THE LEGAL QUESTION
Should a party be permitted to use a replacement engineering expert after interference in the expert joint-statement process, and on what conditions?
The facts
In a building damage and insurance dispute, the claimants sought to replace their structural engineer after their solicitors substantially interfered in drafting an experts’ joint statement. They had waived privilege over significant parts of that process.
What the court decided
Permission for the replacement was granted. The court was not persuaded that the further disclosure sought was necessary on the material already provided.
Why: the reasoning
The judge took account of trial fairness, the timetable, the reasons for replacement, the prior report and the material already disclosed. The case was distinguished from a pejorative instance of expert shopping.
Why it matters and its limits
Later example showing that the precise condition depends on the court’s need for fairness and the material already disclosed.
WHAT IT DOES NOT DECIDE
Construction and insurance litigation with exceptional procedural facts. Only the fact-sensitive exercise of the discretion is used.
Status and authority
PROCEDURAL STAGE
Interlocutory application for replacement expert and consequential directions
APPEAL STATUS · NOT CONFIRMED
No subsequent appellate disposition of this expert ruling verified. The separate appeal referred to in the judgment concerned a party-wall award.
LATER TREATMENT
Used as later treatment of Edwards-Tubb. The reasoning turns on the particular request and extent of earlier waiver and disclosure.
BINDING EFFECT
High Court first-instance ruling applying the expert-evidence authorities in England and Wales. No binding application to other legal systems.
Guides that use this decision
The judgment
This summary explains the decision in general terms and does not replace the judgment. The full text is published at the official source; the passages the guides quote are on the judgment's page.
Sources
The numbers match the sources of the guide this summary was researched for.
[90] Glover and another v Fluid Structural Engineers & Technical Designers Limited and others · [47], [70]–[77], Simon Lofthouse KC
In Edwards-Tubb v. JD Wetherspoon plc [2011] EWCA Civ. 136 the Court of Appeal imposed conditions on a claimant who wished to change expert from the expert originally retained for the purposes of the pre-action protocol for personal injury claims.
I consider permission should be given for Mr Tant to be an expert witness in the field of structural engineering.
In any event, I consider that the extent of disclosure given, in addition to Mr Hardy’s report, meets the concern to ensure that full information is available to the claimants consistent with the authorities to which I have already referred. I am not persuaded that the further disclosure sought is necessary.