority places or deposits anything on a road so as to cause an obstruction, or executes works in a road, they must comply with the requirements in paragraphs (a) to (d) of subsection (1). (4) A person who, without lawful authority or reasonable excuse, takes down, alters or removes any fence, barrier, shoring or other support or protection, or any traffic sign erected in pursuance of subsection (1) , (2) or (3A) above, or removes, interferes with or extinguishes any light placed in pursuance of any of those subsections to indicate an obstruction or works on or in any road commits an offence. (5) In this section— “hours of darkness” means the time between half an hour after sunset and half an hour before sunrise; and “specified” means specified by the Secretary of State in regulations. (6) This section shall not apply to an undertaker
Roads (Scotland) Act 1984, s. 60, contiguous excerpt 2executing road works, within the meaning of Part IV of the New Roads and Street Works Act 1991.
Roads (Scotland) Act 1984, s. 60A(1) The Scottish Ministers may, for the purposes of section 60, and following consultation with such persons as they consider appropriate, issue or approve codes of practice giving practical guidance as to the matters mentioned in that section. (2) A code of practice under subsection (1) must be published in such manner as the Scottish Ministers consider appropriate as soon as reasonably practicable after it is issued or approved. (3) If (and in so far as) a person complies with such a code of practice, the person is to be taken to comply with the requirements imposed on the person by section 60(1) or, as the case may be, (3A). (4) A failure to comply with such a code of practice is evidence of a failure to comply with the requirements imposed on the person by section 60(1) or, as the case may be, (3A).
- Source 18: The Road Traffic Regulation (Northern Ireland) Order 1997Official textOur page on this source
Show the quoted extract
Road Traffic Regulation (Northern Ireland) Order 1997, art. 31(1) Where works to, on or near any road cause, or are likely to cause, danger to traffic,— (a) the person who has entered into a contract or otherwise undertaken to carry out those works shall make available to the person present at and for the time being in charge of carrying out those works such signs or other devices as would, if properly placed, provide adequate warning to traffic of that danger; (b) the person present at and for the time being in charge of carrying out those works shall— (i) place and maintain those signs or devices, or cause those signs or devices to be placed and maintained in such manner as to give traffic sufficient warning of that danger; and (ii) remove or cause to be removed those signs or devices as soon as the works have been completed. (2) For the purposes of paragraph (1), signs or devices which comply with, and are placed in accordance with, such general or other directions as may be given by an authorised officer of the Department shall be deemed to provide adequate warning to traffic. (3) The works referred to in paragraph (1) do not include street works within the meaning of the Street Works (Northern Ireland) Order 1995. (4) Any person who without reasonable excuse fails to comply with any requirement of paragraph (1) is guilty of an offence.
- Source 19: Highways Act 1980Official textOur page on this source
Show the 3 quoted extracts
Highways Act 1980, s. 41, contiguous excerpt 1(1) The authority who are for the time being the highway authority for a highway maintainable at the public expense are under a duty, subject to subsections (2) and (4) below, to maintain the highway. (1A) In particular, a highway authority are under a duty to ensure, so far as is reasonably practicable, that safe passage along a highway is not endangered by snow or ice. (2) An order made by the Minister under section 10 above directing that a highway proposed to be constructed by him or a strategic highways company shall become a trunk road may, as regards— (a) a highway to which this subsection applies which becomes a trunk road by virtue of the order, or (b) a part of a highway to which this subsection applies, being a part which crosses the route of the highway to be so constructed, contain such a direction as is specified in subsection (4) below. (3) Subsection (2) above applies to— (a) any highway maintainable at the public expense by a local highway authority, and (b) any highway other than a highway falling within paragraph (a) above or a highway maintainable under a special enactment or by reason of tenure, enclosure or prescription. (4) The direction referred to in subsection (2) above is— (a) in a case where the highway or part of a highway falls within subsection (3)(a) above, a direction that, notwithstanding subsection (1) above, it shall be maintained by the highway authority for that highway until such date, not being later than the date on which the new route is opened for the purposes of through traffic, as may be specified in a notice given by the Minister to that authority; and (b) in a case where the highway or part of a highway falls within subsection (3)(b) above, a direction that, notwithstanding subsection (1) above, the Minister or the strategic highways company is to be under no duty to maintain it until such date as aforesaid. (5) Where an order under section 10 above contains a direction made in pursuance of subsections (2) to (4) above, then, until the date specified in the notice given by the Minister pursuant to the direction, in accordance with subsection (4) above, the powers of a highway authority under sections 97, 98, 270 and 301 below as respects the highway to which the direction relates are exercisable by the highway
Highways Act 1980, s. 41, contiguous excerpt 2authority to whom the notice is required to be given, as well as by the Minister or the strategic highways company .
Highways Act 1980, s. 58(1) In an action against a highway authority in respect of damage resulting from their failure to maintain a highway maintainable at the public expense it is a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove that the authority had taken such care as in all the circumstances was reasonably required to secure that the part of the highway to which the action relates was not dangerous for traffic. (2) For the purposes of a defence under subsection (1) above, the court shall in particular have regard to the following matters:— (a) the character of the highway, and the traffic which was reasonably to be expected to use it; (b) the standard of maintenance appropriate for a highway of that character and used by such traffic; (c) the state of repair in which a reasonable person would have expected to find the highway; (d) whether the highway authority knew, or could reasonably have been expected to know, that the condition of the part of the highway to which the action relates was likely to cause danger to users of the highway; (e) where the highway authority could not reasonably have been expected to repair that part of the highway before the cause of action arose, what warning notices of its condition had been displayed; but for the purposes of such a defence it is not relevant to prove that the highway authority had arranged for a competent person to carry out or supervise the maintenance of the part of the highway to which the action relates unless it is also proved that the authority had given him proper instructions with regard to the maintenance of the highway and that he had carried out the instructions. (3) This section binds the Crown. (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- Source 20: Roads (Scotland) Act 1984Official textOur page on this source
Show the 3 quoted extracts
Roads (Scotland) Act 1984, s. 1, contiguous excerpt 1(1) Subject to subsection (10) below, a local roads authority shall manage and maintain all such roads in their area as are for the time being entered in a list (in this Act referred to as their “list of public roads”) prepared and kept by them under this section; and for the purposes of such management and maintenance (and without prejudice to this subsection’s generality) they shall, subject to the provisions of this Act, have power to reconstruct, alter, widen, improve or renew any such road or to determine the means by which the public right of passage over it, or over any part of it, may be exercised. (2) Subject to subsection (10) below, the list of public roads prepared by the local roads authority shall, at the date of commencement of this section, comprise all public roads which immediately prior to that date were required to be entered by the local highway authority for the area in a list of the roads highways and bridges under their management and control under section 41 of the Roads and Bridges (Scotland) Act 1878 or in a register of streets under section 5 of the Burgh Police (Scotland) Act 1903 or any corresponding local enactment. (3) The list of public roads shall be open for inspection free of charge at such reasonable times and places as the local roads authority may determine. (4) The local roads authority may, subject to the provisions of this Act, add to or delete from their list of public roads; but before any entry for a road which for the time being is a private road is so added or any entry for a public road is so deleted they shall— (a) give notice of their intention in that regard to the frontages of that road; and (b) publish a notice of such intention in at least one newspaper circulating in the area, and, where any representation is made within 28 days after the requirements of paragraphs (a) and (b) above have been fulfilled, the authority shall consider that representation and give notice to the person making it and, with a note or copy of the representation, to the frontagers (or to the other frontagers if it was a representation by a frontager) of the authority’s decision as regards whether or not to proceed with the addition or deletion following the representation: Provided that— any addition or deletion giving effect to a
Roads (Scotland) Act 1984, s. 1, contiguous excerpt 2decision under subsection (5) below; any deletion in consequence of the stopping up of a public road under this Act; or any deletion on transfer of such a road to another roads authority, shall not require such intimation or publication as is mentioned in paragraphs (a) and (b) above. (5) The requisite number of frontagers to whom notice of a decision following a representation is given under subsection (4) above may, within 28 days of such notice, refer the matter by summary application to the sheriff. His decision thereon shall, subject to subsection (8) below, be final and, where that decision requires the addition or deletion to be proceeded with, shall be given effect to forthwith by the local roads authority. (6) A decision of which notice is given under subsection (4) above shall not be given effect to until the 28 days mentioned in subsection (5) above have expired or, if the matter has been referred under the said subsection (5) to the sheriff, until the summary application has been disposed of or abandoned. (7) In subsection (5) above, “the requisite number” means— (a) a majority; or (b) such number as together owns land which . . . . . . includes not less than half of the boundary between the land fronting or abutting the road mentioned in subsection (4)(a) above and that road; . . . . . . (8) Subsection (5) above is without prejudice to the rights of the local roads authority to proceed again under subsection (4) above as regards the same addition or deletion (or as regards an addition or deletion which comprehends, or is comprehended in, the same addition or deletion) where there has been a material change of circumstances since the publication, in relation to the original proposed addition or deletion, of the notice under subsection (4)(b) above. (9) Subject to subsection (10) below, every road which is entered in the list of public roads kept by a local roads authority shall vest in the authority for the purposes of their functions as roads authority: but such vesting shall not confer on an authority any heritable right in relation to a road. (10) There shall not vest under subsection (9) above any bridge which both— (a) immediately prior to the commencement of this section was not so managed and controlled as is mentioned in subsection (2)
Roads (Scotland) Act 1984, s. 1, contiguous excerpt 3above; and (b) has not since such commencement been acquired (whether compulsorily or by agreement) by the local roads authority, and without prejudice to sections 79 to 81 of this Act, until such acquisition the authority shall not manage and maintain the bridge (as distinct from any road carried by it) and any entry in their list of public roads in respect of such a road shall include a statement to the effect that the road does not, for the purposes of subsection (1) above, comprise the bridge carrying the road.
- Source 21: The Roads (Northern Ireland) Order 1993Official textOur page on this source
Show the 2 quoted extracts
Roads (Northern Ireland) Order 1993, art. 8, contiguous excerpt 1(1) The Department shall be under a duty to maintain all roads and for that purpose may provide such maintenance compounds as it thinks fit. (2) In an action against the Department in respect of injury or damage resulting from its failure to maintain a road it shall be a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove— (a) that the Department had taken such care as in all the circumstances was reasonably required to secure that the part of the road to which the action relates was not dangerous for traffic; or (b) that the injury or damage— (i) resulted from works (other than works by or on behalf of the Department) carried out on or under that part of the road to which the action relates; and (ii) resulted from an event which occurred before the completion of the re-instatement or making good of that part of the road in accordance with any relevant requirement. (3) For the purposes of a defence under paragraph (2)(a) the court shall in particular have regard to the following matters— (a) the character of the road, and the traffic which was reasonably expected to use it; (b) the standard of maintenance appropriate for a road of that character and used by such traffic; (c) the state of repair in which a reasonable person would have expected to find the road; (d) whether the Department knew, or could reasonably have been expected to know, that the condition of the part of the road to which the action relates was likely to cause danger to users of the road; (e) where the Department could not reasonably have been expected to repair that part of the road before the cause of action arose, what warning notices of its condition had been displayed; but, for the purposes of such a defence, it shall not be relevant to prove that the Department had arranged for a competent person to carry out or supervise the maintenance of the part of the road to which the action relates, unless it is also proved that the Department had given him proper instructions with regard to the maintenance of the road and that he had carried out the instructions. (4) In paragraph (2)(b) “relevant requirement” means a requirement imposed by or under this Order or any other statutory provision or rule of law or by, or in
Roads (Northern Ireland) Order 1993, art. 8, contiguous excerpt 2connection with the issue of, any approval, consent, licence, notice or permission issued under this Order or any other statutory provision.
- Source 22: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 53(1) A street authority shall keep a register showing with respect to each street for which they are responsible such information as may be prescribed with respect to the street works, and such other descriptions of works as may be prescribed, executed or proposed to be executed in the street. (2) The register shall contain such other information, and shall be kept in such form and manner, as may be prescribed. (3) The authority shall make the register available for inspection, at all reasonable hours and free of charge— (a) so far as it relates to restricted information, by any person having authority to execute works of any description in the street, or otherwise appearing to the authority to have a sufficient interest, and (b) so far as it relates to information which is not restricted, by any person. The Secretary of State may make provision by regulations as to the information which is restricted for the purposes of this subsection. (4) The Secretary of State may make arrangements for the duties of street authorities under this section to be discharged by means of one or more central registers kept by a person appointed in pursuance of the arrangements. (4A) In subsection (4) “central register” means a register covering the areas of two or more street authorities. (5) If such arrangements are made the Secretary of State may require street authorities to participate in and make contributions towards the cost of the arrangements. (5A) In particular the Secretary of State may require a street authority to share information in their possession with a person appointed to keep a central register which discharges the duties of that authority under this section. (6) The Secretary of State may by regulations make provision with respect to any register kept in pursuance of this section— (a) requiring the registration of such information as may be prescribed, and (b) requiring the payment of such fee as may be prescribed in respect of the registration of information of any prescribed description; and the regulations may contain provision as to the person responsible for securing the registration of the information and the person liable to pay the fee.
- Source 23: New Roads and Street Works Act 1991Official textOur page on this source
Show the quoted extract
New Roads and Street Works Act 1991, s. 112A(1) The Scottish Road Works Commissioner (in this Part, “the Commissioner”) shall keep a register, to be known as the Scottish Road Works Register (in this Part, “the SRWR”). (2) The SRWR shall be kept in such form and manner as may be prescribed. (3) The Commissioner shall make arrangements so as to enable any person who is required, by a provision of this Act, to enter particulars, information or a notice in the SRWR, to have access to the SRWR for that purpose. (4) The Scottish Ministers may by regulations— (a) provide that the payment to the Commissioner of the prescribed fee is a condition of access to the SRWR as mentioned in subsection (3) (and different fees may be prescribed for access for different purposes), and (b) make other provision as to the payment to the Commissioner by such persons as are prescribed of such amounts as are prescribed. (5) Amounts received by the Commissioner under subsection (4) are to be applied by the Commissioner to the keeping of the SRWR. (6A) The Commissioner is to— (a) make publicly available, in such form and manner as the Commissioner considers appropriate— (i) information contained in the SRWR relating to the timing, location, duration and purpose of works in roads, and (ii) such other information contained in the SRWR as the Scottish Ministers may prescribe, and (b) make information contained in the SRWR available to— (i) any person having authority to execute works of any description in a road, or (ii) any person who does not have that authority, but who appears to the Commissioner to have sufficient interest in the information to be permitted to access it.
- Source 24: The Street Works (Northern Ireland) Order 1995Official textOur page on this source
Show the quoted extract
Street Works (Northern Ireland) Order 1995, art. 13(1) The Department shall keep a register showing with respect to each street such information as may be prescribed with respect to the street works, and such other descriptions of works as may be prescribed, executed or proposed to be executed in the street. (2) The register shall contain such other information, and shall be kept in such form and manner, as may be prescribed. (3) The Department shall make the register available for inspection, at all reasonable hours and free of charge— (a) so far as it relates to restricted information, by any person having authority to execute works of any description in the street, or otherwise appearing to the Department to have a sufficient interest, and (b) so far as it relates to information which is not restricted, by any person. The Department may make provision by regulations as to the information which is restricted for the purposes of this paragraph. (4) The Department may by regulations make provision with respect to any register kept in pursuance of this Article— (a) requiring the registration of such information as may be prescribed, and (b) requiring the payment of such fee as may be prescribed in respect of the registration of information of any prescribed description; and the regulations may contain provision as to the person responsible for securing the registration of the information and the person liable to pay the fee.
- Source 25: The Highway CodeOfficial textOur page on this source
Show the quoted extract
Highway Code rule 283Rule 283 If you are involved in an incident or collision or stop to give assistance if possible, stop in a place of relative safety (see Rule 275) use your hazard warning lights to warn other traffic put on high-visibility clothing if you have it ask drivers to switch off their engines ask drivers and passengers to stop smoking contact the emergency services on 999 and provide full details of the incident location and any casualties. Use an emergency telephone, a mobile telephone, or press the SOS button if your vehicle has one (see Rule 277 on how to identify your location on a motorway or other high-speed road) move uninjured people away from the vehicles to a place of relative safety (see Rule 275) DO NOT move injured people from their vehicles unless they are in immediate danger DO NOT remove a motorcyclist’s helmet unless it is essential and you are trained to do so be prepared to give first aid (see First aid on the road and Useful websites) stay at the scene until the emergency services arrive be prepared to exchange details (see Rule 286). If you are involved in any other medical emergency, you should contact the emergency services in the same way.
- Source 26: The Highway Code for Northern IrelandOfficial textOur page on this source
Show the quoted extract
Highway Code for Northern Ireland rule 283283 If you are involved in a collision or stop to give assistance: use your hazard warning lights to warn other traffic ask drivers to switch off their engines and stop smoking arrange for the emergency services to be called immediately with full details of the incident location and any casualties (on a motorway, use the emergency telephone which allows easy location by the emergency services) if you use a mobile phone, first make sure you have identified your location from the marker posts on the side of the hard shoulder move uninjured people away from the vehicles to safety - on a motorway this should, if possible, be well away from the traffic, the hard shoulder and the central reservation do not move injured people from their vehicles unless they are in immediate danger from fire or explosion do not remove a motorcyclist’s helmet unless it is essential to do so be prepared to give first aid stay at the scene until emergency services arrive If you are involved in any other medical emergency on the motorway you should contact the emergency services in the same way.
- Source 27: The Highway CodeOfficial textOur page on this source
Show the quoted extract
Highway Code rule 288Rule 288 When the ‘Road Works Ahead’ sign is displayed, take extra care and look for additional signs providing more specific instructions. Observe all signs – they are there for your safety and the safety of road workers. You MUST NOT exceed any temporary maximum speed limit. Keep a safe distance from the vehicle in front (see Rule 126). Use your mirrors and get into the correct lane for your vehicle in good time and as signs direct. Do not switch lanes to overtake queuing traffic. Take extra care near cyclists and motorcyclists as they are vulnerable to skidding on grit, mud or other debris at road works. Where lanes are restricted due to road works, merge in turn (see Rule 134). Do not drive through an area marked off by traffic cones. Watch out for vehicles entering or leaving the works area. Where vehicles are travelling in the road and are displaying amber warning lights, leave extra space and expect them to slow or turn into a works area. Concentrate on the road ahead, not the road works. Bear in mind that the road ahead may be obstructed by the works or by slow-moving or stationary traffic. Law RTRA sect 16
- Source 28: The Highway Code for Northern IrelandOfficial textOur page on this source
Show the quoted extract
Highway Code for Northern Ireland rule 288288 When the ‘Road Works Ahead’ sign is displayed, you will need to be more watchful and look for additional signs providing more specific instructions. Observe all signs – they are there for your safety and the safety of road workers. you must not exceed any temporary maximum speed limit use your mirrors and get into the correct lane for your vehicle in good time and as signs direct do not switch lanes to overtake queuing traffic take extra care near cyclists and motorcyclists as they are vulnerable to skidding on grit, mud and other debris at road works where lanes are restricted due to road works, merge in turn (see rule 134) do not drive through an area marked off by traffic cones watch out for traffic entering or leaving the works area, but do not be distracted by what is going on there - concentrate on the road ahead, not the road works bear in mind that the road ahead may be obstructed by the works or by slow moving or stationary traffic keep a safe distance – there could be queues in front Law RTRO Art 43
- Source 29: Road Traffic Act 1988Official textOur page on this source
Show the 2 quoted extracts
Road Traffic Act 1988, s. 38, contiguous excerpt 1(1) The Highway Code shall continue to have effect, subject however to revision in accordance with the following provisions of this section. (2) Subject to the following provisions of this section, the Secretary of State may from time to time revise the Highway Code by revoking, varying, amending or adding to the provisions of the Code in such manner as he thinks fit. (3) Where the Secretary of State proposes to revise the Highway Code by making any alterations in the provisions of the Code (other than alterations merely consequential on the passing, amendment or repeal of any statutory provision) he must lay the proposed alterations before both Houses of Parliament and must not make the proposed revision until after the end of a period of forty days beginning with the day on which the alterations were so laid. (4) If within the period mentioned in subsection (3) above either House resolves that the proposed alterations be not made, the Secretary of State must not make the proposed revision (but without prejudice to the laying before Parliament of further proposals for alteration in accordance with that subsection). (5) Before revising the Highway Code by making any alterations in its provisions which are required by subsection (3) above to be laid before Parliament, the Secretary of State must consult with such representative organisations as he thinks fit. (6) The Secretary of State must cause the Highway Code to be printed and may cause copies of it to be sold to the public at such price as he may determine. (7) A failure on the part of a person to observe a provision of the Highway Code shall not of itself render that person liable to criminal proceedings of any kind but any such failure may in any proceedings (whether civil or criminal, and including proceedings for an offence under the Traffic Acts, the Public Passenger Vehicles Act 1981 or sections 18 to 23 of the Transport Act 1985) be relied upon by any party to the proceedings as tending to establish or negative any liability which is in question in those proceedings. (8) In this section “the Highway Code” means the code comprising directions for the guidance of persons using roads issued under section 45 of the Road Traffic Act 1930, as from time to time revised under this section or under any
Road Traffic Act 1988, s. 38, contiguous excerpt 2previous enactment. (9) For the purposes of subsection (3) above— (a) “statutory provision” means a provision contained in an Act or in subordinate legislation within the meaning of the Interpretation Act 1978 (and the reference to the passing or repeal of any such provision accordingly includes the making or revocation of any such provision), (b) where the proposed alterations are laid before each House of Parliament on different days, the later day shall be taken to be the day on which they were laid before both Houses, and (c) in reckoning any period of forty days, no account shall be taken of any time during which Parliament is dissolved or prorogued or during which both Houses are adjourned for more than four days.
- Source 30: The Road Traffic (Northern Ireland) Order 1995Official textOur page on this source
Show the quoted extract
Road Traffic (Northern Ireland) Order 1995, art. 51(1) The Highway Code shall continue to have effect, subject however to revision in accordance with the following provisions of this Article. (2) Subject to the following provisions of this Article, the Department may revise the Highway Code by revoking, varying, amending or adding to the provisions of the Code in such manner as it thinks fit. (3) Where the Department proposes to revise the Highway Code by making any alterations in the provisions of the Code (other than alterations merely consequential on the passing, amendment or repeal of any statutory provision) the proposed revision shall, as soon as it is prepared by the Department, be subject to negative resolution. (4) Before revising the Highway Code by making any alterations in its provisions, which under paragraph (3) are subject to negative resolution, the Department must consult with such representative organisations as it thinks fit. (5) The Department must cause the Highway Code to be printed and may cause copies of it to be sold to the public at such price as the Department may determine. (6) A failure on the part of any person to observe any provision of the Highway Code shall not of itself render that person liable to criminal proceedings of any kind, but any such failure may in any proceedings (whether civil or criminal, and including proceedings for an offence under the Road Traffic Orders) be relied upon by any party to the proceedings as tending to establish or to negative any liability which is in question in those proceedings. (7) In this Article “the Highway Code” means the code comprising directions for the guidance of persons using roads issued under Article 130 of the Order of 1981, as from time to time revised under this Article or under any previous enactment.
- Source 31: Law Reform (Contributory Negligence) Act 1945Official textOur page on this source
Show the quoted extract
Law Reform (Contributory Negligence) Act 1945, s. 1(1) Where any person suffers damage as the result partly of his own fault and partly of the fault of any other person or persons, a claim in respect of that damage shall not be defeated by reason of the fault of the person suffering the damage, but the damages recoverable in respect thereof shall be reduced to such extent as the court thinks just and equitable having regard to the claimant’s share in the responsibility for the damage: Provided that— (a) this subsection shall not operate to defeat any defence arising under a contract; (b) where any contract or enactment providing for the limitation of liability is applicable to the claim, the amount of damages recoverable by the claimant by virtue of this subsection shall not exceed the maximum limit so applicable. (2) Where damages are recoverable by any person by virtue of the foregoing subsection subject to such reduction as is therein mentioned, the court shall find and record the total damages which would have been recoverable if the claimant had not been at fault. (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5) Where, in any case to which subsection (1) of this section applies, one of the persons at fault avoids liability to any other such person or his personal representative by pleading the Limitation Act 1939, or any other enactment limiting the time within which proceedings may be taken, he shall not be entitled to recover any damages or contributions from that other person or representative by virtue of the said subsection. (6) Where any case to which subsection (1) of this section applies is tried with a jury, the jury shall determine the total damages which would have been recoverable if the claimant had not been at fault and the extent to which those damages are to be reduced. (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- Source 32: Law Reform (Miscellaneous Provisions) Act (Northern Ireland) 1948Official textOur page on this source
Show the quoted extract
Law Reform (Miscellaneous Provisions) Act (Northern Ireland) 1948, s. 2(1) Where any person suffers damage as the result partly of his own fault and partly of the fault of any other person or persons, a claim in respect of that damage shall not be defeated by reason of the fault of the person suffering the damage, but the damages recoverable in respect thereof shall be reduced to such extent as the court thinks just and equitable having regard to the claimant's share in the responsibility for the damage: Provided that— (a) this sub-section shall not operate to defeat any defence arising under a contract; (b) where any contract or enactment providing for the limitation of liability is applicable to the claim, the amount of damages recoverable by the claimant by virtue of this sub-section shall not exceed the maximum limit so applicable. (2) Where damages are recoverable by any person by virtue of the preceding sub-section subject to such reduction as is therein mentioned, the court shall find and record the total damages which would have been recoverable if the claimant had not been at fault. Subs.(3) rep. by 1978 c.47; subs.(4) rep. by 1977 NI 18 (5) Where, in any case to which sub-section (1) of this section applies, one of the persons at fault or his personal representative avoids liability to any other such person or his personal representative by pleading any enactment limiting the time within which proceedings may be taken, he shall not be entitled to recover any damages… from that other person or representative by virtue of the said sub-section. (6) Where any case to which sub-section (1) of this section applies is tried with a jury, the jury shall determine the total damages which would have been recoverable if the claimant had not been at fault and the extent to which those damages are to be reduced. Subs.(7) rep. by 1961 c.27
- Source 33: Civil Liability (Contribution) Act 1978Official textOur page on this source
Show the 2 quoted extracts
Civil Liability (Contribution) Act 1978, s. 1, contiguous excerpt 1(1) Subject to the following provisions of this section, any person liable in respect of any damage suffered by another person may recover contribution from any other person liable in respect of the same damage (whether jointly with him or otherwise). (2) A person shall be entitled to recover contribution by virtue of subsection (1) above notwithstanding that he has ceased to be liable in respect of the damage in question since the time when the damage occurred, provided that he was so liable immediately before he made or was ordered or agreed to make the payment in respect of which the contribution is sought. (3) A person shall be liable to make contribution by virtue of subsection (1) above notwithstanding that he has ceased to be liable in respect of the damage in question since the time when the damage occurred, unless he ceased to be liable by virtue of the expiry of a period of limitation or prescription which extinguished the right on which the claim against him in respect of the damage was based. (4) A person who has made or agreed to make any payment in bona fide settlement or compromise of any claim made against him in respect of any damage (including a payment into court which has been accepted) shall be entitled to recover contribution in accordance with this section without regard to whether or not he himself is or ever was liable in respect of the damage, provided, however, that he would have been liable assuming that the factual basis of the claim against him could be established. (5) A judgment given in any action brought in any part of the United Kingdom by or on behalf of the person who suffered the damage in question against any person from whom contribution is sought under this section shall be conclusive in the proceedings for contribution as to any issue determined by that judgment in favour of the person from whom the contribution is sought. (6) References in this section to a person’s liability in respect of any damage are references to any such liability which has been or could be established in an action brought against him in England and Wales by or on behalf of the person who suffered the damage; but it is immaterial whether any issue arising in any such action was or would be determined (in accordance with the rules of private
Civil Liability (Contribution) Act 1978, s. 1, contiguous excerpt 2international law) by reference to the law of a country outside England and Wales.
- Source 34: Law Reform (Miscellaneous Provisions) (Scotland) Act 1940Official textOur page on this source
Show the quoted extract
Law Reform (Miscellaneous Provisions) (Scotland) Act 1940, s. 3(1) Where in any action of damages in respect of loss or damage arising from any wrongful acts or negligent acts or omissions two or more persons are, in pursuance of the verdict of a jury or the judgment of a court found jointly and severally liable in damages or expenses, they shall be liable inter se to contribute to such damages or expenses in such proportions as the jury or the court, as the case may be, may deem just: Provided that nothing in this subsection shall affect the right of the person to whom such damages or expenses have been awarded to obtain a joint and several decree therefor against the persons so found liable. (2) Where any person has paid any damages or expenses in which he has been found liable in any such action as aforesaid, he shall be entitled to recover from any other person who, if sued, might also have been held liable in respect of the loss or damage on which the action was founded, such contribution, if any, as the court may deem just. (3) Nothing in this section shall— (a) apply to any action in respect of loss or damage suffered before the commencement of this Act; or (b) affect any contractual or other right of relief or indemnity or render enforceable any agreement for indemnity which could not have been enforced if this section had not been enacted.
- Source 35: Freedom of Information Act 2000Official textOur page on this source
Show the quoted extract
Freedom of Information Act 2000, s. 1(1) Any person making a request for information to a public authority is entitled— (a) to be informed in writing by the public authority whether it holds information of the description specified in the request, and (b) if that is the case, to have that information communicated to him. (2) Subsection (1) has effect subject to the following provisions of this section and to the provisions of sections 2, 9, 12 and 14. (3) Where a public authority— (a) reasonably requires further information in order to identify and locate the information requested, and (b) has informed the applicant of that requirement, the authority is not obliged to comply with subsection (1) unless it is supplied with that further information. (4) The information— (a) in respect of which the applicant is to be informed under subsection (1)(a), or (b) which is to be communicated under subsection (1)(b), is the information in question held at the time when the request is received, except that account may be taken of any amendment or deletion made between that time and the time when the information is to be communicated under subsection (1)(b), being an amendment or deletion that would have been made regardless of the receipt of the request. (5) A public authority is to be taken to have complied with subsection (1)(a) in relation to any information if it has communicated the information to the applicant in accordance with subsection (1)(b). (6) In this Act, the duty of a public authority to comply with subsection (1)(a) is referred to as “the duty to confirm or deny”.
- Source 36: Freedom of Information (Scotland) Act 2002Official textOur page on this source
Show the quoted extract
Freedom of Information (Scotland) Act 2002, s. 1(1) A person who requests information from a Scottish public authority which holds it is entitled to be given it by the authority. (2) The person who makes such a request is in this Part and in Parts 2 and 7 referred to as the “applicant”. (3) If the authority— (a) requires further information in order to identify and locate the requested information; and (b) has told the applicant so (specifying what the requirement for further information is), then, provided that the requirement is reasonable, the authority is not obliged to give the requested information until it has the further information. (4) The information to be given by the authority is that held by it at the time the request is received, except that, subject to subsection (5), any amendment or deletion which would have been made, regardless of the receipt of the request, between that time and the time it gives the information may be made before the information is given. (5) The requested information is not, by virtue of subsection (4), to be destroyed before it can be given (unless the circumstances are such that it is not reasonably practicable to prevent such destruction from occurring). (6) This section is subject to sections 2, 9, 12 and 14.
- Source 37: The Environmental Information Regulations 2004Official textOur page on this source
Show the 5 quoted extracts
Environmental Information Regulations 2004, reg. 2, contiguous excerpt 1(1) In these Regulations— “the Act” means the Freedom of Information Act 2000; “applicant”, in relation to a request for environmental information, means the person who made the request; “appropriate records authority”, in relation to a transferred public record, has the same meaning as in section 15(5) of the Act; “the Commission” means the Information Commission; ... “the data protection principles” means the principles set out in— Article 5(1) of the UK GDPR, section 34(1) of the Data Protection Act 2018, and section 85(1) of that Act; “data subject” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act); “the Directive” means Council Directive 2003/4/EC on public access to environmental information and repealing Council Directive 90/313/EEC; “environmental information” has the same meaning as in Article 2(1) of the Directive, namely any information in written, visual, aural, electronic or any other material form on— the state of the elements of the environment, such as air and atmosphere, water, soil, land, landscape and natural sites including wetlands, coastal and marine areas, biological diversity and its components, including genetically modified organisms, and the interaction among these elements; factors, such as substances, energy, noise, radiation or waste, including radioactive waste, emissions, discharges and other releases into the environment, affecting or likely to affect the elements of the environment referred to in (a); measures (including administrative measures), such as policies, legislation, plans, programmes, environmental agreements, and activities affecting or likely to affect the elements and factors referred to in (a) and (b) as well as measures or activities designed to protect those elements; reports on the implementation of environmental legislation; cost-benefit and other economic analyses and assumptions used within the framework of the measures and activities referred to in (c); and the state of human health and safety, including the contamination of the food chain, where relevant, conditions of human life, cultural sites and built structures inasmuch as they are or may be affected by the state of the elements of the environment referred to in (a) or, through those elements, by any of the matters
Environmental Information Regulations 2004, reg. 2, contiguous excerpt 2referred to in (b) and (c); ... “historical record” has the same meaning as in section 62(1) of the Act; “personal data” has the same meaning as in Parts 5 to 7 of the Data Protection Act 2018 (see section 3(2) and (14) of that Act); “public authority” has the meaning given by paragraph (2); “public record” has the same meaning as in section 84 of the Act; “responsible authority”, in relation to a transferred public record, has the same meaning as in section 15(5) of the Act; “Scottish public authority” means— a body referred to in section 80(2) of the Act; and insofar as not such a body, a Scottish public authority as defined in section 3 of the Freedom of Information (Scotland) Act 2002; “transferred public record” has the same meaning as in section 15(4) of the Act; and “the UK GDPR” has the same meaning as in Parts 5 to 7 of the Data Protection Act 2018 (see section 3(10) and (14) of that Act); “working day” has the same meaning as in section 10(6) of the Act. (2) Subject to paragraph (3), “public authority” means— (a) government departments; (b) any other public authority as defined in section 3(1) of the Act, disregarding for this purpose the exceptions in paragraph 6 of Schedule 1 to the Act, but excluding— (i) any body or office-holder listed in Schedule 1 to the Act only in relation to information of a specified description; or (ii) any person designated by Order under section 5 of the Act; (c) any other body or other person, that carries out functions of public administration; or (d) any other body or other person, that is under the control of a person falling within sub-paragraphs (a), (b) or (c) and— (i) has public responsibilities relating to the environment; (ii) exercises functions of a public nature relating to the environment; or (iii) provides public services relating to the environment. (3) Except as provided by regulation 12(10) a Scottish public authority is not a “public authority” for the purpose of these Regulations. (4A) In these Regulations, references to the UK GDPR and the Data Protection Act 2018 have effect as if in Article 2 of the UK GDPR and Chapter 3 of Part 2 of that Act (exemptions for manual unstructured processing and for national security and defence purposes)— (a) the references to an FOI public authority were
Environmental Information Regulations 2004, reg. 2, contiguous excerpt 3references to a public authority as defined in these Regulations, and (b) the references to personal data held by such an authority were to be interpreted in accordance with regulation 3(2). (5) Except as provided by this regulation, expressions in these Regulations which appear in the Directive have the same meaning in these Regulations as they have in the Directive.
Environmental Information Regulations 2004, reg. 3(1) Subject to paragraphs (3) and (4), these Regulations apply to public authorities. (2) For the purposes of these Regulations, environmental information is held by a public authority if the information— (a) is in the authority’s possession and has been produced or received by the authority; or (b) is held by another person on behalf of the authority. (3) These Regulations shall not apply to any public authority to the extent that it is acting in a judicial or legislative capacity. (4) These Regulations shall not apply to either House of Parliament to the extent required for the purpose of avoiding an infringement of the privileges of either House. (5) Each government department is to be treated as a person separate from any other government department for the purposes of Parts 2, 4 and 5 of these Regulations.
Environmental Information Regulations 2004, reg. 5(1) Subject to paragraph (3) and in accordance with paragraphs (2), (4), (5) and (6) and the remaining provisions of this Part and Part 3 of these Regulations, a public authority that holds environmental information shall make it available on request. (2) Information shall be made available under paragraph (1) as soon as possible and no later than 20 working days after the date of receipt of the request. (3) To the extent that the information requested includes personal data of which the applicant is the data subject, paragraph (1) shall not apply to those personal data. (4) For the purposes of paragraph (1), where the information made available is compiled by or on behalf of the public authority it shall be up to date, accurate and comparable, so far as the public authority reasonably believes. (5) Where a public authority makes available information in paragraph (b) of the definition of environmental information, and the applicant so requests, the public authority shall, insofar as it is able to do so, either inform the applicant of the place where information, if available, can be found on the measurement procedures, including methods of analysis, sampling and pre-treatment of samples, used in compiling the information, or refer the applicant to a standardised procedure used. (6) Any enactment or rule of law that would prevent the disclosure of information in accordance with these Regulations shall not apply.
- Source 38: The Environmental Information (Scotland) Regulations 2004Official textOur page on this source
Show the 3 quoted extracts
Environmental Information (Scotland) Regulations 2004, reg. 2, contiguous excerpt 1(1) In these Regulations– “the Act” means the Freedom of Information (Scotland) Act 2002 ; “applicant” means any person who requests that environmental information be made available; “the Commissioner” means the Scottish Information Commissioner constituted by section 42 of the Act; “the data protection principles” means the principles set out in— Article 5(1) of the UK GDPR , and section 34(1) of the Data Protection Act 2018; “data subject” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act); “the Directive” means Directive 2003/4/EC of the European Parliament and of the Council on public access to environmental information and repealing Council Directive 90/313/EEC ; “environmental information” has the same meaning as in Article 2(1) of the Directive, namely any information in written, visual, aural, electronic or any other material form on– the state of the elements of the environment, such as air and atmosphere, water, soil, land, landscape and natural sites including wetlands, coastal and marine areas, biological diversity and its components, including genetically modified organisms, and the interaction among these elements; factors, such as substances, energy, noise, radiation or waste, including radioactive waste, emissions, discharges and other releases into the environment, affecting or likely to affect the elements of the environment referred to in paragraph (a); measures (including administrative measures), such as policies, legislation, plans, programmes, environmental agreements, and activities affecting or likely to affect the elements and factors referred to in paragraphs (a) and (b) as well as measures or activities designed to protect those elements; reports on the implementation of environmental legislation; costs benefit and other economic analyses and assumptions used within the framework of the measures and activities referred to in paragraph (c); and the state of human health and safety, including the contamination of the food chain, where relevant, conditions of human life, cultural sites and built structures inasmuch as they are or may be affected by the state of the elements of the environment referred to in paragraph (a) or, through those elements, by any of the matters referred to in paragraphs (b)
Environmental Information (Scotland) Regulations 2004, reg. 2, contiguous excerpt 2and (c); ... “personal data” has the same meaning as in Parts 5 to 7 of the Data Protection Act 2018 (see section 3(2) and (14) of that Act); “Scottish public authority” means– any body which, any other person who, or the holder of any office which is– listed in schedule 1 to the Act (but subject to any qualification in that schedule), or designated by order under section 5(1) of the Act; a publicly-owned company as defined by section 6 of the Act; any other Scottish public authority with mixed functions or no reserved functions (within the meaning of the Scotland Act 1998 ); and any other person who is neither a public body nor the holder of a public office and who is under the control of a person or body falling within paragraphs (a), (b) or (c) of this definition and– has public responsibilities relating to the environment; exercises functions of a public nature relating to the environment; or provides public services relating to the environment; and “the UK GDPR ” has the same meaning as in Parts 5 to 7 of the Data Protection Act 2018 (see section 3(10) and (14) of that Act); “working day” has the same meaning as in section 73 of the Act. (2) For the purpose of these Regulations, environmental information is held by a Scottish public authority if it is– (a) in its possession and it has been produced or received by that authority; or (b) held by another person on that authority’s behalf, and, in either case, it has not been supplied by a Minister of the Crown or department of the Government of the United Kingdom and held in confidence. (3A) In these Regulations, references to the UK GDPR and the Data Protection Act 2018 have effect as if in Article 2 of the UK GDPR and Chapter 3 of Part 2 of that Act (exemptions for manual unstructured processing and for national security and defence purposes) — (a) the references to an FOI public authority were references to a Scottish public authority as defined in these Regulations, and (b) the references to personal data held by such an authority were to be interpreted in accordance with paragraph (2) of this regulation. (4) Subject to paragraphs (1), (2) and (3), expressions in these Regulations which appear in the Directive have the same meaning in these Regulations as they have in the Directive.
Environmental Information (Scotland) Regulations 2004, reg. 5(1) Subject to paragraph (2), a Scottish public authority that holds environmental information shall make it available when requested to do so by any applicant. (2) The duty under paragraph (1)– (a) shall be complied with as soon as possible and in any event no later than 20 working days after the date of receipt of the request; and (b) is subject to regulations 6 to 12. (3) Any enactment or rule of law which would prevent the making available of information in accordance with these Regulations shall not apply. (4) A Scottish public authority shall, in making environmental information compiled by it available in accordance with paragraph (1), ensure so far as practicable that that information is up to date, accurate and comparable. (5) Where information of the kind referred to in paragraph (b) of the definition of “environmental information” in regulation 2(1) is made available, the authority shall, if the applicant so requests, provide such information as is available to it of the place where information can be found on the measurement procedures, including methods of analysis, sampling and pre treatment of samples, used in compiling the information, or refer the applicant to the standardised procedure used.
- Source 39: Claims against National Highways (Red Claims)Open the sourceOur page on this source
Show the 4 quoted extracts
National Highways, 'Claims against National Highways (Red Claims)': 'Making a claim against National Highways' › 'Incident causing damage or injury'If you have been injured or your property has been damaged when you were using our roads, you may be able to claim reimbursement for your losses. However, there is no automatic right to compensation or damages. The law makes it clear that highway authorities cannot be blamed for everything that happens on their roads. Although National Highways maintains the SRN, it cannot be held responsible for every problem which arises: e.g. from the actions of independent contractors and statutory undertakers working on the road, or for the actions of another third party. If you think that National Highways is in some way responsible for the incident causing damage or injury, you will need to provide us with evidence of this. You will have to show that the highway in question has not been maintained appropriately with regards to its importance and use, and/or National Highways has in some way been negligent causing the highways to be dangerous. If this can be proved you then have to show that this was the cause of the incident, and that you have suffered a loss as a result. Even if you can prove these things, the law gives a defence to the Highway Authority, and it will not have to compensate you if it can demonstrate that it took reasonable steps to ensure the highway was safe. This means that all inspections and repairs had been carried out as planned or reported. Unfortunately, incidents do occur; however, very few are actually attributable to negligence on the part of the Highway Authority.
National Highways, 'Claims against National Highways (Red Claims)': 'Making a claim against National Highways' › 'What happens when I make a claim?'Important - Please read the following notes before completing the form. If you still feel it's appropriate to report a claim, a fully completed form will help process your case as quickly as possible. Please be aware that all cases for which we have a correctly and fully completed report form are thoroughly investigated and this can be a lengthy process. We aim to acknowledge receipt within 21 days of receiving a claim and reach a decision on liability 90 days thereafter. Once you have submitted your completed form we will investigate the circumstances in the light of the information you have provided. You may be asked to come to a site meeting with either a member of National Highways or our managing agents. You might also need to provide extra evidence to support your claim. When we have finished our investigations, which we would hope to conclude within 90 days of acknowledging receipt of your fully completed form, we will tell you whether we reject or accept your claim. It may be that someone else is responsible for causing the incident or that the place where it happened is the responsibility of others. If this is the case we will let you know and your claim should be against them, not National Highways.
National Highways, 'Claims against National Highways (Red Claims)': 'Making a claim against National Highways' › 'How is a claim decided?'Our decision will be based on the facts and the law, and will always reflect what we believe to be the attitude of the courts. For example, if we believe the courts would reject a claim, we will do the same. If, on the other hand, we believe that the courts would award compensation, we will offer to settle.
National Highways, 'Claims against National Highways (Red Claims)': 'Making a claim against National Highways' › 'Evidence of financial loss or injury'You must provide details of your losses and expenditure to support your claim for damage to property. Please send copies of documents and receipted invoices in the first instance but make sure that you keep the originals as we may ask for these at a later stage. For cases involving damage to property, it is advisable to repair the damaged property as quickly as possible as any party paying compensation will only settle the original loss and not any subsequent losses. It is not our normal practice, for example, to pay for a hire car. If you have been injured, we might pass the papers to the Government Legal Department who may ask for medical evidence from your doctor or other supporting evidence if, for example, you have an additional claim for loss of earnings. By law you must keep your losses to a minimum.
- Source 40: The Trunk Road NetworkOpen the sourceOur page on this source
Show the 3 quoted extracts
Transport Scotland, 'The Trunk Road Network': 'Overview'The trunk road and motorway network connects Scotland's major cities, towns, airports and ports enabling the movement of people, goods and services. It is Scottish Ministers’ single biggest asset. The network is hugely diverse, ranging from the ten-lane M8 in the centre of Glasgow to single carriageway sections in the west Highlands. Frequently asked questions about the Scottish trunk road network The trunk road and motorway network is 3,507 km (2,179 miles) long, including slip roads and roundabouts. It has a gross asset value of over £20.8 billion and represents 6% of the total Scottish road network. It carries 35% of all traffic and 60% of heavy goods vehicles. View map of the Trunk Road Network
Transport Scotland, 'The Trunk Road Network': 'Operating Companies and DBFO Companies', contiguous excerpt 1Transport Scotland has contracts in place with Operating Companies to ensure Scottish trunk roads are safe, efficient and well managed. Maintaining the condition of our trunk road and motorway network is vital to the economy of Scotland. Network Management Unit | Operating Company | Start Date | End Date | Maximum extension | Contact | Phone | Website Address South West Unit | Amey | 16 August 2020 | 15 August 2028 | Up to 15 August 2032 | OCCR-southwest@amey.co.uk | 0800 042 0188 | SW Trunk Roads South East Unit | Bear Scotland | 16 August 2020 | 15 August 2028 | Up to 15 August 2032 | enquiries@bearscotland.co.uk | 01738 448 600 | South East Trunk Roads - BEAR Scotland North West Unit | Bear Scotland | 16 August 2022 | 15 August 2030 | Up to 15 August 2034 | enquiries@bearscotland.co.uk | 01738 448 600 | North West Trunk Roads - BEAR Scotland North East Unit | Amey | 16 August 2022 | 15 August 2030 | Up to 15 August 2034 | occr-northeast@amey.co.uk | 08000 830084 | NE Trunk Roads Operating company contracts Work is carried out by Operating Companies working under separate contracts. These contracts are divided into 4 regional units. The two South unit contracts commenced in 2020 and the two North contracts commenced in 2022. These contracts have a duration of eight years, with the option to extend up to a maximum of a further four years at the sole discretion of the Scottish Ministers. These contracts are operated as follows: North West – operated by BEAR Scotland since 16 August 2022 North East – operated by Amey since 16 August 2022 South East – operated by BEAR Scotland since 16 August 2020 South West – operated by Amey since 16 August 2020 Maintenance duties Day-to-day work involves: Inspection, maintenance and repair of road surfaces, bridges and other infrastructure Grass cutting and weed control Gully cleaning Salting and snow clearing Repairs to street lighting and traffic signals Overseeing works carried out by contractors and utility companies Value for money These contracts employ 1,200 staff directly and 100 more through sub-contracts. To ensure these contracts deliver value for money, Transport Scotland has in place a Performance Audit Group (PAG) who audit, monitor and report on the financial, technical and performance aspects of the Operating
Transport Scotland, 'The Trunk Road Network': 'Operating Companies and DBFO Companies', contiguous excerpt 2Companies to an agreed strategy. This involves more than 80 detailed audits per annum, monitoring of more than 1,200 road works sites each year and reporting on the financial, technical and performance aspects of the Operating Companies. PAG also reviews payment requests from the Operating Companies and carries out inter-unit comparisons. Design, Build, Finance and Operate (DBFO) contracts Some maintenance and management services carried out on the trunk road network are not the Operating Company’s responsibility. These include the following DBFO Contracts: DBFO | Managing Agent | Operating & Maintenance Company | Start Date | End Date | Contact | Phone | Website Address M80 | Highway Management Scotland (HMG) | Bear Scotland | 16/01/09 | 22/09/41 | enquiries@bearscotland.co.uk | 01738 448 600 | M80 Stepps to Haggs - BEAR Scotland M74 | Autolink Concessionaires (M6) PLC | Sir Robert McAlpine | 29/07/97 | 28/07/27 | None - use Phone No | 0845 796 6666 | None M77 | Balfour Beatty Construction Services Ltd | Connect Roads | 2003 | 2035 | connect@connectroads.com | 02071213780 | M77/GSO | Our Roads | Connect Roads AWPR/ B-T | Aberdeen City Council | Aberdeen Roads Limited | 2014 | November 2047 | Contact Us | Aberdeen Roads Limited | 0800 028 1414 | About Us | Aberdeen Roads Limited M8 M73 M74 Motorway Improvements Project | Scottish Roads Partnership (SRP) | Amey | April 2017 | March 2047 | info@scotroadspartnership.co.uk | 0800 042 0188 | Home page (m8dbfo.co.uk)
- Source 41: ClaimsOpen the sourceOur page on this source
Show the quoted extract
Traffic Wales, 'Claims'North and Mid Wales Trunk Road Agent and South Wales Trunk Road Agent manage the process of recovering claims for third party damage to Welsh Government property. Our teams also collate information and co-ordinate the management of the process of defending claims against the Welsh Government. The Welsh Ministers are the highway authority for all trunk roads and motorways in Wales. In addition the Welsh Ministers are the owner of assets such as structures, land and property. The Welsh Ministers have a statutory duty to maintain the highway and its assets and will seek to recover costs for any damage to its roads, motorways and assets from the third party deemed liable. The Welsh Government will investigate all claims of damage and will be the data controller for the personal data received. It is necessary for us to collect this information in order for us to comply with our legal obligations in investigating and administering our claim, being the Highways Act 1980 and the Government of Wales Act 2006 respectively. For information about how we process personal data relating to third party claims, please refer to our privacy policy. Information about the claims process if you have been involved in an accident on our road network
- Source 42: Claim compensation due to a road or street problemOpen the sourceOur page on this source
Show the 6 quoted extracts
nidirect, 'Claim compensation due to a road or street problem' (introduction)If your property or vehicle has been damaged, or you’ve suffered a personal injury, due to a road or street problem and you believe the Department for Infrastructure (DfI) is responsible, you can make a claim for compensation. There is no automatic entitlement to compensation. Each claim must be investigated.
nidirect, 'Claim compensation due to a road or street problem': 'Report the problem that you believe caused damage'If you have not yet reported the problem that you believe caused the property damage, vehicle damage, or personal injury, do this by choosing one of the pages in the following section: Problems with roads and streets Keep a note of the 'W' reference number you're given after reporting it, as you will be asked for this when completing a claim form.
nidirect, 'Claim compensation due to a road or street problem': 'Photographs'You must send photographs of the damage to your property or vehicle so your claim can be processed. Providing clear, dated photographs will help with quicker processing. Photographs of the defect (that is, the problem on the road or street) and incident location for your vehicle damage, property damage or personal injury claim should only be taken if it is safe to do so. Before taking photographs of the defect and incident location, you should consider things such as: the amount of traffic the speed restriction of the road your visibility to other road users whether the area is well lit if you’re taking photographs during the hours of darkness if it's possible to take photographs from a footway (pavement) or from within your vehicle At all times, you must consider the risks involved in taking these photographs before doing so. If you can provide photographs of the defect and incident location, try to include: close-up shots of the defect - that is, the problem on the road/ street that caused the damage/ injury and of the same defect or roads-related issue at a distance showing the surrounding area and any identifiable landmarks, which are crucial in identifying the precise incident location If you do not provide the requested photographs this could significantly delay the investigation of your claim.
nidirect, 'Claim compensation due to a road or street problem': 'Things to note'You should keep the damaged parts/ items as these may need to be inspected by a representative acting on behalf of the Department for Infrastructure (DfI). For vehicle damage and property claims: valued over £350 - receipts or three estimates/ quotations are required valued below £350 - receipts or two estimates/ quotations are required You must keep all original receipts/ estimates about the claim, as the originals may be needed by DfI to complete your claim. If you're unable to scan copies of the requested documents, clear and readable photographs will be accepted by DfI for the initial assessment of your claim. If the claim is for personal injury and you're the claimant and are under 18 years of age (a minor), you must nominate a parent or other representative to make this claim on your behalf.
nidirect, 'Claim compensation due to a road or street problem': 'Getting compensation'Compensation is not guaranteed. DfI must thoroughly investigate every claim to see if it has a defence to the allegations made. When its investigations are complete, you will be told of its decision in writing. Property and vehicle damage If the decision is taken to pay compensation, the amount offered will be the amount estimated to return your property or vehicle to the condition it was in immediately before the damage. There is no legal entitlement to provide 'new for old', therefore the amount of compensation paid may be less than the amount claimed. Personal injury only If DfI makes an offer of compensation for an injury to a minor, the matter will be referred to a judge to assess if the compensation is fair. Any compensation paid will be held by the court until the minor reaches the age of 18.
nidirect, 'Claim compensation due to a road or street problem': 'Meeting at the accident site'Personal injury and vehicle damage only Providing clear, dated photographs as mentioned in the 'Photographs' section above may mean that a meeting on site might not be necessary. If DfI can't identity the exact location from the photographs, a meeting may be arranged with a member of its staff so that you can show the exact location. Property damage and vehicle damage During its investigation, it may be necessary for a DfI staff member to find the cause of and inspect the damage to your property or vehicle. In some cases, DfI may use the services of a loss adjuster to inspect the damage to your property or vehicle and to advise on the financial aspects of a claim. Such visits form part of DfI's investigations and do not mean that it is accepting liability. If you have already carried out the repairs, keep evidence of the damage by either keeping the damaged item(s), where possible, or providing photographs of the damage.
- Source 43: Claim compensation due to a road or street problemOpen the sourceOur page on this source
Show the 2 quoted extracts
nidirect, 'Claim compensation due to a road or street problem': 'Why another party might be involved'From investigations, it may be established that a contractor, utility company, or another person or organisation was responsible for the incident. In those circumstances, details will be passed to that person or organisation to investigate your claim further.
nidirect, 'Claim compensation due to a road or street problem': 'If a claim relates to the sewerage and water'Northern Ireland Water Ltd is responsible for supplying water and sewerage services, and the company has its own claims-handling procedures. If your claim is because of flooding or any other actions or operations taken by or on behalf of NI Water, you should contact Waterline to ask for a claim form. Waterline: 0345 744 0088 Contacting 08 and 03 telephone numbers Further information may be found at this link: Flooding in your area
- Source 44: Tindall and another v Chief Constable of Thames Valley PoliceRead the judgmentOur page on this source
Show the 4 quoted extracts
Tindall and another v Chief Constable of Thames Valley Police [2024] UKSC 33, [44]Having examined some of the main cases, we can summarise the central principles to be derived from them as follows: (i) There is a fundamental distinction, drawn in all the above cases, between making matters worse, where the finding of a duty of care is commonplace and straightforward, and failing to confer a benefit (including failing to protect a person from harm), where there is generally no duty of care owed. (ii) An example of the former (making matters worse), where there was held to be a duty of care owed by the police, is Robinson. As regards other emergency services, a more difficult example is the Hampshire case in Capital & Counties (turning off the sprinkler system). All the other cases mentioned fell on the other side of the line. (iii) A difficulty in drawing the distinction (between making matters worse and failing to protect from harm) is how to identify the baseline relative to which one judges whether the defendant has made matters worse: see Sandy Steel, “Rationalising omissions liability in negligence” (2019) 135 LQR 484, 487. The cases show that the relevant comparison is with what would have happened if the defendant had done nothing at all and had never embarked on the activity which has given rise to the claim. The starting point is that the defendant generally owes no common law duty of care to undertake an activity which may result in benefit to another person. So it is only if carrying out the activity makes another person worse off than if the activity had not been undertaken that liability can arise. (iv) Another way of stating the general rule is to say that a person owes a duty to take care not to expose others to unreasonable and reasonably foreseeable risks of physical harm created by that person’s own conduct. By contrast, no duty of care is in general owed to protect others from risks of physical harm which arise independently of the defendant’s conduct - whether from natural causes (as in East Suffolk) or third parties (as in Michael and Ancell). (v) Although not made out in any of the above six cases, there are exceptions to the general rule that there is no duty of care to protect a person from harm, for example, where the defendant has assumed a responsibility to do so or has control of a third party.
Tindall and another v Chief Constable of Thames Valley Police [2024] UKSC 33, [45]A further point may usefully be made about the need to view the defendant’s activity as a whole. This dispels the objection that it can be difficult or even arbitrary to distinguish between acts and omissions. Take, for example, what Lord Nicholls of Birkenhead in Stovin v Wise [1996] AC 923, 930, described as the classic illustration of failing to apply the handbrake when parking a car, with the result that the car rolls down a hill and causes damage to another vehicle. On one view the damage in this example results from a mere omission. Any difficulty in explaining the common sense conclusion that the driver owes a duty of care disappears, however, when the focus is directed at the whole activity (of driving) and the question is asked whether the damage would have occurred if the defendant had not engaged in that activity. Plainly the answer is “no”. So viewed, it can readily be seen that the case is one of making matters worse.
Tindall and another v Chief Constable of Thames Valley Police [2024] UKSC 33, [58]We also agree with the claimant that the detailed formulation of the interference principle by McBride and Bagshaw is correct. In particular, it is not enough to show that the defendant has acted in a way which had the effect of putting off or preventing someone else from helping the claimant. Rather, in line with the well-established approach to establishing any duty of care, for a duty of care to arise it is necessary to show that the defendant knew or ought to have known (ie that it was reasonably foreseeable) that its conduct would have this effect.
Tindall and another v Chief Constable of Thames Valley Police [2024] UKSC 33, [84]Counsel for the claimant rightly eschewed reliance on any argument that the existence of a power of control, without an actual exercise of control, is capable of giving rise to a duty of care. At times, however, they appeared to suggest that a duty of care could arise from the fact that the police took steps - attending the scene with blue emergency lights flashing and putting up a sign to encourage motorists to slow down - which temporarily reduced the risk of another accident but which were then terminated when the police left (taking the sign with them). Any such argument is untenable. As illustrated by cases such as East Suffolk, Ancell, Capital & Counties (in particular, the London case) and Gorringe, taking steps which are ineffectual, whether because they are inadequate to begin with or because the defendant does not persist in them, cannot give rise to a duty of care.
- Source 45: Limitation Act 1980Official textOur page on this source
Show the 2 quoted extracts
Limitation Act 1980, s. 2An action founded on tort shall not be brought after the expiration of six years from the date on which the cause of action accrued.
Limitation Act 1980, s. 11(1) This section applies to any action for damages for negligence, nuisance or breach of duty (whether the duty exists by virtue of a contract or of provision made by or under a statute or independently of any contract or any such provision) where the damages claimed by the plaintiff for the negligence, nuisance or breach of duty consist of or include damages in respect of personal injuries to the plaintiff or any other person. (1A) This section does not apply to any action brought for damages under section 3 of the Protection from Harassment Act 1997. (2) None of the time limits given in the preceding provisions of this Act shall apply to an action to which this section applies. (3) An action to which this section applies shall not be brought after the expiration of the period applicable in accordance with subsection (4) or (5) below. (4) Except where subsection (5) below applies, the period applicable is three years from— (a) the date on which the cause of action accrued; or (b) the date of knowledge (if later) of the person injured. (5) If the person injured dies before the expiration of the period mentioned in subsection (4) above, the period applicable as respects the cause of action surviving for the benefit of his estate by virtue of section 1 of the Law Reform (Miscellaneous Provisions) Act 1934 shall be three years from— (a) the date of death; or (b) the date of the personal representative’s knowledge; whichever is the later. (6) For the purposes of this section “personal representative” includes any person who is or has been a personal representative of the deceased, including an executor who has not proved the will (whether or not he has renounced probate) but not anyone appointed only as a special personal representative in relation to settled land; and regard shall be had to any knowledge acquired by any such person while a personal representative or previously. (7) If there is more than one personal representative, and their dates of knowledge are different, subsection (5)(b) above shall be read as referring to the earliest of those dates.
- Source 46: Prescription and Limitation (Scotland) Act 1973Official textOur page on this source
Show the 2 quoted extracts
Prescription and Limitation (Scotland) Act 1973, s. 6(1) If, after the appropriate date, an obligation to which this section applies has subsisted for a continuous period of five years— (a) without any relevant claim having been made in relation to the obligation, and (b) without the subsistence of the obligation having been relevantly acknowledged, then as from the expiration of that period the obligation shall be extinguished: Provided that in its application to an obligation under a bill of exchange or a promissory note this subsection shall have effect as if paragraph (b) thereof were omitted. (2) Schedule 1 to this Act shall have effect for defining the obligations to which this section applies. (3) In subsection (1) above the reference to the appropriate date, in relation to an obligation of any kind specified in Schedule 2 to this Act is a reference to the date specified in that Schedule in relation to obligations of that kind, and in relation to an obligation of any other kind is a reference to the date when the obligation became enforceable. (4) In the computation of a prescriptive period in relation to any obligation for the purposes of this section— (a) any period during which by reason of— (i) fraud on the part of the debtor or any person acting on his behalf, or (ii) error induced by words or conduct of the debtor or any person acting on his behalf, the creditor failed to make a relevant claim in relation to the obligation, and (b) any period during which the original creditor (while he is the creditor) was under legal disability, shall not be reckoned as, or as part of, the prescriptive period: Provided that any period such as is mentioned in paragraph (a) of this subsection shall not include any time occurring after the creditor could with reasonable diligence have discovered the fraud or error, as the case may be, referred to in that paragraph. (4A) For the purposes of subsection (4)(a), it does not matter whether the debtor, or the person acting on the debtor's behalf, intended the fraud or the words or conduct to cause the creditor to fail to make a relevant claim. (5) Any period such as is mentioned in paragraph (a) or (b) of subsection (4) of this section shall not be regarded as separating the time immediately before it from the time immediately after it.
Prescription and Limitation (Scotland) Act 1973, s. 17(1) This section applies to an action of damages where the damages claimed consist of or include damages in respect of personal injuries, being an action (other than an action to which section 18 of this Act applies) brought by the person who sustained the injuries or any other person. (1A) This section does not apply to an action of damages in respect of personal injuries to which section 18ZA applies. (2) Subject to subsection (3) below and section 19A of this Act, no action to which this section applies shall be brought unless it is commenced within a period of 3 years after— (a) the date on which the injuries were sustained or, where the act or omission to which the injuries were attributable was a continuing one, that date or the date on which the act or omission ceased, whichever is the later; or (b) the date (if later than any date mentioned in paragraph (a) above) on which the pursuer in the action became, or on which, in the opinion of the court, it would have been reasonably practicable for him in all the circumstances to become, aware of all the following facts— (i) that the injuries in question were sufficiently serious to justify his bringing an action of damages on the assumption that the person against whom the action was brought did not dispute liability and was able to satisfy a decree; (ii) that the injuries were attributable in whole or in part to an act or omission; and (iii) that the defender was a person to whose act or omission the injuries were attributable in whole or in part or the employer or principal of such a person. (3) In the computation of the period specified in subsection (2) above there shall be disregarded any time during which the person who sustained the injuries was under legal disability by reason of nonage or unsoundness of mind.
- Source 47: The Limitation (Northern Ireland) Order 1989Official textOur page on this source
Show the 4 quoted extracts
Limitation (Northern Ireland) Order 1989, art. 6(1) Subject to paragraph (2) and to Articles 7 and 9 and 11 to 13, an action founded on tort may not be brought after the expiration of six years from the date on which the cause of action accrued. (2) Subject to Article 51, an action for damages for— (a) libel or slander; or (b) slander of title, slander of goods or other malicious falsehood, may not be brought after the expiration of one year from the date on which the cause of action accrued.
Limitation (Northern Ireland) Order 1989, art. 7, contiguous excerpt 1(1) This Article applies to any action for damages for negligence, nuisance or breach of duty (whether the duty exists by virtue of a contract or of provision made by or under a statute or independently of any contract or any such provision) where the damages claimed by the plaintiff for the negligence, nuisance or breach of duty consist of or include damages in respect of personal injuries to the plaintiff or any other person. (1A) This Article does not apply to any action brought for damages under Article 5 of the Protection from Harassment (Northern Ireland) Order 1997. (2) Articles 4 and 6 do not apply to an action to which this Article applies. (3) Subject to Article 50, an action to which this Article applies may not be brought after the expiration of the period specified in paragraphs (4) and (5). (4) Except where paragraph (5) applies, that period is three years from— (a) the date on which the cause of action accrued, or (b) the date of knowledge (if later) of the person injured. (5) If the person injured dies before the expiration of the period in paragraph (4), the period as respects the cause of action surviving for the benefit of the estate of the deceased by virtue of section 14 of the Law Reform (Miscellaneous Provisions) Act (Northern Ireland) 1937 is three years from— (a) the date of death; or (b) the date of the personal representative's knowledge, whichever is the later. (6) Subject to paragraph (7), in this Article and in Article 9, references to a person's date of knowledge are references to the date on which he first had knowledge of the following facts— (a) that the injury in question was significant; and (b) that that injury was attributable in whole or in part to the act or omission which is alleged to constitute negligence, nuisance or breach of duty; and (c) the identity of the defendant; and (d) if it is alleged that the act or omission was that of a person other than the defendant, the identity of that person and the additional facts supporting the bringing of an action against the defendant, and knowledge that any acts or omissions did or did not, as a matter of law, involve negligence, nuisance or breach of duty is irrelevant. (7) In Article 8 and in Article 9 so far as that Article applies to an action by virtue of Article 9(1)
Limitation (Northern Ireland) Order 1989, art. 7, contiguous excerpt 2of the Consumer Protection (Northern Ireland) Order 1987 (death caused by defective product) references to a person's date of knowledge are references to the date on which he first had knowledge of the following facts— (a) such facts about the damage caused by the defect as would lead a reasonable person who had suffered such damage to consider it sufficiently serious to justify his instituting proceedings for damages against a defendant who did not dispute liability and was able to satisfy a judgment; and (b) that the damage was wholly or partly attributable to the facts and circumstances alleged to constitute the defect; and (c) the identity of the defendant; but, in determining the date on which a person first had such knowledge there is to be disregarded both the extent (if any) of that person's knowledge on any date of whether particular facts or circumstances would or would not, as a matter of law, constitute a defect and, in a case relating to loss of or damage to property, any knowledge which that person had on a date on which he had no right of action by virtue of Part II of that Order in respect of the loss or damage. (8) For the purposes of paragraph (6) an injury is significant if the person whose date of knowledge is in question would reasonably have considered it sufficiently serious to justify his instituting proceedings for damages against a defendant who did not dispute liability and was able to satisfy a judgment. (9) For the purposes of paragraph (6) a person's knowledge includes knowledge which he might reasonably have been expected to acquire— (a) from facts observable or ascertainable by him; or (b) from facts ascertainable by him with the help of medical or other appropriate expert advice which it is reasonable for him to seek, but a person is not to be fixed under this paragraph with knowledge of a fact ascertainable only with the help of expert advice so long as he has taken all reasonable steps to obtain (and, where appropriate, to act on) that advice. (10) For the purposes of this Article and Article 8— (a) “personal representative” includes any person who is or has been a personal representative of the deceased, including an executor who has not proved the will (whether or not he has renounced probate); and (b) regard is to be had
Limitation (Northern Ireland) Order 1989, art. 7, contiguous excerpt 3to any knowledge acquired by any such person while a personal representative or previously. (11) If there is more than one personal representative and their dates of knowledge are different, paragraph (5)( b ) is to be read as referring to the earliest of those dates.
- Source 48: Safety at Street Works and Road Works: A Code of PracticeOfficial textOur page on this source
Show the 2 quoted extracts
Printed p. 5except motorways and any dual carriageways with a speed limit of 50 mph or more
Printed p. 23, Information boardorganisation undertaking the works, any principal contractor
- Source 49: Traffic Signs Manual, Chapter 8: Traffic Safety Measures and Signs for Road Works and Temporary SituationsOfficial textOur page on this source
Show the 2 quoted extracts
Section 1.1.5, printed p. 10the statutory and contractual force varies across the UK
Section 1.1.1, printed p. 10it cannot provide a definitive legal interpretation, nor can it override them
- Source 50: Specification for the Reinstatement of Openings in HighwaysOfficial textOur page on this source
Show the 2 quoted extracts
Foreword, p. 10comes into force as statutory guidance on 10th May 2021.
S1.1.2, p. 19must comply with this Code and guarantee the performance of the reinstatement
- Source 51: The Specification for the Reinstatement of Openings in HighwaysOfficial textOur page on this source
Show the 2 quoted extracts
Approval instrument, first PDF pageComing into force 24 January 2007
S1.1.1, printed p. 1the Undertaker shall guarantee the performance of the reinstatement
- Source 52: Specification for the Reinstatement of Openings in RoadsOfficial textOur page on this source
Show the 2 quoted extracts
Foreword p. 16will come into operation on 1 October 2023 and replaces the fourth edition in Scotland.
Foreword p. 16does not form part of the statutory code.
- Source 53: Specification for the Reinstatement of Openings in RoadsOfficial textOur page on this source
Show the 2 quoted extracts
Foreword p. 12will come into operation on 1 October 2006.
S1.1.1 p. 17the undertaker shall guarantee the performance of the reinstatement
- Source 54: 114/20: supplementary guidance for the safety at street works and road works a code of practice 2013Open the sourceOur page on this source
Show the quoted extract
Section 1.5both the local authority road network and the trunk road network
- Source 55: Plan and manage roadworksOpen the sourceOur page on this source
Show the quoted extract
Opening descriptionService for local highway authorities, utility companies or contractors within England
- Source 56: Code of practice for the co-ordination of street works and works for road purposes and related mattersOfficial textOur page on this source
Show the quoted extract
Section 4.2the promoter and the expected duration. Actual start and stop data are also provided.
- Source 57: Scottish Road Works Register (SRWR)Open the sourceOur page on this source
Show the quoted extract
Public information paragraphtiming, location, duration and purpose of road works
- Source 58: Sheila Foggoa v Murphy & Sons LimitedRead the judgmentOur page on this source
Show the 2 quoted extracts
[42]non-compliance is not necessarily a breach of duty
[59]The appeal is dismissed.
- Source 59: Morrison Sports Limited and others v Scottish Power UK plcRead the judgmentOur page on this source
Show the quoted extract
[28]in the ordinary case a breach of statutory duty does not, by itself, give rise to any private law cause of action.
- Source 60: Mega Trucking Company Limited v Highways England Company Limited and anotherRead the judgmentOur page on this source
Show the 2 quoted extracts
[167]The level differential had no causative effect on this accident.
[170]This claim for a contribution therefore fails.
- Source 61: British Telecommunication PLC (BT) v Crown Court at CarlisleRead the judgmentOur page on this source
Show the quoted extract
[75]an offence of strict liability
- Source 62: Rhuairidh Mackenzie (AP) v Perth & Kinross Council and othersRead the judgmentOur page on this source
Show the 2 quoted extracts
[60]the absence of the "RAMP AHEAD" sign was a material cause of the accident.
[61]the defenders' fault caused the pursuer's injuries.
- Source 63: Alexandra Esther Boyd v Department for Regional DevelopmentRead the judgmentOur page on this source
Show the 2 quoted extracts
[30]a matter for the trial judge, rather than me.
[51](c)To delete the claim for breach of statutory duty against the Third Parties
- Source 64: Campbell v GordonRead the judgmentOur page on this source
Show the quoted extract
[18], majority judgmentthe interpretation of a particular statutory scheme in its context.
- Source 65: Traffic signs manualOpen the sourceOur page on this source
Show the quoted extract
Update history4 November 2026
- Source 66: Retained EU Case Law: Consultation on the departure from retained EU case law by UK courts and tribunalsOpen the sourceOur page on this source
Show the 3 quoted extracts
Printed p. 12, England and WalesHigh Court judgments will set precedent
Printed p. 13, Outer House of the Court of Sessionnot binding on sheriffs or the Sheriff Appeal Court.
Printed p. 14, Northern Irelandin a similar way to England and Wales.
- Source 67: New Roads and Street Works Act 1991OUR REASONINGOfficial textOur page on this source
Practical inference: ask for the specific site, works, inspection, handover and apparatus records that can establish each duty holder, the condition at collision time and causation. This is not an assertion that every document exists, that the authority holds it, or that every record must be disclosed.
Show the quoted extract
New Roads and Street Works Act 1991, s. 53(1) A street authority shall keep a register showing with respect to each street for which they are responsible such information as may be prescribed with respect to the street works, and such other descriptions of works as may be prescribed, executed or proposed to be executed in the street. (2) The register shall contain such other information, and shall be kept in such form and manner, as may be prescribed. (3) The authority shall make the register available for inspection, at all reasonable hours and free of charge— (a) so far as it relates to restricted information, by any person having authority to execute works of any description in the street, or otherwise appearing to the authority to have a sufficient interest, and (b) so far as it relates to information which is not restricted, by any person. The Secretary of State may make provision by regulations as to the information which is restricted for the purposes of this subsection. (4) The Secretary of State may make arrangements for the duties of street authorities under this section to be discharged by means of one or more central registers kept by a person appointed in pursuance of the arrangements. (4A) In subsection (4) “central register” means a register covering the areas of two or more street authorities. (5) If such arrangements are made the Secretary of State may require street authorities to participate in and make contributions towards the cost of the arrangements. (5A) In particular the Secretary of State may require a street authority to share information in their possession with a person appointed to keep a central register which discharges the duties of that authority under this section. (6) The Secretary of State may by regulations make provision with respect to any register kept in pursuance of this section— (a) requiring the registration of such information as may be prescribed, and (b) requiring the payment of such fee as may be prescribed in respect of the registration of information of any prescribed description; and the regulations may contain provision as to the person responsible for securing the registration of the information and the person liable to pay the fee.
- Source 68: Limitation Act 1980OUR REASONINGOfficial textOur page on this source
Practical precaution inferred from separate statutory litigation time rules: do not assume that a complaint, referral, works guarantee or ordinary correspondence preserves a court claim; obtain advice on the correct protective step and date in the applicable system. No numeric deadline or universal stop-the-clock rule is introduced.
Show the quoted extract
Limitation Act 1980, s. 2An action founded on tort shall not be brought after the expiration of six years from the date on which the cause of action accrued.
- Source 69: The Green Hill Solar Farm Order 2026Official textOur page on this source
Show the quoted extract
Article 8(2)The authority given by paragraph (1) is a statutory right or licence
- Source 70: The Steeple Renewables Project Order 2026Official textOur page on this source
Show the quoted extract
Article 8(2)The authority given by paragraph (1) is a statutory right
Spotted a mistake? Report a mistake in this guide.